ML20065T827
| ML20065T827 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 11/16/1981 |
| From: | Alden W PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | |
| Shared Package | |
| ML20065T819 | List: |
| References | |
| NUDOCS 8211030114 | |
| Download: ML20065T827 (11) | |
Text
-
__m
- 6... 6.....
.t.
sOCs st s3. 50 - 277 SATE 31f88834 16, 1981
.....==_=
CDePLBTLD ST PEIL&DELP51& ELECTt!C COMP &5t s.E.ALD38 sesiusse-le-csaast 30CL5&B SECT 10s
$35BB4T100 D1 TIS 108-50 CLEAR TELarmoss (215) 841-5022 Orsa&T1ss afalgs
)
- 1. SUIT Bast PS&Cu SOTTom UEIT 2 l 30 TBS: eSIT 2 EIFRE189CBD l
~. - -
g g
- 2. assoafles pasioD OCToe gs, 1981 Oss Ostass Ass 1
g g
J. LICassas Tessn&L #0ssa tasT) 3293 Ts0 possa asDeCT10ss.
l 1
4
- 4. sassetafs n&T1ss (es0Ss aus):
1152 3
g g
- 5. pastes sisCtalCAL a& Ties (ast assis te45 g
g t
I
,s. s&staos arrasDasLa C&r&CITT 1630ss seap: 1898 3
g l
1
- 7. AAIlace DEPd8D&dLE C&PACITT (OST awaj a 1951 l
l
- s. IF CsasesS uCCua is C&#ACITT &&T1ses (itsas sonnes 3 TsaDoes 73 sisCs LAST aEpoaf, G1T as&Sous
- v. rowns Levsk Tu vu1Cs assf alCTED, IF Asf (sst awe Id. BC&$085 F04 SEhTRICT10sS, IF &OT:
T515 RouTH 18-TO-DATE CUnULATIVE II. a00sd Is BE6ChTisG P8k!W 745 7,296 64,224
- 14. sessaa OF duuLS SEACTOR u&S CRITICAL 128.3 5,726.9 48,279.4 la. SMACTJR SESLATE SMUTDOWS 50 Uhs 0.0 0.0 0.0
- 14. 80u83 GENES &Tuk Os-1158 11b.D 5,491.1 47,003.9
..+
- 12. U21T BBStatt hMUTDows 5008S 0.0 0.0 0.0
- 13. EBOSS Tatas&L 151.3G1 EtutB&TBD (SWE) 2,134,025 16,443,357 tb,86r,429
- 17. skOSS ELECTAICAL EastGI GE5ESATED (swup 699,920 5,467,420 45,080,520 Id. SET ELECTRICAL SettGT GES BB&TED (885) 672,89e 5.260,177 43,219,841
- 11. Ud1T Stat 1CE F&C% s 96.5 75.3 73.2 JJ. 431T AT&1Lat1LITT FACTOR 96.5 75.3 73.2 J t. 3817 CAPACITT FACTot (USIBS EDC BET) 85.9 68.6 64.0
- 22. WEIT C4FACITT FAC108 (USISG DER 357) 84.8 67.7 63.2
- 43. Os1T FORCED OUT&GE BATE 3.5 22.6 0.3 24 SdUTD0 DSS SGBDULED Of 88 SSIT & sonfus (TTPE, DATE, 400 Doe &T10s DF B&CM):
- 45. IF SNUTDOWS AT SBD OF SsPORT F5810D, BST1s&TED DATE OF STASTUP: 5/26/s2 Ja. 55173 IB TEST STATOS (PS2W TO CossRSC1&L 07EE AT15):
F0BBCAST AC51EfsD 15171&L CRITICALITT 151TIAL ELECTRICITT CoasESCIAL OFSt& TION 8211030114 833337 m
PDR ADOCK 05000277 R
DOCKET NO. 50 - 277 UNIT PEACH BOTTO5 UNIT 2 DATE NOVEMDER 16, 1981 COMPANY PHILADELPHIA' ELECTRIC COMPANY W.H.ALDEN ENGINEER-IN-CHARGE NUCLEAk SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 50dTH OCT0 DER 1981 DAY LVERAGE DAILY POWER LEVEL DAY AVERAGE DEILY POWER LEVEL (MW E-NET)
(H WE-N ET) 1 997 17 774 2
995 18 795 3
991 19 910
..+
i 4
991 20 1015 5
986 21 1034 6
982 22 1032 7
990 23 1020 6
987 24 692 9
978 25 932 10 611 26 1016 11 747 27 1043 12 8d7 28 1037 13 1039 29 1038 14 610 30 1039 15 83 31 1039
\\
16 748
\\
e we e 4 e sm
t' em
- 6 UNIT SHUTDOWNS AND POWER REDUCTIONS DDCMET NO. SD - 2TT gg UNIT NAME PE ACH 80TTON UNIT 2 DATE NOVEMBER 16, 1981 Q
REPORT MONTH DCTOBER, 1981 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY
()
W.M.ALDEN i
ENGINEER-IN-CHARGE NUCLEAR SECTION
' c)
GENERATION DIVISIDN-NUCLEAR TE L E P HONE 12153 841-5022 t
l l
l l
l METHOD OF i LICENSEE ISVSTEMICOMPONENTI CAUSE AND CORRECTIVE 1
I TY PE IDUR AT I ON l RE A SDN I SHUTT I NG DOWN I EVENT l CODE I CODE
-l ACTIDN TO
{}
N0.1 DATE I (131 (HOUR $ll (2) l REACTOR (3) l REPORT e 1 (4) l (5) l PREVENT RECURRENCE j
j I
I I
I I
I I
I I
()
2D l 811009 l 51 00.0 l
M l 4
l NA l RC l ZZZZZZ l LOAD REDUCTION TAKEN FOR CDNTROL ROD t
l l
l l
l l
l l
l ADJUSTMENT AND TO REMOVE THE STM FEEDWATER 1
l l
l l
l l
l l
l HEATERS FROM SERVICE.
()
l I
I I
I I
l l
l 30 1 811014 l Fl 26.2 l
A l 3
l NA l
IB l INSTRU l DURING AN INVESTIGATION OF THE ECCS INSTRU-
?
I l
I l
l l
1 l
l MENT ATIDN, POWER SUPPLY FUSES WERE REMOVED
()
l l
l l
1 l
l l
l DN ONE OF THE PDWER SUPPLY LINES AND THE I
l I
l l
I I
I l REDUNDANT POWER SUPPLY FAILCD CAUSING I
l I
l l
l I
l l RECIRCULATIDN PUMP AND TURBINE TRIPS
()
i l
1 1
l l
l l
l RESULTING IN A SCRAM.
I I
i i
I I
I l
l 31 1 311025 1 51 00.0 l
H l 4
l NA l RC l ZZZZZZ l LOAD REDUCTION TAREN FDR CONTROL RDO
()
l l
l l
l l
l l
l. ADJUSTMENT.
I I
I i
1 l
t i
I I
I I
26.2 i
I i
i i
I C) 9 0
7 gg (1) 62)
(3)
(4I B
o F - FORCEO REASDN METHOO6 EXHIBIT G - IM5tRUCTIDMS
' q7 5 - SCHEDULE 0 A - EQUIPMENT FAILURC (ENPLAINI 1 - MAN AL FDR PRE PAR ATION OF DATA 8 - MAINTENANCE OR TEST 2 - MANUAL SCRAM.
ENTRY SHEETS FDR LICENSEE C - REFUELING 3 - AUTDMATIC SCRAM.
EVENT REPORT (LERI C)
D - REGULATDRV RESTRICTION 4 - OTHER (EXPLAINI FILE INUREG-0161)
E - DPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE 153 gg G - DPERATIDNAL ERROR (EXPLAINI
- g..
H - OTHER(EXPL AINI ENHIBIT I - SAME SOURCE
~
i PEACH BOTTOM ATOMIC POWER STATION NARRATIVE
SUMMARY
OF OPERATING EXPERIENCES October, 1981 UNIT 2 OPERATIONS Power was reduced to approximately 50% on October 9 to accommodate a control rod pattern adjustment and to remove the fifth feedwater heaters from service to improve end of life power levels.
The unit was returned to full power late on October 12.
l The reactor scrammed on October 14 during on line maintenance of an ECCS power supply.
All four power supplies were replaced to correct a 4 volt ripple in the 24 volt DC output which was causing setpoint drift in ECCS instrumentation.
The unit was returned to service on October 15.
The unit reached full power on October 19 following delays in the rise to power due to failure of the 2A condensate pump motor.
A-Loadwasreducedbyapproximately50MWeonOctoberj20 for approximately eleven hours due to high bearing vibration.
The problem was corrected by adjusting the generator hydrogen cooling water.
Load was reduced to 650 MWe on October 23, 1981 to accommodate a control rod pattern adjustment.
The unit reached full load on October 26, 1981.
During the reporting period, repairs were completed to i
the vertical drive and one cylinder of the E-4 diesel generator.
Leaks on a fuel oil injector, cooling water fitting, and emergency service water outlet bellows expansion joint for the E-3 diesel engine heat exchangers were also corrected.
The HPCI system gland seal condenser gasket was replaced during this month.
Additionally, during the period, 'a failed reactor protective system relay was replaced to correct a false "A" channel half-scram.
N A
m-e
^
UNIT 3 OPERATIONS The reactor was returned to service on October 2 following completion of the Unit 3 fourth refueling outage.
The unit was not returned to service until October 23'.
Between l
October 2 and October 23, return to service was delayed due to repairs to two turbine-generator bearings caused by insufficient lubricating oil flow, steam jet air ejector start-up difficulties, and a false condenser low vacuum scram.
Load was reduced on October 24 to accommodate overspeed trip testing of the main turbine.
The unit reached a limit of 834 power on October 30 pending correction of a high vibration problem with the 3
'B' condensate pump motor.
4 e
l
+
I)ocket No. 90-;.'T/
~
Attachment to
- Monthly Operating Esport for October, 1981 REFUELING INFOIMTION 1.
Name of facility:
Peach Botton Unit 2 2.
Scheduled date for next refueling shutdowns February 20,1982 3
Scheduled date for restart following refueling:
May 26,1982
- h. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
Yes.
If answer is yes, what, in general, will these be?
Technical Specifications to accommodate reload fuel. Modifications to reactor core operating limits are expected.
- 5. Scheduled date(s) for submitting. proposed licensing action and supporting information:
February 24,1982 6.
Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
None expected.
7 Thenumberoffuelassemblies(a)inthecoreand(b)inthe spent fuel storage pools (a) Fuel Pool - 910 Fuel Assemblies Core - 764 Fuel Assemblies (b) 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 2816 fuel assemblies.
9 The projected date of the last refueling tha,t can be discharged to the spent fuel pool assuming the present licensed capacity.
September,1990
\\
w.,....a.,...
~
g,.
DOCA st 30. 50 - 278 DATB 81188888 16, 1981 CetPLETED sf P51L&DELPS14 ELECTRIC Conrauf W.E. A LD BS BEG 185BS-15-CW4BGE SOCLB&B SECT 108 GB8884T105 DITIS105-80CLB&O TSLSPN088 (215) 841-5022 OPSB&TIBG ST&TOS
- 1. 3817 BASES PS&CE DOTT0s 5s17 3 3 30Ts&s self 3 asTessas a
g g
- 2. 38Pottip0 PS1098 OCTOs m, 1981 g
TO 0P384T108 l
g g
J. LICBBSSD Tasse&L POW 88(IhdT):
3293 3
08 OCTossa 23, 1981.
1 g
g
- 4. BatEPLATE a4 Tips (eacss ass) 3
'1152 g
IT EIPSO185CBD l
g g
S. DASIG8 ELECTRICAL SAT 150 (SBT SOE):
1865 g
Teo S&JOR OUT&GES l
g g
- e. 3411808 DSPBSD&BLE C&PACITT (GROSS EWB): 1998 l
(BareBLIBG, 35 PLACE I
8 1
- 7. s& sines DrPasD&sLa CAPACITr (est seap:
1935 l
Teasles BP& BIOS).
-==....... I IF Cdast.ES OCCat is CAPACETT B&T1sG5 (ITsas 308888 3 Tut 00GE 13 515CE LAST REPORT, Gif E SEAS 0Wst 3.
- 9. Podta LBTEL TO Wu1CM REST 81CTED, IF 458 (BBT 555):
1J. SEASOES POS RESTB1CT1055, IF 451:
TM15 20MTM It-To-DATE CUBULATIVE 745 7,296 60,120 II. Muut515 REP 0&TISG PERIDO 1J. uUSBLA 0F MOUmb AEACTom W AS Cd1TICAL 313.h 1,561.2 44,023.4 1J. uEACTut SEhtatt SMOTDowd N0885 0.0 0.0 0.0 14 W0085 GLata470s O5-LIBE tv6.2 1,738.0 42,762.0
.. +
('
1%. 981T DESERTE SdWTDoug Much3 0.0 0.0 0.0 1
Io. G ;C35 TaLORAL ESERGT GEBERATED (BWW) 372,3e5 5,304,501 122,147,530
- 47. Gkdes ELECTRICAL EstaG1 G58 TEATED (stu) 113,150 1,157,050 39,059,090
=
Is. BET ELECT 31 CAL EBE3nt GBSES&TBD (EWW) 1WJ,211 1,650,022 38,228,665 26.3 23.8 71.1 Ib Welf STATICE PACTOR 26.3 23.4 71.1
- 40. Us1T &T&1Lat1LITI P&CTOR
.'1.
Ud1T Car &CITT FACTOR (551sG EDC BET) 13.3 21.9 61.4 i2. Usif CAPAC17! FACTok (GSIBG DER BET)
_59 ]
12.6 21.2 68.6 20.4 s.2 JA. Ud1T FORCED OUT&GE b4TE de. SauTDouts SulEDei3D Of tB BSIT 6 BohTES (TTPS, DATE, AuD DU817108 0F BACs):
J ',. IF SacTDOWs &T BSD OF BBPORT P8810D, thfis&TED D&TE OF StarTGrs
- 46. 0s17515 TEST STATOS (PRIOS TO C0asstC1&L OPSB& TICS):
FORBC&ST ACE 13 FED 25171&L C8ITICALITI 181TIAL ELSCTRICITT COBEBECIAL OPES &TIOS I
\\
~-.w P
e re_m*E_. _,,,
19.ws943g 37 396 g'M g- 'M 4g T( f"P'?
40 M'
s"'
Av anut
.s.a l. 6
- a. 41 2v da LL._L a
DOCKET N00 50 - 278 UNIT PEACH BOTTOM UNIT 3 DATE NOVEMBER 16, 1981 COMPANY PHILADELPHIA' ELECTRIC COMPANY W.H.ALDEN ENGINEER-IN-CHARGE FUCLEAR SECTION GENERATION DIVISION-NUCLEAR TELEPilONE (215) 841-5022 MON T!!
OCTODER 1981 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWEH LEVEL (HW E-NET)
(HWE-NET) 1 0
17 0
2 0
18 0
3 0
19 0
-+\\-
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 1
8 0
24 275 9
0 25 179 10 0
26 310 11 0
27 510 12 0
28 687 13 0
29 791 14 0
30 878 15 0
31 891 16 0
e
+
.. -..O 4.-.
L'
._F b
t i
J 4
e.
5 e
- O s
O m
5 E" *
=
e.
J.=
OJ
'O s*Es M
4 mm 4
s e u
J>
w J
Mme 2
a g
g
>zmuO m
4 d
6 Em e4D e
f 4
S 4"
JMJ3&W g
w Od on O
duw 3
w J
wg e4 E
EwEngO 04 Ow EEMDw M
w FK mm JwemWE w
Fge w
u wu We
>3 WOZeru I
O>r u
ue*4 mew
{O 09 44 s
8Ow WOu a
H d
NO
@K du w O we 24 ew ewe @EE E
U m
=
d u
m m
ww me Z e Q
Q 3mdam e
m o
w E
e3 e
U
- >um 60 E4 E.
O J
4Em qm w
6
- Kwe w
Za e
a w30 w MFDJO E
3 m
W ZODN e
a e
ROsw&
mmN em e uw G3e 4 ewMMw 2
m um 7
e e
>bm K
md>
e ONnFnd m
O 4
m u m 3He 3>
EmJ mM3www J e WMkw W
E mwF0 w
Der O 4&
=>Seng3 4>
0gm 6
38 mom ad JE Fma Ewmu Eu mm
=
ww
=
e O.
Wi J
wa M4 m
w Jw O
O 3
ew9wp u Em 4
Gew e
m e
=
m Ows>e
> u wre F GM EMMSOs0 Op
&Zww -
N te O
JW44 u 3 Swm Om OF OF 20 kwes ZgK e
erwsm a
w hGN E
wmJ dmMO
>E w&
ma e
=
0 O
w J
OmdWM W
5 w
Em EWm
&wOuq Em e&>>J e
EGQgH g
g Kdd 4J
&40 J>
KJeg 4g m
agm m
Ojw O
Z8 *2JwN 003 wm We mm JJ*W3wu um EWpw&
E 4
m est 2
&G3m29w uku Gee uO wem DJk3Orm NOrb M
w FwE MW
> > meruu 50 wwww w
- w w >
g 975 mmw P4 3wu w& Ow O E
> e a
zo DOM W
w 3 WEEDOZJ
>w em>
F 000 250 043 Xpe et 2 e e t O O ME we w >>>
www
- EWEe Z se w
wum
>qm u u een U
Me t
we w >
w e4D Fe eww wee empreww rw w
a w
J 3 w owF was 332 weru3XT wp Ea u
F J
w te a ue O saw era a3=mO3m GO er e,wm O 3 u a Eue ges O
E 0
a u
uum Ewwa M
e 2
3 W
=
Mme ROM N
E m
a N
M wm DO=
J O
w w
=
JJe Eu w
u a
e w
egEm E
3 w
3 F
w 33Ow O
m a
=
M 22>Z 0443>
u OEEeO
==-------
1 E
M 4 90 14
- =
>De u
O 4
e w
w MO-a E
Z w
w EmNm4 e
F Wu O
A r
w n
e O
a 9
a 3
m) w e O
s m
e ei m>>
E wa E
EEE o
wwo 2
a e
u>&
w O
mww e
e e
e e
e m
E p -
J K
R 2
2 2
2 k
b, w -
F e E O
5 F
=
R m
=
2 e
w e e
X s n J
u J
O =
Em m
E M
GJ R
\\
E D
dd 3
K 20 m
M M
M 4
w a
w
> **
=>
M u
O O
>>U we m eh a
g we4 sk WF O 3
O E3w 3
mm e
Em JW M g M' w
- e E
s way r
M w
M mQ e
Wew a
g K
mm e>Je O=
mN u
4 O
e u
>e wed m
>POg NF&
=
r3
(=
N E4XOe*De w
=
W 2 m > 4J e m d E
EwJepm>w
&WWJeF4W Em mE23emaw 4
m 9
4 O
e O
4 DatowEwX i
Om EpewweDa*
4
> 0 4
4 e
O O
F O
O OwEagOeOO e
met N
O N
O O
el 9 $ $1 68 9 Dw l n
4 w
O genuOwagg
=
wa
&W d
E M
I_C-O w
f 0
M 4
4 h
4 w
O O
O N
N D3 O
O O
O O
wO 4
m m
m m
m o
uw O
m m
m M
m m
gK CQ e
e e
e e
sm IB I
O 4
P e
e o
m g &M 28
\\
t t
t 4
6 4
S S
S S
(
)
)
)
)
)
)
)
)
s e.
e.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 278 UNIT NAME PEACH BOTTOM UNIT 3 DATE NOVEMBER 16, 1981 REPORT MONTH OCTOBER, 1981 COMPLETED BY PHIL ADELPHI A ELECTRIC COMPANY W.M.ALDEN ENGINE ER-IN-CHARGE NUCLEAR SECTION GENERATION DIV15104-88UCLE AR TELEPHONE (2153 841-5022 I'
i 1
I I
l METHOD OF l LICENSEE 15YSTEMICOMPONEHTl CAUSE AND CORRECTIVE 1
ITYPEl0URATION!REASONISHUTTING 00WNI EVENT l CODE I CODE I ACTION TO
!NO.I DATE I (131 (HOUR 511 125 l RFACTOR 433 l REPORT 8 l 141 1 (5) l PREVENT RECURRENCE 1
I I
I I
I I
i 1
- 11 1 411026 l FI 00.0 l
8 1 4
1 NA I HA I GENERA I LOAD REDUCE 0 TO RESTORE RECTIFIER 8444 1
I l
l l
l l
l l ASSOCI ATED WITH THE GENERATOR.
I I
I--
1 I
I I
I I
I I
I 548.8 I
I I
I I
I i
(1)
(2) 131 84)
F - F01CEO REASON METHOD EXHIBIT G - INSTRUCTIONS 5 - SCHEDULED A - EQUIPMENT FAILURE (EXPLAINI 1 - MANUAL FOR PREPARATION OF DATA 6 - MAINTENANCE OR TEST 2 - MANUAL SCRAM.
ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.
EVENT REPORT (LER)
D - REGULATORY RESTRICTION 4 - OTHER IEXPLAIN)
FILE INUREG-01611 E - OPERATOR TRAINING + LICENSE EXAMINATION F - 40NINISTRATIVE E5I G - OPERATIONAL ERROR (EXPLAIN)
Hf0THERIEXPLAINI EXHIBIl I - S AME SOURCE 4
i i
i m.
- Monthly Operating Report for October,1981 REFUELING INFORMATION 1.
Name of facility Peach Bottom Unit 3 2.
Scheduled date for next refueling shutdowns' Refueling starts February 5, 1983 3
Scheduled date for restart following refueling:
March 18,1983
- k. Will refuellag or resumption of operation thereafter require a technical specification change or other license amendment?
Yes.
If answer is yes, what, in general, will these be?
Technical specification changes to accommodate reload fuel.
Modifications to reactor oore operating limits are expected.
Scheduled date(s) for submitting proposed licensing action and supporting informations j,
December 17,1982 j
6.
Important licensing considerations associated with refueling, e.g.,
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating prooedures None expected.
7.
The number of fuel assemblies (a) in the core ani (b) in the spent fuel storage pool (a) Core - 76h Fuel Ass'emblies (b) Fuel Pool - 928 Twinted Fuel Assemblies 8.
The present licensed spent fuel pool storage capacity and the size of any increase in lio,ensed storage capacity that has been requested or is plannad, in numb'er of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 2816 fuel assemblies.
,9 The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capsoity:
September,1991
~
\\