Interim Deficiency Rept Re Brown-Boveri Improper Welding Techniques Used in Fabrication of safety-related Switchgear. Procedures Revised to Include QC Controls.Next Rept Expected by 830112
ML20066A862
Person / Time
Site: Marble Hill
Issue date: 10/29/1982
From: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, S82-12, SVP-0051-82, SVP-51-82, NUDOCS 8211060250
Download: ML20066A862 (2)


Text

- ,..

s ' 'A gQ m,

W} .

PUBLIC SERVICE INDIANA October 29, 1982 S82-12 S. W. Shields SVP-0051-82 Senior Vice President .

Nuclear Division Mr. James G. Keppler Docket Nos.: STN 50-546 Regional Administrator STN 50-547 U. S. Nuclear Regulatory Commission Construction Permit Nos.:

Region III CPPR - 170 799 Roosevelt Road CPPR - 171 Glen Ellyn, Illinois 60137 Marble Hill Nuclear Generating Station - Units 1 and 2

Dear Mr. Keppler:

On May 25, 1982 Mr. S. J. Brewer of Public Service Company of 3

Indiana, Inc. , PSI) notified your office of a potentially reportable item as required by 10 CFR 50.55(e). During an audit at Brown-Boveri Electric, Inc. (BBC) facilities PSI quality assurance personnel dis-covered that welding techniques not covered by BBC's quality assurance program were being used in the fabrication of safety related switchgear.

Such activities are special processes and should have been controlled by procedure as required by 10 CFR 50, Appendix B, Criterion IX. It was also discovered that no controls were placed on the terminal lug crimping process and certification for circuit breaker wiring was unavailable. With these deficiencies it is possible that installed equipment could differ from that used for IEEE 323/344 qualification.

BBC has revised its procedures to include controls on the aforementioned activities and has been instructed by PSI to identify by nonconformance report all affected equipment. This equipment will then be evaluated for its conformance to the specified design.

This letter is intended to fulfill the requirements of an interim report as required by 10 CFR 50.55(e) . A further report on this item will be filed on or before January 12, 1983. If you have any questions on this report, please feel free to contact me.

Sincerely, S. W. Shields SWS/TDG/bak g1060250821029 s ADocx o3000546 NOV 1 92-PDR P. O. Box 190, New Washington, Indiana 47162 812. 289 .3000 gy

l f w*

PUBUC SERVICE WDIANA October 29, 1982 Letter: J. G. Keppler S82-12 SVP-0051-82 cc: Director of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 J. E. Konklin J. J. Harrison I