Responds to NRC Re Violations Noted in IE Insp Rept 50-410/82-08.Corrective Actions:Welding Per Qualified Procedures Commenced,Tack Welds & Weld End Preparations Removed & Replaced & Grinnell Qa/Qc Procedures Investigated
ML20065T174
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 10/04/1982
From: Mangan C
NIAGARA MOHAWK POWER CORP.
To: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20065T162 List:
References
WPC-0094A, WPC-94A, NUDOCS 8211020249
Download: ML20065T174 (4)


Text

' ' '

M Y NIAGARA RUMOHAWK NIAGARA MOHAWK POWER CORPORATION /300 ERIE BOULEVARD WEST, SYRACUSE. N.Y.13202/ TELEPHONE (315) 474-1511 October 4,1982 Office of Inspection and Enfon:eraent Region I Attention: Mr. R. W. Starostecki, Director Division of Project and Resident Programs U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 Re: Nine Mile Point - Unit 2 Docket No. 50-410

Dear Mr. Starostecki:

Your Inspection Report No. 50-410/82-08 dated September 1,1982, identified an apparent violation resulting from an inspection conducted at the Nine Mile Point - Unit 2 Construction Site. Niagara Mohawk's response is enclosed.

Very truly yours, Niagara Mohawk Power Corporation Charles V. Man n Vice President Nuclear Engineering & Licensing SFM/NLR: sam Enclosure xc: 11r. R. D. Schulz, Resident Inspec, tor 8211020249 821029 PDR ADDCK 05000 0

WPC 0049a

_~

r NIAGARA M0 HAWK POWER CORPORATION NINE MILE POINT - UNIT 2 DOCKET NO. 50-410 Response to Notice of Violation Attached to NRC Inspection Report No. 50-410/82-08 The apparent violation was identified as follows:

10CFR50, Appendix B, Criterion IX, states in part, " Measures shall be established to assure that special processes, including welding, ... are controlled and accomplished by qualified personnel using qualified procedures in accordance with applicable codes, standards, specifications, criteria, and other special requirements."

The Nine Mile Point Nuclear Station, Unit 2, PSAR, Appendix D adopts the Stone & Webster Quality Assurance Program which provides quality assurance throughout the designated phases of the project including installation specifications.

Specification P301C, Field Fabrication and Erection of Piping, Revision 2, May 21,1981 states in part, "On ASME III piping, where impact testing is required, the weld procedure qualification tests shall include impact testing as mquired by ASME III."

Contrary to the above, prior to April 8,1982, welding procedures used for welding four Class I Main Steam piping joints, three Class I Residual Heat Removal piping joints, and authorized for use on ninety-five additional Class I piping joints in the High Pressure Core Spray, Residual Heat Removal, Feedwater, and Main Steam Systems, were not impact test qualified in accordance with Installation Specification P301C for ASME Boiler and Pressure Vessel Code,Section III, Subsection NB, Class I impact tested material .

This is a Severity Level IV Violation (Supplement II).

The following is submitted in msponse to this item of nonconformance:

Work was stopped on the 102 joints in question on April 13, 1982. The seven weld joints (four Class I Main Steam and thme Class I Residual Heat Removal) on which welding has been initiated are being cut out and replaced utilizing appropriately qualified procedures. This work has commenced and will be completed by approximately January 31, 1983.

The work authorization document (Field Planners) for the remaining ninety-five joints which reflected an improper welding procedure were withdrawn from the work ama and corrected. Note: Three of these ninety-five welds had tack welds or weld end preparation repairs which have been removed and replaced utilizing an appropriately qualified procedure.

WPC 0049a

A Special Review Group was established on June 3,1982, using experienced and qualified Stone & Webster personnel. Category I Field Planners authorized for use through that date were reviewed for correctness and completeness. The review included all work in process and work yet to be .

entered into production. Documentation for completed work will be  !

reviewed in a timely manner so that early identification and resolution of any past problem area is accomplished. No other instances of incorrect welding procedums being utilized or specified were discovemd as a result ,

of this review. Discrepancies which were identified during this review were documented and have been cormcted.

To identify the root cause of this problem and to detemine if any related problems existed, Stone & Webster, with concurmnce and participation by Niagara Mohawk, initiated an extensive review of ITT Grinnell activities.

This review consisted of a special program audit of Grinnell from May 3 through 14, 1982, to determine the effectiveness of and the ccupliance by personnel to the Grinnell Quality Assurance Manual and other supplementary l procedures and instructions as they affect the work performed. Stone and '

Webster also increased the site surveillance activities of Grinnell from May 10 through June 11, 1982. The surveillance effort was conducted to determine the adequacy and competency of Grinnell QA/QC personnel to perform their assigned responsibilities. Additionally, a sample planner review was conducted during May 5 through 7,1982, to detemine the extent and type of planner package deficiencies. The results of these investigations and the corrective actions were presented to the NRC at the July 16,1982, Nanagement Conference in the Region I office. .

All deficiencies found in the above reviews were documented, and cormctive action has been completed or scheduled for completion in the

near future.
In addition to the specific corrective actions detailed above, the following preventive measures have been initiated to preclude recurrence
1. Stone and Webster now reviews and concurs with the . adequacy of

.Grinnell engineering and QA/QC instructions of all Category 1 welding and/or bending Field Planner Packages prior to issuance to construction. As of July 1,1982, only those Category 1 welding and/or bending Field Planner Packages that have been reviewed and concurred with by Stone and Webster are mieased by Grinnell for construction. The results of the Stone and Webster review are being closely monitored. At such time that Stone and Webster and Niagara Mohawk determine that the Field Planner Packages are being l

consistently and properly prepamd, Stone and Webster review and concurrence will be reduced or discontinued as appropriate.

2. Grinnell has modified and strengthened its site engineering organization by upgrading the Category 1 planner preparation positions, strengthening the Category 1 planner checking process, and establishing an additional level of review, " verification of code acceptability." In addition, Grinnell has developed a revised training program for its engineering and QC personnel involved in i

planner preparation and checking.

WPC 0049a t

P

3. Grinnell senior management has become more involved in site activities, has made changes in corporate QA personnel, has improved coordination between its piping and support groups, and has modified and expanded its site QA/QC organization, including a site QA manager position with substantial oversight responsibilities including continued program evaluation.
4. St:ne and Webster has doubled its corporate audits of Grinnell for coupliance with QA requirements from 4 to 8 man-weeks annually and has inc.reased the number of QC surveillance staff responsible for Grinnell monitoring from one person to six persons.
5. Grinnell QA and interface procedures are being reviewed by Stone and Webster to ensure that sufficient specification of code detail exists and that the procedures are consistent, complete, and reflect current approved practices.
6. To improve communication further, the number of Stone and Webster and Grinnell management meetings have been increased and meetings are being held regularly.
7. On September 7,1982, a third Authorized Huclear Inspector was added by Grinnell for NW2. The Authorized Nuclear Inspector's primary responsibilities will be in-process inspections and sign-offs.

It is intended that the effectiveness of these measures, both corrective and preventive, will be formally assessed during a November 1982 review. The results will be available for NRC Region I Review as requested in Report No.

50-410/82-08 dated September 1,19t,.!.