ML20065T085
| ML20065T085 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 09/01/1982 |
| From: | Auterino L POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK |
| To: | |
| Shared Package | |
| ML20065T076 | List: |
| References | |
| NUDOCS 8211020207 | |
| Download: ML20065T085 (6) | |
Text
-
..?
?
OPERATING DATA REPORT DOCKET NO. 50-286 DATE _9/1/82 COMPLETED BY L.
Auterino TELEPHONE
'*1di
~r10-8200 OPERATING STATUS Notes
- 1. Unit Name:
Indian Point no. 3 Nuclear power ni et
- 2. Reporting Period:
Aucust.1982
- 3. Licensed Thermal Power (MWr):
3025
- 4. Nameplate Rating (Gross MWe):
1013 965
- 5. Design Electricsl Rating (Net MWe):
f
- 6. Maximum Dependable Capacity (Gross MWe):
926 891
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (!tems Number 3 Through 7) Since Last Report. Give Reasons:
- 9. P:wer Level To Which Restricted. If Any (Net MWe):
l
- 10. Ressoas For Rest:ictions.If Any:
This Month Yr..to.Date Cumulative' 744 5.831.0 52.632.0
- 11. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical 0
1.984.6 34.090.8
- 43. Reactor Reserve Shutdown Hours 0
0 0
- 14. Hours Generator On-Line 0
1.969.6 32.913.1 l HS. Unit Reserve Shutdown Hours 0
0
.0 0
5,060.030 86.143401 l
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH) 0 1.502.170 26.298.300 0
1.436.036 25.183.443
- 18. N;t Electrical Energy Generated (MWH) 0 33.8
.62.5
- 19. Unit Service Factor
- 20. Unit Availability Factor 0
33.8 62.5 0
27.6 53.7
- 21. Unit Capacity Factor (Using MDC Net) 0 25.5 49.6
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate 0
2.3 14.3
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date, and Duration of Each):
+-
Refueling outage in progress 8211020207 820909 kDRADOCK05000 Upon completion of scneduled 25, If Shut Down At End ut neport renvu.w..u.ated Date of Startup:
maintenance EST. Date (Jan. 83)
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY l
INITIAL ELECTRICITY COMMERCIAL OPERATION
i 1
f AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 286 Indian Point UNIT
- M 3
DATE 9/1/82 COMPLETED BY t.
Auterino TELEPHONE (914) 739-8200 MONTH August, 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe-Net) 1 0
g7 0-2 0
gg 0
3 0
39 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
u 0
8 0
0 24 9
0 25 0
10 0
0 26 11 0
0 27 l
12 0
0 28 13 0
0 29 14 0
30 0
15 0
33 0
16 0
INSTRUCTIONS On this format, list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megantt.
(9/77) 4
NO ITCA r
E o
V t
h I
a t
T c
n C
i o
E d
2 M
R n
8 R
i 9
O d
1 C
e t
c s
a u
l g
p u
e A
R NO s
I g
T n
C i
N d
U a
T F
e R
L R
O A
P M
s E
u R
oen I
or Y
r R
E O
1 GET
.r A
o C
ta C
c ri od tn I
T aI N
r Y
E e1,
L M
ne H
P ev T
I Ge N
U L
O Q
l M
E ek sn ea iT D
y 1 a 3D H
2 T
8
/
A 5
D
/8 2
o N
66 7
R.
1 W
1 C
1
IMONTitLY MAINTENANCE adPUlff August, 1982 Montli
[J t. s IWm EQUIPHENT HAIEUNCTION COlutECTIVE ACTION
-2990 8/12/82 MS-55 Main steam valve on Leaks Paksed seat Cleaned seating su faces No. 32 steam generator.
-2996 8/12/82 FCV-1176A, Service water Valve failed open Clean and tighten wiring terminals valve from the Diesel Gener-on valve operator ators E
e 9
9 1
e 4
e 0
e e
l UNIT SilUTDOWNS AND POWER REDUCI10NS DOCKET NO.
50-286 ~
UNITNAME Indian Point No. 3 l DATE 9/1/82 REPORTMONTil Auaust,1982 COMPLETED HY L.
Auterino TELErilONE f9141 739-8200 e.
4,,5 E
e ri No.
Date E.
3yU L I" 5
5*.
Cause & Corrective
~
I.* "'
6(3
- i -$
U f3" N.3 p^-
S Action io gay Report #
ies u o-m Prevent Recurrence b
1 04 820325 S
744 B&C N/A N/A N/A Unit in a scheduled cycle III-IV refueling and maintenance outage.
I 2
3 4
F: Forced Reason:
Method:
Exhibit Instructions S: Scheduled A Equipment Failure (Explain)
- 1. Manual for Preparation of Data B-Maintenance or Test 2 Manual Scram.
Entry Sheets for Licensee C-Refueling 3 Automatic Scram.
Event Repent ILER) File (NUREG.
D-Regulatory Restriction 4-Other (Explain)~
0161)
E-Operator Training & License Examination F. Administrative 5
G-Operational Error (Explain) 19/77) 11-O her(Explain)
Exhibit. Same Source
r OPERATING EXPERIENCE Indian Point Unit 3 remained shutdown for the entire reporting period.
During the period of July 30 to August 5, a containment integreated leak rate test (ILRT) was performed.
Preparations for steam generator sleeving and secondary side girth weld repairs are in progress.
)