Monthly Operating Rept for June 1980.Repts for Units 2 & 3 Not Included.Narrative Summary Encl
ML20065T951
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 07/15/1980
From: Reavis J
DUKE POWER CO.
To:
Shared Package
ML20065T937 List:
References
NUDOCS 8211030272
Download: ML20065T951 (5)


Text

-

t OPERATLNG DATA REPORT DOCKET NO.

50-269 DATE 7/15/80 COMPLETED BY J. A. Reavis TELEPHONE (7ala171-8552 OPERATING STATUS N08'5 Oconee Unit 1

1. Unit Name:

June, 1980 Year-to-date and cummulative

2. Reporting Period:

capacity factors are calcu-2568

3. Licensed Thermal Power ()lW:):

lated using a weighted aver-934

4. Nameplate Rating (Gross alwel:

age for maximum dependable 886

5. Design Electrical Rating (Net StWe):

capacity.

899

6.. laximum Dependable Capacity (Gross 31We):-

860

\\

7. Maximum Dependable Capacity (Net StWe)":
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

None None

9. Power Level To Which Restricted,if Any (Net MWe):
10. Reasons For Restrictions. If Any:

A*

t.

This 51onth Yr..to.Date Cumulative 4,367.0 61,008.0 720.0

11. Hours in Reporting Period
12. Number Of Hours Reactor was Critical

_ 2,951.0 43,465.5 629.5

13. Reactor Reserve Shutdown llours 626.4 2,883.1 40,830.2
14. Hours Generator On.Line
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH) 1,225,907 6,004,677 95,222,796
17. Gross Electrical Energy Generated (MWH) 412.850 2,134,640 33,048,940
18. Net Electrical Energy Generated (MWH) 392,432 2,025,498 31,256,997 87.0 66.0 66.9
19. Unit Service Factor 87.0 66.0 67.0
20. Unit Availability Factor
21. Unit Capacity Factor (Using MDC Net) 63.4 53.9 59.3 61.5 52.4 57.8
22. Unit Capacity Factor (Using DER Net) 0.0 10.1 17.6
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each t:

TMI Related Modification - November 1, 1980 - 4 weeks

25. If Shut Down At End Of Report Period. Estimated Date of St:rtup:

July 10. 1980 Ach eved

26. Units in Test Status (Prior to Commercial Operationi:

Forecast s

\\

INITIA L CRITICA LITY INITIAL ELECTRICITY COMMERCIAL OPER ATION 8211030272 000715 I4/771 PDR ADOCK 05000269 R

PDR

=

llNil SillllllOWNS AND PI)wlit its sitirglUNS DOCKET NO.

50-269 UNIT NAhlE Ocnnee t! nil-1 DATE 7/1s/9n Ill.'Pult i AION fil _ June, 1980 C05tPLETED BY t

A unui.

TELEI'll0NE (704)373-8552 t-5w=

E

=_

  • e

,E%

l.itemcc g -r,

{9, N...

1).ile

--2 :-

=

Cauw & Curreceive c

g jgy

[Nen, gy o

A g ;9,,,,,

$E cI 55=

ltepnes n tE C EO Prevent Itecureceite H

{

v e

o 6p 80-06-01 F

A CB MOTORX IBl RCP remains out of service. Will

. require outage for inspection before

. restarting.

4 80-06-27 S

93.59 D

1 ZZ ZZZZZZ NRC required modifications of emergency power supply NSM 1531.

Also inspection of 1B1 RCP lower motor bearing.

d a

,1 4

I I onceil iteason-kiellit,tl:

E shibil C. Imlauaiinis

.Y bt bOINIf tl d Iggggppgent IJl]rne ll 3plajn)

,l gjjnggi g,,g p, epa,,g g,,,,,g n,,,

ll blJifileil.1tla C of lcht h.hjagggg3l $cgagig, g{,,g,} ggggggg [,,, g_, gggq.

O l(eluchng

.t. Auf teen ele S. : un.

Ih.ent l<eptul gg gigt g:ite g 3tigtt,c.

II-lle'j'ttlJitti) l{C118 8. 5 8t:

.j.()llges g l;ig g.lJteg g g)l g, g g 11 2

!. (Ip(8Jlt38 llJitilitg.$ lJL Cll%t* l AJggil83 -

att l At!lllfflintfJil%t" 4

b O[%'f JlitHlJI l 81488 (! \\l8l Jill) g}ggghggg,3,g,p ggg, l'8/77) ll Othes (Ibpl.iin g 4

s AVERAGE DAILY UNIT POWER LEVEL 50-269 DOCKET NO.

LWIT ocnnee Unit 1 DATE 7/15/80 COMPLETED BY J. A. Reavis TELEPHONE (704)373-8552 310NDI June, 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (31We-Neti (31We-Net s 639 640 g7 2

643 18 616 3

644 19 632 4

644 20 639 5

643 21 639 6

637 22 639

[

1 7

642 23 639 8

640 24 640 9

627 25 642 10 643 26 578 11.

643 27 12 598 2S 13 51 0 29 l

la 639 30 15 641 33 16 637 i

INSTRUCTIONS On this format list the aserage daily unit power levelin.\\lWe Net for each day in the reourtine anonth. Compute tu l

the nearest whole megswatt.

s

\\

19177)

I DOCKET NO:

50-269 UNIT:

oconee Unit _

DATE:

7/15/80 NARRATIVE SUlefARY M0h'Ill:

. June, 198Q Oconee 1 began the month of June at reduced power due to the 1B1 RCP being out of service.

On June 27, the unit was removed from service for modification to the emergency power systems (NSM 1531) required by the NRC.

The RCP problem will be corrected during this outage.

4-s e

e O

MONTHLY REFUELING INFORMATION REQUEST 1.

Facility name:

Oconee Unit 1 2.

Scheduled next refueling shutdown:

May, 1981 3.

Scheduled restart following refueling:

July, 1981 4.

Will refueling or resumption of operation thereafter require a technical Ye8 specification change or other license amendment?

If yes, what will these be? _

Technical Specification Revision i

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? NA If no, when is review scheduled?

NA 5.

Scheduled date(s) for submitting proposed licensing action and supporting informa tion:

Anril. 1981 4-k 6.

I=portant licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

None

?

l 7.

Number of fuel assemblies (a) in the core:

177 (b) in the spent fuel pool:

278 8.

Present licensed fuel pool capacity:

750 Size of requested or planned increase:

1312 I

9.

Projected date of last refueling which can be accommodated by present licensed capacity:

July 15, 1980

DUKE POWER COMPANY Date:

Name of

Contact:

J. A. Reavis

.,