ML20066A257
| ML20066A257 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 10/15/1982 |
| From: | Clark R Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20066A241 | List: |
| References | |
| NUDOCS 8211050195 | |
| Download: ML20066A257 (2) | |
Text
.
7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET NO. 50-368 ARKANSAS POWER & LIGHT COMPANY NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE The U. S. Nuclear Regulatory Commission (the Commission) has' issued Amendment No. 35 to Facility Operating License No. NPF-6 issued to Arkansas Power & Light Company (the licensee), which revised the Technical Specifications for. operation of Arkansas Nuclear One, Unit 2 (the facility), located in Pope County, Arkansas. The amendment is effective as of the date of issuance.
The amendment allows for testing of the electrical containment penetration conductor circuit -breakers in accordance with manufacturer's recommendations.
These tests are an' improvement over those previously required since each over-current trip element of the circuit breaker is tested rather-than just the instantaneous trip element.
The application for the amendment complies with the standards and require-ments of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations. The Commission has made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR ' Chapter I, which are set forth in the license amendment.
Prior public notice of this amendment was not required since the amendment does not involve a significant hazards con-sideration.
Sockojffg j
.7590-01 The Commission has determined that the issuance of this amendment will not result in any significant environmental impact and that pursuant to 1
10 CFP. g51.5(d)(4) an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared in connection with the issuance of this amendment.
For further details with respect to this action, see (1) the application for amendment dated August 23, 1982, as supplemented September 22,1982,(2)
Amendment No. 35 to Facility Operating License No. NPF-6, and (3) the Commission's related Safety Evaluation. These items are available for public inspection at the Commission's Public Document Room at 1717 H Street, N.W., Washington, D.C.
20555 and at the Tomlinson Library, Arkansas Tech University, Russellville, Arkansas 72801. A copy of items (2) and (3) may be obtained upon request addressed to the U..S. Nuclear Regulatory Commission, Washington, D.C.
20555, Attention:
Director, Division of Licensing Dated at Bethesda, Maryland, this 15th day of October,1982 FOR THE NUCLEAR REGULATORY COMMISSION f
li Robert A. Clark, Chief Operating Reactors Branch #3 Division of Licensing
- _ - _ - _ _ _ _. _ _ _. _ _ _ _ _. _ _ _.