s OPERATING DATA REPORT DOCKET NO.
50-287 DATE 7/15/80 COMPLETED BY J. A. Reavis TELEPHONE (7 nail 71-8552 OPERATING STATUS t
Notes Oconee Unit 3
- 1. Unit Name:
Year-to-date and cummulative June, 1980
- 2. Reporting Period:
capacity factors are calcu-
- 3. Licensed Thermal Power QiWt):
2568 lated using a weighted aver-934
- 4. Nameplate Rating (Gross MWe):
age for maximum dependable 886 5.< Design Electrical Rating (Net MWe):
capacity.
gg9
- 6. Maximum Dependable Capacity (Gross MWel:
- 7. Maximum Dependable Capacity (Net MWe): -
860 S. If Changes Occur in Capacity Ratings (1: ems Number 3 Through 7) Since Last Report. Give Reasons:
None C
None
- 9. Power Level To Which Restricted. !f Any INet MWe):
- 10. Reasons For Restrictions. !f Any:
f L
This Month Yr..to.Date Cumulative 4.367.0 48,575.0 720.0
- 11. Hours in Reporting Period
- 12. Number Of Hours Reactor Was Criticaj 344.1 2,877.7 34,771.5
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On.Line 339.1 2,825.3 33,886.9
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH) 850,295 7,172,289 81,553,895 17 Gross Electrical Energy Generated (MWHy 299.570 2,479,640 28,230,904
- 18. Net Electrical Energy Generated (MWH) 284,486 2,363,118 26,859,674 47.1 64.7 69.8 I
- 19. Unit Service Factor 47.1 64.7 69.8
[
- 20. Unit Availability Factor 45.9 62.9 64.0
- 21. Unit Capacity Factor IUsing MDC Net) 44.6 61.1 62.4
- 22. Unit Capacity Factor (Using DER Net) l 52.9 16.7 18.0 l
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months IType. Date.and Duration of Each):
Refueling - December 20, 1980 - 15 weeks July 4, 1980
- 25. If Shut Down At End Of Report Period. Estimated Date of St:rtup:
- 26. Units in Test Status IPrior io Commerci: Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 82110301 % 1:100715 19/77)
PDR ADOCK 05000287 R
e IINII 'illllIDOWNS AND lijWl it It j pi;(.lloNs DOCKET NO.
50-287 UNIT N AhlE Oconee Unit ~3 f
11 ATE 7/15/80 lil.I'OR I Al()N ill June, 1980 COMPLETEI) BY J. A. Renvis TELEl'Il0NE -(7041371-8ss7 q
q
..5
=
- u...
a :. %
l kcresce ir 5 -t, c ;,
Cause & Currective f
N...
D.iic c
gg g
.j :g y I;,en:
-, 7 p
Ag ;g,,,,,
fE d
5g; Itcp no n d'o E'
Pievent fleeperence o
o 2
80-06-15 F
380.90 A
1 CB HTEXCH Tube leak in "A" steam generator.
P l
l i
9 l
2 1
4 l'
I inical Reason:
hiellioil:
Extiibis C - Insionesiims S. Silissinfe.1 A l'ipupnient I:.ntine t I splaint i AI.niual for Pseparation of Data ll.hlaintenain e in 1 e>i "f.hlanual Scram.
Ents) Sheets fin 1.icensec l
C.ltelncling 1 Autinnitie Scr.un.
Event Repini (I I?RI 17ile INtilli G.
D Regulatin> ltesishinni 4-Ollies i1:apl.iin) 01eli I: tipciatin leaening & I h rnw I uniinainen l'. Asinu nisis ai sve G Ope atiinial I isies ll% plain t I:sliiliii I - Sanw Son:ce l'8/171 II Oitics Ilinpl.itoI
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-287 UNIT nennee Unit 3 DATE 7/15/80 COMPLETED BY J. A. Reavis TELEPHONE (704)373-8552 MONTH June, 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-NetI (MWe Neti g
854 g7 2
854 18 3
853 19 4
853 20 5
R41 21 6
R47 22 i
7 Asn 23 g
853 24 9
854 25 10 853 26 11 853 27 12 851 23 13 841 29 14 844 30 15 39 31 16 1
INSTRUCTIONS On this format list the aserage daily unit power leselin MWe Net for each day in the reputting month. Compute to the nearest whole rnegawatt.
19177)
-y m
DOCKET NO:
sn_9R7 UNIT:
nr.nn o, uni Q DATE:
7/15/80 1
l i
NARRATIVE
SUMMARY
MONTH:
.Ju_ne, 1980 Oconee 3 began June at near rated power and continued until June 15 when the unit was shutdown due to a tube leak in the "A" steam generator. The unit was out for repair the remainder of the month.
.. +
\\
f I
l l
I I
l L
m-
..._m t
MONTHLY REFUELING INFORMATf 0N REQUEST 1.
Facility name:
Oconee Unit 3 2.
Scheduled next refueling shutdown:
December, 1980 3.
Scheduled restart following refueling:
February, 1981 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
Yes If yes, what will these be?
Technical Specification Revision
/
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
NA If no, when is review scheduJed?
NA 5.
Scheduled date(s) for submitting proposed licensing action and supporting information:
September 1. 1980 m
6.
Important licensing considerations (new or different design or u'pplier,
unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
None e
7.
Number of fuel assemblies (a) in the core: 177 (b) in the spent fuel pool:
459 8.
Present licensed fuel pool capacity:
474 Size of requested or planned increase:
None 9.
Projected date of last refueling which can be accommodated by present licensed capacity:
DUKE POL'ER COMPANY Date:
July 15,1980 Name of
Contact:
J. A. Reavis
OCONEE NUCLEAR STATION Operating Status Report 1.
Personnel Exposure For the month of May, 5 individual (s) exceeded 10 percent of their allowable annual radiation dose limit with the highest dose being 1.890 rem, which represents approximately 15.8% of that person's allowable annual limit.
2.
The total station liquid release for May has been compared with the Technical Specifications annual value of 15 curies; the total release for May was less than 10 percent of this limit.
The total station gaseous release for May has been compared with the derived Technical Specifications annual value of 51,000 curies; the total release for May was less than 10 percent of this limit.