ML20065T545

From kanterella
Jump to navigation Jump to search
Corrected Monthly Operating Rept for Jul 1982
ML20065T545
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 08/13/1982
From: Reavis J
DUKE POWER CO.
To:
Shared Package
ML20065T485 List:
References
NUDOCS 8211020568
Download: ML20065T545 (1)


Text

s OPERATING DATA REPORT DOCKET NO. 50-269 F;.

  • Corrected. Copy DATE 8-13-82 i- COh!PLETED BY J. A. Reavis TELEPHONE 706 171-R552 OPERATING STATUS 1'

s

\ Notes

1. Unit Name:

oconee #1 -

Juiv 1, 1982 - Julv 31, 19R2 Year-to-date and cum:aulative

2. Reporting Period:

capacity factors are calcu-

3. Licensed Thermal Power OtWt): 9568
4. Nameplate Rating (Gross StWei: 934 -

5.. Design Electrical Rating (Net 5tWe): 886 dependable capacity.

6. Staximum Dependable Capacity (Gross S!We): 800
7. Staximum Dependable Capacity (Net 5twe): 860 3
3. If Changes Occur in Capacity Ratings (!tems Number 3 Throu'gh 7) Since Last Report. Give Reasons:

None

9. Power Level To Which Restricted. If Any (Net 5tWe): None
10. Reasons For Restrictions. If Any: -

., his Stonth Yr.-to.Date Cumulative I1. Hours In Reporting Period 744.0 5 087.0 79 272.0

12. Number Of Hours Reactor Was Critical 739.6 3 163.9 54 219.3
13. Reactor Reserve Shutdown Hours
14. Hours Generator On.Line 727.2 2 935.3 51 178.5
15. Unit Reserve Shutdown Hours - - -

s.

16. Gross Thermal Energy Generated (31WH) 1 777 122 7 008'223 120 465 995 .

, ' 17 Gross Electrical Energy Generated (SIWH) 611 070 _

2 430 310  ; 41 906 660

18. Net Electrical Energy Generated (5tWH) 582 48R 2 280 6n4 39 624 780 19."'Unit Service Factor 97 7 57.7 64.6
20. Unit Availability Factor
  • 97.7 57.7 64.6
21. Unit Capacity Factor tUsing blDC NetI 91.0 52.1 57.9
22. Unit Capacity Factor (thing DER Net) 88.4 50.6- 56.4
23. Unit Forced Outage Rate 2.3 42.3 20.1

, 24. Shutdowns Scheduled Over Next 6 Slonths (Type. Date.and Duration of Eacht:

None

25. If Shur Down At End Of Report Permd. Estimated Date of ',:artup:
26. Units in Test Status (Prior to Commercial Operation): Forecast ' Achieved it INITIA L CRITICA LIT

- INITIA L ELECTRICITY

' i C05 tat ERCIA L OPER A TION ,

8211020568 820915 DR ADOCK 05000269

- . - -- . . . - . -.