OPERATING DATA REPORT DOCKET NO. 850 "I99 DATE DECEMBER COMPLETED BY ( E. ZUFELT91 TELEPHONE OPERATING STATUS FITZPATRICK Notes
- 1. Unit Name:
811101-811130
- 2. Reporting Period:
- 3. Licensed Thermal Power (MWI):
24 %
883
- 4. Nameplate Rating (Gross MWe):
021
- 5. Design Electrical Rating (Net MWe):
830 1
- 6. Maximum Dependable Capacity (Gross MWe):
810
(
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Irems Number 3 Through 7)Since Last Report, Gise Reasons:
- 9. Power Level To Which Restricted,If Any (Net MWe):
- 10. Reasons For Restrictions,if Any:
i This Month Yr..to-Date Cumulatise 720 8016 55633
- 11. Ilours in Reporting Period 0
6637.2 39551.2
- 12. Number OfIlours Reactor Was Critical 0
0 0
- 13. Reactor Reserve Shutdown Hours 6540.O 98443.6 0
- 14. Ilours Generator On-Line 0
0 0
- 15. Unit Reserve Shutdown Hours 0
14217720 78401314
- 16. Gross Thermal Energy Generated (MWH) 0 4931100 26760610
- 17. Gross Electrical Energy Generated (MWH) 0 4779650 25904730
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor 0%
81.6%
69 1%
0%
81.6%
69.1%
- 20. Unit Availability Factor 0%
73.6%
62.2%
- 21. Unit Capacity Factor (Using MDC Net) 0%
72.6%
56.7%
- 22. Unit Capacity Factor (Using DER Net) 0%
10.1%
16.9%
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each):
NONE
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
FEBRUARY 1982
\\,
Achieved
- 26. Units In Test Status (Prior to Commercial Operation)-
Forecast INITIA L CRITICALITY INITIA L ELECTRICITY COMMERCIAL OPERATION C211020345 811230 PDR ADDCK 05000333 R
AVER AGE DAILY UNIT POWER LEVEL DOCKET NO.
50-333 JAFNPP UNIT.
DATE DECEMBER 1981 E.ZUFELT COMPLETED BY (315)342-3840 TELEPilONE N
fBER, 1981 MONTH DAY AVER AGE DAILY POWER LEVEL DAY AVER ACE DAILY POWER LEVEL (MWe-Net)
(MWe. Net)
O I
17 n
0 2
0 gg 0
0 39 3
0 0
4 20 0
0 21 5
0 6
0 22 0
0 7
23 0
0 8
24 0
9 0
25 0
10 26 0
0 11 27 0
12 28 0
0 I3 29 0
0 14 3g 0
IS 16
SUMMARY
Fourth refueling and maintenance outage continued through'this reporting period.
DOCKET NO. 50-333 UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT N AME JAPNPP DATE DECEMBER 19n1 COMPLETED BY h.LUFELT REPORT MONTil NOVEMRPR 1981 TELEPilONEC 315 ) 342-1840
.! ?
3
.Ek Licensee E r, E%
Cause & Corrective No.
Date g
3g i!j jg&
Event a7 3
Action to 3 5 =5 Report
- E0 Prevent Recurrence c3 5 5
O 12 811031 S
720 C
1 N/A N/A N/A Refueling outage (cumulative hours to date 742 7) i i
2 3
4 F: Forced Reason:
Method:
Exhibit G. Instructions S: Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data l
B Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee 1
C. Refueling 3 Automatic Scram.
Event ReporI(LER) FileINUREG.
D Regulatory Restriction 4 Other (Explain) 01611 E-Operator Training & License Examination F. Administrative 5
G Operational Error (Explain)
Exhibii 1 Same Source 4
Il Other (Explain)
POWER AUTHORITY OF'THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT NARRATIVE SUMMARRY OF OPERATIONAL EXPERIENCES NOVEMBER 1981 4
[^
The refueling and maintenance outage.which began October 2
31, 1981, continued throughout this reporting period.. Major
~
areas include'~ TORUS modification, LLRT testing, turbine s
generator maintenance, ISI testing, replacement of feedwater heaters and fire protection modifications.
'1 1
i w
e
~ ~
- m f,
f 1
- I
g N
(
I t
i.e
- -. + + -
,.,y,
.~
,_-r-.x
_.,-..m 9y
-_y_.
r-_
=.r,.
-m---
POWER AUTHORITY OF THE STATE OF NEW YORK-JAMES A. FIT 7. PATRICK NUCLEAR POWER PLANT A
SAFETY RELATED ELECTRICAL & MECHANICAL MAINTENANCE
SUMMARY
NOVEMBER 1981 DATE SYSTEM HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T ME HOURS 11/15 39 15869 LLRT Worn packing Repacked 3
IAS-21 11/9 10 15749 MOV-15C OPS Limit switch out of Readjusted limit switch, performed 20 adjustment preventative maintenance on limitorque 11/10 01-125 15688 Inadvertent spray down Replaced charcoal 40 F-2B OPS of charcoal filters 11/15 01-125 15832 Inadvertent spray down Replaced charcoal 60 F-2B OPS of charcoal filters 11/16 01-125 15877 F-2A DOP testin ; Failed iodine Replaced charcoal 40 absorbtlon test 11/1 24 13812/16054 Latch limit switch out Readjusted limit 1
EOD-1 OPS af adjustment 11/8 24 15745 EOD-1,2,3,4 OPS Light socket loosened Replaced socket, replaced blown 5
and fell into panel fuses O
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE
SUMMARY
I&C NOVEMBER 1981 WORK REQUEST #
CAUSE OF RESULTS OF ACTION TAKEN REPAIR 1
DATE SYSTEM H
ECTED COMPONENT #
MALFUNCTION MALFUNCTION R CURRE H
RS 16066 Possible high Liain could not Jhanged GAF pot, 11/13/81 07 APRM-B-GAF OPS Jutput of LPRM le decreased grote WRED for 20
%tontnr
' PRM 13762 3 witch will not Replaced
\\E*
per 93-PS-10D I&C
.;,$cti switch 16.0 11 /4 /81 49 p_
3 witch will not Cleaned switch
,5847 iwii;ch was
, unction per and contacts 12.0 1
11/14/81 93 lirtY ga-Ps-12B I&c 4'-IMP-9 7.1 15848 Replaced Reed Reed switch Switch would switch 12.0
' 11/17/81 93 93-LS-3B I&C vas shorted not functon i,
Switch not Switch would l
15867 Adjusted aligned not meet 11/17/81 93 switch 10.0 93_p3_101B T&C nronerly F-TMP-93.1 l
i
)
1
/