- (p* '!co,'o,,
s UNITED STATES NUCLEAR REGULATORY COMMISSION a
y WASHINGTON, D C. 20555
\\,..... /
ALABAMA POWER COMPANY
~
DOCKET NO. 50-364 JOSEPH M. FARLEY NUCLEAR PLANT, UNIT N0. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 18 License No. NPF-8 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Alabama Power Company (the licensee) dated October 8,1982, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
e O
8211060519 821008 PDR ADOCK 05000364 P
PDR 4
i
,. 3.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-8 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.18, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of its issuance.
4 F0 THE NUC EAR REGULATORY COMtilSSION rI
),
5tdven arga, Chi f j
Operating Reactors B nch No. 1 Division of Licensing
Attachment:
Changes to the Technical Specifications l
Date of Issuance: October 8, 1982 l
l
s 1
ATTACHMENT TO LICENSE AMENDMENT AMENDMENT NO.18 TO FACILITY OPERATING LICENSE NO. NPF-8 1
DOCKET NO. 50-364 Revise Appendix A as follows:
Remove Page Insert Page 3/4 3-72 3/4 3-72 1
4 l
i 1
4 1
l e
INSTRUMENTATION 3/4.3.4 TURBINE OVERSPEED PROTECTION LIMITING CONDITION FOR OPERATION 3.3.4 At least one turbine overspeed protection s,ystem shall be OPERABLE.
APPLICABJ1.ITY:
MODES 1, 2* and 3*.
ACTION:
a.
With one stop valve or one governor valve per high pressure turbine steam line inoperable and/or with one reheat stop valve or one reheat intercept valve per low pressure turbine steam line inoperable, restore the inoperable valve (s) to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, or close at least one valve in the affected steam line(s) or isolate the turbine from the steam supply within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, b.
With the above required turbine overspeed protection system otherwise inoperable, within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> isolate the turbine from the steam supply.
The provisions of Specification 3.0.4 are not applicable.
c.
(
SURVEILLANCE REQUIREMENTS 4.3.4.1 The provisions of Specification 4.0.4 are not applicable.
4.3.4.2 The above required turbine overspeed protection system shall be demonstrated OPERABLE:
- a.
At.least once per 7 days when the DEH valve test feature is OPERABLE by cycling each of the following valves through at least one complete cycle from the running position.
I 1.
Four high pressure turbine stop valves.
2.
Four high pressure turbine governor valves.
3.
Four low pressure turbine reheat stop valves.
4.
Four low pressure turbine reheat intercept valves.
I
- b.
If the DEH valve test feature is inoperable, restore the test featilie, to OPERABLE status as soon as possible and verify that the governor valves are capable of valve motion at least once per 7 days.
- Specification not applicable with all main steam isolation valves and associated bypass valves in the closed pos". ion and all other steam flow paths to the turbine isolated.
- The provi.sions of Surveillance Requirements 4.3.4.2.a and 4.3.4.2.b are not applicable during the remainder of the first refueling cycle.
FARLEY-UNIT 2 3/4 3-72 AMENDMENT N0. 18