OPERATING DATA REPORT DOCKET NO. 50-269 DATE l-15-82 COMPLETED BY J. A. Reavis TELEPHONE 7rm_t7 sg552 OPERATING STATUS

  • Oconee Unit 1 Notes

!. Unit Name: Year-to-date and cummulative December, 1981

2. Reporting Period: capacity factors are calcu-
3. Licensed Thermal Power (MWt): 2568 lated using a weighted
4. Nameplate Rating (Gross MWel:

934 886 dependable capacity.

5.. Design Electrical Rating (Net MWe):

6. Maximum Dependable Capacity (Gross MWe): R99 *
7. Maximum Dependable Cspacity (Net MWe): 860 S. If Changes Occur in Capacity Ratings (!tems Number 3 Through 7) Since Last Report. Give Ressons:

None

9. Power Lev'el To Which Restricted. If Any (Net MWe): None
10. Reasons For Restrictions. If Any:

.?-

t This Month Yr..to-Date Cumulative 744.0 8,760.0 74,185.0

11. Hours In Repodg Period 51,055.4 80.1 3,769.3
12. Number Of Hours Reactor Was Critical -

I 13. Reactor Reserve Shutdown Hours ~

48,243.2 0.4 3,659.1

14. Hours Generator On.Line - -
15. Unit Reserve Shutdown Hours 113,457,772 -

12,473 -

9,003,385 .

16. Gross Thermal Energy Genersted (MWH) 39,476,350 2,0_, 3,174,520
17. Gross Electrical Energy Generated (MWH)

- 13.157 2,996,167 37,344,176

18. Net Electrical Energy Genersted (MWH) 0.1 41.8 65.0
19. Unit Service Factor 65.1 0.1 41.8
20. Unit Availability Factor 58.3 0.0 39.8
21. Unit Capacity Fsetor IUsing MDC Nett '56.8 0.0 38.6
22. Unit Capacity Factor IUsing DER Net) 0.0 30.5 18.2
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 MonthsIType.Date.snd Duration of Eschi:

j i

l l

25. If Shut Down At End Of Report Period. Estimated Date of ,t:rtup:

January 1, 1982

26. Units in Test Status (Prior to Commercial Operations: Forecast N Achieved i

INITIAL CRITICALITY INITIAL ELECTRICITY I COMMERCIAL OPER ATION i 8211020536 820115 gof- ;

t PDR ADOCK 05000 i -- - .R -

, y- .

- g'  !

tlNil SillfillOWNS ANI) Ps)Wl.it Itl.DUCll(ins

DOCKET NO. 50-269 -

UNIT N AhlE Oconee Unit 1 i DATE l-15-82 lit:l'Olt i klON ill December, 1981 COMPl.ETED HY .I. A. Reavis TELEl'Il0NE 704-373-8552 k-

"L -

=. . 2 u. = - 3

, ~e  : ,E% l.itensee g 8, g1. Cause & Cnsscetive N" . DHe i 5E 4 555 livent  ?? e-T Action in -

F

[i _ $ ltepose u iE U E' Pacvens Iteensacoce 5

< g =f u ,

Q Sb 81-12-01 S 743.58 C --

RC FUELXX Completion of refueling and zero power physics testing. Generator on line at 2335 on 12/31.

s

= _ _ . _ _ . . . _ _ . _ _

I 2

.t l I I .u. cil iteason - kleiln.il:

S S. I.olnic.I Exhibit G Insiencilim A l'aimpmeni 16... .e 11 silam) I hlannat l'n Picpasation ol' Data ll ht.iinten.inie in l'es *

2. Alannal Sesam.

C Iterneling I:ntr> Slicets l'in 1.icensee

1. Aniom.itie Soc.im. livent f(epini ll liiti File INtiltl.G-11 llegulatin) Itesisi,non .i Osties ll.xpl.nni I t >pesalos 18.unm
  • A I sunw I otmni.aison 01611 l' Ailmenists.slive 5

G t)pesaiional I .o 11:y.lami l'8/ l i l 11 i hiies Iliaplan.1 lisliileis ! Sanie Sonsce

AVER.WE D ALLY L. NIT P0hER LEVEL a

DCCKET NO.

50-269

,,7 Oconee Unit 1 1-15-8'9 DATE

~

COMPLETED BY J. A. Reavis TELEPHONE (704)373-8552, December, 1981 SiONDi DAY AVERAGE DAILY POWER LEVEL DAY AVERACE DAILY POWER LEVEL g 3gy,.yeg,

~

(5the-Nett _

~

1 17 2 13 3 gg 4 20 5 21 6

3

[ -c t

7 y .

3 24 9

3 10 26 11

{ 12

3 n -

14 30 15 33 16 INSTRt1CT10NS On this fer:-st. list :he aer.ge haly ;: :t p;wer ' eves :a *,1We. Net fer esch s> . : ne < v - nz .n..r.t.3. C . .:..te .,

'n: r.estest Aheie .-.:;2wst:. y

,o - g

- - - .. .,---, ,. . . +

o HONTHLY REFUELING INFORMATION REQUEST

1. Facility name: Oconee Unit I .

Scheduled next refueling shutdcun: February, 1983 .

2 .-

January 1, 1982

3. Schedul,ed restart following refueling: ,
4. Will refueling or resumption of operation thereafter require a technical -

specification change or other license amendment? Yes .

If yes, what will these be? Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? NA .

If no, when is review scheduled? NA .

5. Scheduled date(s) for submitting proposed licensing action and sypporting information: Submitted May 29, 1981 ] . --

1

6. I=portant licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures). None
7. Number of fuel assemblies (a) in the core: 177 .

(b) in the spent fuel pool: 532* .

8. Present licensed fuel pool capacity: 1312* .

Size of requested or planned increase: None .

f 9. Projected date of last refueling which can be accommodated by present j licensed capacity: .

1

\

! DUKE POWER COMPANY Date: January 15, 1982 ,

l r

! Name of

Contact:

J. A. Reavis .

  • Represents total for the combined units.

l l

o s ..

DOCKET NO: 50-269 UNIT: Oconee Unit 1 DATE: January 15, 1982 NARRATIVE

SUMMARY

MONTH: December, 1981 Refueling and maintenance of Oconee Unit I was completed in December and startup and testing began. Low power testing was completed and the unit returned to service at 2335 on December 31, 1981. ,

I b