Monthly Operating Rept for Nov 1981
ML20065T358
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 12/31/1981
From: Zufelt E
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
Shared Package
ML20065T352 List:
References
NUDOCS 8211020345
Download: ML20065T358 (6)


Text

.

OPERATING DATA REPORT DOCKET NO. 850 "I99 DATE DECEMBER COMPLETED BY ( E. ZUFELT91 TELEPHONE OPERATING STATUS FITZPATRICK Notes

1. Unit Name:

811101-811130

2. Reporting Period:
3. Licensed Thermal Power (MWI):

24 %

883

4. Nameplate Rating (Gross MWe):

021

5. Design Electrical Rating (Net MWe):

830 1

6. Maximum Dependable Capacity (Gross MWe):

810

(

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Irems Number 3 Through 7)Since Last Report, Gise Reasons:

NONE NONE

9. Power Level To Which Restricted,If Any (Net MWe):
10. Reasons For Restrictions,if Any:

i This Month Yr..to-Date Cumulatise 720 8016 55633

11. Ilours in Reporting Period 0

6637.2 39551.2

12. Number OfIlours Reactor Was Critical 0

0 0

13. Reactor Reserve Shutdown Hours 6540.O 98443.6 0
14. Ilours Generator On-Line 0

0 0

15. Unit Reserve Shutdown Hours 0

14217720 78401314

16. Gross Thermal Energy Generated (MWH) 0 4931100 26760610
17. Gross Electrical Energy Generated (MWH) 0 4779650 25904730
18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor 0%

81.6%

69 1%

0%

81.6%

69.1%

20. Unit Availability Factor 0%

73.6%

62.2%

21. Unit Capacity Factor (Using MDC Net) 0%

72.6%

56.7%

22. Unit Capacity Factor (Using DER Net) 0%

10.1%

16.9%

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each):

NONE

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

FEBRUARY 1982

\\,

Achieved

26. Units In Test Status (Prior to Commercial Operation)-

Forecast INITIA L CRITICALITY INITIA L ELECTRICITY COMMERCIAL OPERATION C211020345 811230 PDR ADDCK 05000333 R

PDR

AVER AGE DAILY UNIT POWER LEVEL DOCKET NO.

50-333 JAFNPP UNIT.

DATE DECEMBER 1981 E.ZUFELT COMPLETED BY (315)342-3840 TELEPilONE N

fBER, 1981 MONTH DAY AVER AGE DAILY POWER LEVEL DAY AVER ACE DAILY POWER LEVEL (MWe-Net)

(MWe. Net)

O I

17 n

0 2

0 gg 0

0 39 3

0 0

4 20 0

0 21 5

0 6

0 22 0

0 7

23 0

0 8

24 0

9 0

25 0

10 26 0

0 11 27 0

12 28 0

0 I3 29 0

0 14 3g 0

IS 16

SUMMARY

Fourth refueling and maintenance outage continued through'this reporting period.

DOCKET NO. 50-333 UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT N AME JAPNPP DATE DECEMBER 19n1 COMPLETED BY h.LUFELT REPORT MONTil NOVEMRPR 1981 TELEPilONEC 315 ) 342-1840

.! ?

3

.Ek Licensee E r, E%

Cause & Corrective No.

Date g

3g i!j jg&

Event a7 3

Action to 3 5 =5 Report

  • E0 Prevent Recurrence c3 5 5

O 12 811031 S

720 C

1 N/A N/A N/A Refueling outage (cumulative hours to date 742 7) i i

2 3

4 F: Forced Reason:

Method:

Exhibit G. Instructions S: Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data l

B Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee 1

C. Refueling 3 Automatic Scram.

Event ReporI(LER) FileINUREG.

D Regulatory Restriction 4 Other (Explain) 01611 E-Operator Training & License Examination F. Administrative 5

G Operational Error (Explain)

Exhibii 1 Same Source 4

Il Other (Explain)

POWER AUTHORITY OF'THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT NARRATIVE SUMMARRY OF OPERATIONAL EXPERIENCES NOVEMBER 1981 4

[^

The refueling and maintenance outage.which began October 2

31, 1981, continued throughout this reporting period.. Major

~

areas include'~ TORUS modification, LLRT testing, turbine s

generator maintenance, ISI testing, replacement of feedwater heaters and fire protection modifications.

'1 1

i w

e

~ ~

  • m f,

f 1

- I

g N

(

I t

i.e

- -. + + -

,.,y,

.~

,_-r-.x

_.,-..m 9y

-_y_.

r-_

=.r,.

-m---

POWER AUTHORITY OF THE STATE OF NEW YORK-JAMES A. FIT 7. PATRICK NUCLEAR POWER PLANT A

SAFETY RELATED ELECTRICAL & MECHANICAL MAINTENANCE

SUMMARY

NOVEMBER 1981 DATE SYSTEM HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T ME HOURS 11/15 39 15869 LLRT Worn packing Repacked 3

IAS-21 11/9 10 15749 MOV-15C OPS Limit switch out of Readjusted limit switch, performed 20 adjustment preventative maintenance on limitorque 11/10 01-125 15688 Inadvertent spray down Replaced charcoal 40 F-2B OPS of charcoal filters 11/15 01-125 15832 Inadvertent spray down Replaced charcoal 60 F-2B OPS of charcoal filters 11/16 01-125 15877 F-2A DOP testin ; Failed iodine Replaced charcoal 40 absorbtlon test 11/1 24 13812/16054 Latch limit switch out Readjusted limit 1

EOD-1 OPS af adjustment 11/8 24 15745 EOD-1,2,3,4 OPS Light socket loosened Replaced socket, replaced blown 5

and fell into panel fuses O

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE

SUMMARY

I&C NOVEMBER 1981 WORK REQUEST #

CAUSE OF RESULTS OF ACTION TAKEN REPAIR 1

DATE SYSTEM H

ECTED COMPONENT #

MALFUNCTION MALFUNCTION R CURRE H

RS 16066 Possible high Liain could not Jhanged GAF pot, 11/13/81 07 APRM-B-GAF OPS Jutput of LPRM le decreased grote WRED for 20

%tontnr

' PRM 13762 3 witch will not Replaced

\\E*

per 93-PS-10D I&C

.;,$cti switch 16.0 11 /4 /81 49 p_

3 witch will not Cleaned switch

,5847 iwii;ch was

, unction per and contacts 12.0 1

11/14/81 93 lirtY ga-Ps-12B I&c 4'-IMP-9 7.1 15848 Replaced Reed Reed switch Switch would switch 12.0

' 11/17/81 93 93-LS-3B I&C vas shorted not functon i,

Switch not Switch would l

15867 Adjusted aligned not meet 11/17/81 93 switch 10.0 93_p3_101B T&C nronerly F-TMP-93.1 l

i

)

1

/

9 s