t OPERATLNG DATA REPORT DOCKET NO. 50-269 DATE 7/15/80 COMPLETED BY J. A. Reavis TELEPHONE (7ala171-8552 OPERATING STATUS N08'5 Oconee Unit 1

1. Unit Name:

June, 1980 Year-to-date and cummulative

2. Reporting Period: capacity factors are calcu-2568
3. Licensed Thermal Power ()lW:): lated using a weighted aver-
4. Nameplate Rating (Gross alwel:

934 age for maximum dependable

5. Design Electrical Rating (Net StWe): 886 capacity.

899

6. . \laximum Dependable Capacity (Gross 31We):-

860

7. Maximum Dependable Capacity (Net StWe)":
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

None

9. Power Level To Which Restricted,if Any (Net MWe):

None

10. Reasons For Restrictions. If Any:

A*

t.

This 51onth Yr..to.Date Cumulative 720.0 - 4,367.0 61,008.0

11. Hours in Reporting Period
12. Number Of Hours Reactor was Critical 629.5 _ 2,951.0 43,465.5
13. Reactor Reserve Shutdown llours 626.4 2,883.1 40,830.2 ,
14. Hours Generator On.Line -
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH) 1,225,907 6,004,677 95,222,796 .

412.850 2,134,640 33,048,940

17. Gross Electrical Energy Generated (MWH) _ _ ,

392,432 2,025,498 31,256,997

18. Net Electrical Energy Generated (MWH) 87.0 66.0 66.9
19. Unit Service Factor
20. Unit Availability Factor 87.0 66.0 ,

67.0

21. Unit Capacity Factor (Using MDC Net) 63.4 53.9 59.3
22. Unit Capacity Factor (Using DER Net) 61.5 52.4 57.8 0.0 10.1 17.6
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each t:

TMI Related Modification - November 1, 1980 - 4 weeks

25. If Shut Down At End Of Report Period. Estimated Date of St:rtup: July 10. 1980
26. Units in Test Status (Prior to Commercial Operationi: Forecast s Ach eved

\

INITIA L CRITICA LITY INITIAL ELECTRICITY _

COMMERCIAL OPER ATION 8211030272 000715 I4/771 PDR ADOCK 05000269 R PDR

=

llNil SillllllOWNS AND PI)wlit its sitirglUNS DOCKET NO. 50-269 UNIT NAhlE Ocnnee t! nil-1 DATE 7/1s/9n Ill.'Pult i AION fil _ June, 1980 C05tPLETED BY t A unui.

TELEI'll0NE (704)373-8552 t- -

=_ *e

=

5w= - E

,E% l.itemcc

--2 :- g -r, c Cauw & Curreceive N. .. 1).ile H

g jgy [Nen, gy {9,o A g ;9,, , , , ,

$E cI 55= ltepnes n tE C EO Prevent Itecureceite e

o

{ v ,

6p 80-06-01 F -

A -

CB MOTORX IBl RCP remains out of service. Will

. require outage for inspection before

. restarting.

4 80-06-27 S 93.59 D 1 ZZ ZZZZZZ NRC required modifications of emergency power supply NSM 1531.

Also inspection of 1B1 RCP lower motor bearing.

d a

.' ,1 I I onceil 4 iteason- kiellit,tl:

, .Y bt bOINIf tl d Iggggppgent IJl]rne ll 3plajn) E shibil C . Imlauaiinis

,l gjjnggi g,,g p, epa,,g g,,,, ,g n,,,

ll blJifileil.1tla C of lcht h.hjagggg3l $cgagig, g{,,g,} ggggggg [,,, g_, gggq.

O l(eluchng .t. Auf teen ele S. : un.

II-lle'j'ttlJitti) l{C118 8. 5 8t:11 Ih.ent l<eptul gg gigt g:ite g 3tigtt,c.

.j .()llges g l;ig g.lJteg g g)l g, g g 2 ,  !. (Ip(8Jlt38 llJitilitg .$ lJL Cll%t* l AJggil83 - att l At!lllfflintfJil%t" 4 b O[%'f JlitHlJI l 81488 (! \l8l Jill) g}ggghggg,3,g,p ggg, l'8/77) ll Othes (Ibpl.iin g 4

s AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-269 LWIT ocnnee Unit 1 DATE 7/15/80 COMPLETED BY J. A. Reavis TELEPHONE (704)373-8552 310NDI June, 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (31We-Neti (31We-Net s 640 -

g7 639 2 643 18 616 3 644 19 632 4 644 20 639 5 643 21 639 6 637 22 639 [

1 7 642 23 639 8 640 24 640 9 627 25 642 10 643 -

26 578

11. 643 27 -

12 598 2S -

13 51 0 29 -

l

! la 639 30 -

15 641 33 16 637 i

INSTRUCTIONS On this format list the aserage daily unit power levelin .\lWe Net for each day in the reourtine anonth. Compute tu l the nearest whole megswatt. s

\

19177)

I DOCKET NO: 50-269 UNIT: oconee Unit _

DATE: 7/15/80 NARRATIVE SUlefARY .

M0h'Ill: . June, 198Q _ ,

Oconee 1 began the month of June at reduced power due to the 1B1 RCP being out of service.

On June 27, the unit was removed from service for modification to the emergency power systems (NSM 1531) required by the NRC. The RCP problem will be corrected during this outage.

4-s e

e O

. MONTHLY REFUELING INFORMATION REQUEST

1. Facility name: Oconee Unit 1 .
2. Scheduled next refueling shutdown: May, 1981 .
3. Scheduled restart following refueling: July, 1981 .
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? Ye8 .

If yes, what will these be? _ Technical Specification Revision i

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? NA .

If no, when is review scheduled? NA *

5. Scheduled date(s) for submitting proposed licensing action and supporting informa tion: Anril. 1981 4- .

k

6. I=portant licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures). None

?

l

7. Number of fuel assemblies (a) in the core: 177 .

(b) in the spent fuel pool: 278 .

8. Present licensed fuel pool capacity: 750 .

Size of requested or planned increase: 1312 .

I

9. Projected date of last refueling which can be accommodated by present .

licensed capacity: .

DUKE POWER COMPANY Date: July 15, 1980 ,

Name of

Contact:

J. A. Reavis ,

_ _ .,