ML20065T085

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Aug 1982
ML20065T085
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 09/01/1982
From: Auterino L
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
Shared Package
ML20065T076 List:
References
NUDOCS 8211020207
Download: ML20065T085 (6)


Text

-

..?

?

OPERATING DATA REPORT DOCKET NO. 50-286 DATE _9/1/82 COMPLETED BY L.

Auterino TELEPHONE

'*1di

~r10-8200 OPERATING STATUS Notes

1. Unit Name:

Indian Point no. 3 Nuclear power ni et

2. Reporting Period:

Aucust.1982

3. Licensed Thermal Power (MWr):

3025

4. Nameplate Rating (Gross MWe):

1013 965

5. Design Electricsl Rating (Net MWe):

f

6. Maximum Dependable Capacity (Gross MWe):

926 891

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (!tems Number 3 Through 7) Since Last Report. Give Reasons:
9. P:wer Level To Which Restricted. If Any (Net MWe):

l

10. Ressoas For Rest:ictions.If Any:

This Month Yr..to.Date Cumulative' 744 5.831.0 52.632.0

11. Hours In Reporting Period
12. Number Of Hours Reactor Was Critical 0

1.984.6 34.090.8

43. Reactor Reserve Shutdown Hours 0

0 0

14. Hours Generator On-Line 0

1.969.6 32.913.1 l HS. Unit Reserve Shutdown Hours 0

0

.0 0

5,060.030 86.143401 l

16. Gross Thermal Energy Generated (MWH)
17. Gross Electrical Energy Generated (MWH) 0 1.502.170 26.298.300 0

1.436.036 25.183.443

18. N;t Electrical Energy Generated (MWH) 0 33.8

.62.5

19. Unit Service Factor
20. Unit Availability Factor 0

33.8 62.5 0

27.6 53.7

21. Unit Capacity Factor (Using MDC Net) 0 25.5 49.6
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate 0

2.3 14.3

24. Shutdowns Scheduled Over Next 6 Months (Type.Date, and Duration of Each):

+-

Refueling outage in progress 8211020207 820909 kDRADOCK05000 Upon completion of scneduled 25, If Shut Down At End ut neport renvu.w..u.ated Date of Startup:

maintenance EST. Date (Jan. 83)

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY l

INITIAL ELECTRICITY COMMERCIAL OPERATION

i 1

f AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 286 Indian Point UNIT

  • M 3

DATE 9/1/82 COMPLETED BY t.

Auterino TELEPHONE (914) 739-8200 MONTH August, 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)

(MWe-Net) 1 0

g7 0-2 0

gg 0

3 0

39 0

4 0

20 0

5 0

21 0

6 0

22 0

7 0

u 0

8 0

0 24 9

0 25 0

10 0

0 26 11 0

0 27 l

12 0

0 28 13 0

0 29 14 0

30 0

15 0

33 0

16 0

INSTRUCTIONS On this format, list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megantt.

(9/77) 4

NO ITCA r

E o

V t

h I

a t

T c

n C

i o

E d

2 M

R n

8 R

i 9

O d

1 C

e t

c s

a u

l g

p u

e A

R NO s

I g

T n

C i

N d

U a

T F

e R

L R

O A

P M

s E

u R

oen I

or Y

r R

E O

1 GET

.r A

o C

ta C

c ri od tn I

T aI N

r Y

E e1,

L M

ne H

P ev T

I Ge N

U L

O Q

l M

E ek sn ea iT D

y 1 a 3D H

2 T

8

/

A 5

D

/8 2

o N

66 7

R.

1 W

1 C

1

IMONTitLY MAINTENANCE adPUlff August, 1982 Montli

[J t. s IWm EQUIPHENT HAIEUNCTION COlutECTIVE ACTION

-2990 8/12/82 MS-55 Main steam valve on Leaks Paksed seat Cleaned seating su faces No. 32 steam generator.

-2996 8/12/82 FCV-1176A, Service water Valve failed open Clean and tighten wiring terminals valve from the Diesel Gener-on valve operator ators E

e 9

9 1

e 4

e 0

e e

l UNIT SilUTDOWNS AND POWER REDUCI10NS DOCKET NO.

50-286 ~

UNITNAME Indian Point No. 3 l DATE 9/1/82 REPORTMONTil Auaust,1982 COMPLETED HY L.

Auterino TELErilONE f9141 739-8200 e.

4,,5 E

e ri No.

Date E.

3yU L I" 5

5*.

Cause & Corrective

~

I.* "'

6(3

- i -$

U f3" N.3 p^-

S Action io gay Report #

ies u o-m Prevent Recurrence b

1 04 820325 S

744 B&C N/A N/A N/A Unit in a scheduled cycle III-IV refueling and maintenance outage.

I 2

3 4

F: Forced Reason:

Method:

Exhibit Instructions S: Scheduled A Equipment Failure (Explain)

1. Manual for Preparation of Data B-Maintenance or Test 2 Manual Scram.

Entry Sheets for Licensee C-Refueling 3 Automatic Scram.

Event Repent ILER) File (NUREG.

D-Regulatory Restriction 4-Other (Explain)~

0161)

E-Operator Training & License Examination F. Administrative 5

G-Operational Error (Explain) 19/77) 11-O her(Explain)

Exhibit. Same Source

r OPERATING EXPERIENCE Indian Point Unit 3 remained shutdown for the entire reporting period.

During the period of July 30 to August 5, a containment integreated leak rate test (ILRT) was performed.

Preparations for steam generator sleeving and secondary side girth weld repairs are in progress.

)