ML20066A769
| ML20066A769 | |
| Person / Time | |
|---|---|
| Site: | McGuire |
| Issue date: | 10/27/1982 |
| From: | Tucker H DUKE POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| RO-369-82-72, NUDOCS 8211060210 | |
| Download: ML20066A769 (1) | |
Text
?
DUKE POWER GOMPANY P.O. HOX 33180 Cif.ARLOTTE, N.C. 28242 IIAL II TUCKER Tetzennoxz October 27, 1982 Po4) **
Mr. J. P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II a
rgi 3b30
- }
m a
e ao Re: McGuire Nuclear Station Unit 1
" T.
~
Docket No.
50-369 08'
?.
p C
u~.'
u
'E.
Dear Mr. O'Reilly:
c i
Reportable Occurrence Report R0-369/32-72 was to have been submitted by October 27, 1982. This 30-day Reportable Occurrence (pursuant to Technical Specification 6.9.1.13) concerns Techneial Specification 3.7.6 "Two Indepen-dent Control Area Ventilation Systems Shall Be Operable," which was violated on Septerier 27, 1982. However, investigation of the incident and resolution of the problem is not yet complete. The complete report will be submitted by Novem'aer 5, 1982.
Very truly yours.
Al e. tL Hal B. Tucker NM PBN:scs cc: Director Mr. P. R. Bemis Office of Management and Program Analysis Resident Inspector-NRC U. S. Nuclear Regulatory Commission McGuire Nuclear Station Washington, D. C.
20555 Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway Suite 1500 Atlanta, Georgia 30339
- go?
od g $>
i ggiogocgo ggjj; 2
o
-