F OPERATING DATA REPORT DOCKET NO.
50-270 DATE 7/15/80 COMPLETED BY
.T. A. Reavis TELEPHONE
/7AAit71-8552 OPERATING STATUS Oconee Unit 2 Notes
- 1. Unit Name.
Year-to-date and cummulative 980
-. Reporting Penod:
capacity factors are calcu-2568 lated using a weighted aver-
- 3. Licensed Thermal Power I)!Wt p:
934
- 4. Nameplate Rating (Gross MWel:
age for maximum dependable 886 capacity.
5.. Design Electrical Rating (Net MWe):
899
- 6. Maximum Dependable Capacity (Gross MWe):
860
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings litems Number 3 Through 7)Since Last Report.Give Reasons:
- 9. Power Level To which Restricted. !f Any INet MWel:
- 10. Reasons For Restrictions. If Any:
4; This Month Yr..to.Date Cumulative 4.367.0 50,928.0 720.0 I1. Hous In Reporting Period 219.7 1,756.0 35,351.9
- 12. Number Of flours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours 134.4 1,656.1 34,432.2
- 14. Hours Generator On.Line
- 15. Urit Reserve Shutdown Hours l
- 16. Gross Thermal Energy Generated (MWH) 189,548 3,515,548 81.562,953 l
- 17. Gross Electrical Energy Generated (MWH) 60.860 1,187,000 27,701,356 l
- 18. Net Electrical Energy Generated (MWH) 47,955 1,113,269 26,277,027 18.7 37.9 67.6 l
- 19. Unit Senice Factor 18.7 37.9 67.6
- 20. Unit Availability Factor 7.7 29.6 59.7
- 21. Unit Capacity Factor (Using MDC Nett 7.5 28.8 58.2
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rare 41.8 6.2 19.5
- 24. Shutdowns Scheduled Over Nest 6 Months (Type. Date.and Duration of Each):
i TMI Related Modification - September 6, 1980 - 4 weeks
(
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
l
- 26. Umts in Test Status (Prior to Commercial Operationi:
Forecast Achieved l
INITIA L CRITICA LITY f
INITIA L ELECTRICITY COMMERCIA L OPER ATION 8211030202 00715 PDR ADOCK 05000270 N/77)
R PDR
~
a
9 (1)
LINil SittilDOWNS AND hlWI R Hl'lillrlloNS DOCKET NO.
50-270 UNIT NAhlE nr.nn o n unif ?
DATE 7/15/80 June, 1980 COStPLETED BY T
A - Donvie RIT~ OR I A10 Nill lELEril0NE (7041373-8552
..h*L 5E
'h 3 E' l.it eince 5-e,
Cause & Curreceive No.
D.n c g
gg j
j55 Event 3?
El Action to
$E d
5, e iteinns tr d'0 E'
Prevent itecurrentc F
{
v O
2a 80-06-01 S
8.00 B
ZZ PIPEXX Completion of pipe hanger / support inspection and modification (IE Bulletin 79-02 and 79-14) 2b 86-06-01 S
398.25 B
ZZ ZZZZZZ Completed reactor building leak rate test.
2c 80-06-17 F
30.07 D
ZZ ZZZZZZ Low boron concentration in "2A" core flood tank.
2d 80-06-19 F
48.42 A
CB VALVEX Leaking flange on 2RC-68 (pressurizer code relief valve).
2e 80-06-21 S
52.02 B
ZZ ZZZZZZ Zero power physics test.
2f 80-06-23 S
6.08 B
ZZ ZZZZZZ Powe[ escalation testing.
2g 80-06-23 S
9.90 B
HA TURBIN Main steam stop valve closure test.
I 2
.I 4
1: l'nied Reason -
kist hoil:
Exliibit C. Insisuctions S
- 5. licilnic.1 A.I'quigunens l.ninie I spl.nni I 61 annat for Prepasation el Data ll blainicin.utie on Itai 94tanual Sciani.
Ents) Sheets fin Ixensec C.Retocling 3 Antoin itic Scr.un.
Evens Repois ll.I'RI file INtlRI.G.
D-Regulatin) Resisi. esoi
-l.Os hei l l; xplJin i Ol t.1 )
- 1. U p<saio liannor A I h co$*' I s 'nnnaH"
l'. A.innnimisa tive 5
G Oper.siional I sno lihplain) thhihin i. Sany S.iurce l'8/77)
II Othes ll.'>pl nil
t (2)
IlNil SillllllOWNS AND H)WI 11 Iti sit erg 3:33s DOCKET NO.
sn-97n UNIT N AhlE.0.conee Unit-2 DATE 7/15/80 fil PUlt ! AfDNill June, 1980 COMPLETED BY J. A. Reavis lELEPil0NE (704)373-8552
~
=.
=
u, :.
c N...
D.,s e 1
5s 5
d 53 I-I'"$"
5'L hl Cause & Curreceive p
3.3 0
EE" I*"'
3.?
El Attion to 3mg itepini e v: O L
oe e
Prevent itecureence 6
2h 80-06-24 S
5.57 B
ZZ ZZZZZZ Power escalation testing 21 80-06-24 S
9.31 B
CB HTEXCH
'. Perform steam generator level control alternate systems t'uning.
2j 80-06-24 F
18.00 A
CB VALVEX Pressurizer code relief valve 2RC-68 flange leak repair.
7p 80-06-25 F
A HA TURBIN Hold due to temperature differential on turbine.
8p 80-06-26 S
B ZZ ZZZZZZ Hold for power escalation testing at 40%.
9p 80-06-28 F
A CH PUMPXX Hold due to 2B FDWP eccentricity high.
10p 80-06-29 S
B ZZ ZZZZZZ Hold for power escalation testing at
-~
75v i
2 1
.I l-l.nceil ite.non -
kleiln e.l.
Eshibis G Insteiscilons S. Sibrilnfeil A l'ipupineni 1.nhne iI splaini
,1 M.nusal l'on Psep;isation ol' Data ll.M.iinien.nn c en In:
"f Maunal Sceain.
Ents) Sheets fin 1.icensee C Itcluelung
.l. Autountic Sciam.
livens Repin 11 I:Ril'ile INillti.C.
D Itegulatos) liestissinni
-l Oshes ll.wplaini 01411
- 1. Opeutin t unnng & I e enw I sanunainen l' Asinunistiaine G Operational i n..r IITplaint Eshibit I - Same Source l'8/77) ll Oihen II:ni' lain g
1 (3) liNil SiltillHlWNS ANI) Pt)WI R Hl'pti( gigjNs DOCKET NO.
50-270 UNIT N AME Oconee Unit ~>
DATE 7/15/80 June, 1980 COMPLE1 Ell ilY J. A. Reavis HLi'OR I MON fil 1ELEPilONE (704)373-8552 "L.
!E 3
=k I.itenste 51 "E
Cause & Curacctive
^
i N".
D HC
},
5?
4 2s5 Everit g
5 ~$
Action to h
[3 d
~@C llelHirl 1 iNO
$b Pf tvent Recutscske O
e-6 11p 80-06-30 S
B ZZ ZZZZZZ Hold for power escalation testing at 90%.
/
I
'2
.I l
l-l ini cil Renon:
Methoil:
llahibit G. Instinctients S. Ss heilnicil A l'ipninnen: 1:ailme t I splaml
.I Manual for Preparation of Data ll Maintenance or l'est
- 4 Manual Sciasu.
lints 3 Sheets fos I.icensee C Itetneling 1 Autom atic Steam.
IIvent Repen t II.17RI l'ile (Nititt.G-D-Regul.itin3 Resisi.nini
-I Oshes Iling laint O t till
- 1. Upciatos liamnec & I sainic I saininaison l' Ailnuni>Haitie 5
G Oper.ational I sios ll'splain t l'8/771 18 thhes Ilimpl.iin t lishibit i.Same Source an
AVERAGE DAILY L' NIT POWER LEVEL DOCKET NO.
50-270 UNIT Oconee Unit 2 DATE 7/15/80 e
COMPLETED BY J. A. Reavis TELEPHONE (704)373-8552 MONTH June. 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DA!LY POWER LEVEL (MWe-Net)
(MWe-Net)
^
g g7 2
18 3
19 4
20 5
21 6
22
'i 7
B 8
24 9
25 og 26 304 10 II 27 Snn 12 23 381 13 29 591 14 30 668 15 31 16 INS'IRUCTIONS On this format, list the ascrage daily unit power levelin MWe Net for each day in the reporting month. Cornpute to the nearest whole megawstt.
\\
(4/77 )
o-DOCKET NO:
50-270 UNIT:
Oconee Unit J DATE:
7/15/80 NARRATIVE
SUMMARY
s MONTH:
. June, 1980 Oconee 2 began June in the completion of a scheduled outage with the reactor building leak rate test in progress.
Following normal startup procedures and tests with some holds due to equipment problems, the unit was placed in service on June 25 at 0937.
After power escalation testing at 40%, 75%, and 90% power levels, the unit ended the month at 94% power increasing to 100%.
.. +;.
e I
c h
i
~____:_-e.-_...:
n.,.
t s,_,,,
MONTHLY REFUELING INFORMATION REOUEST 1.
Facility name:
Oconee Unit 2 2.
Scheduled next refueling shutdown:
June, 1981 3.
Scheduled restart following refueling:
August, 1981 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
Yes If yes, what will these be?
Technical Specification Revision
~
If no, has reload design and cora configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? NA If no, when is review scheduled?
NA 5.
Scheduled date(s) for submitting proposed licensing action and supporting information:
May, 1981
+
k 6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
None r
7.
Number of fuel assemblies (a) in the core:
177 (b) in the spent fuel pool:
278 8.
Present licensed fuel pool capacity:
750 Size of requested or planned increase:
1312 9.
Projected date of last refueling which can be accommodated by present licensed capacity:
DUKE POWER COMPANY Date:
July 15, 1980 Name of
Contact: