ML20065S220
| ML20065S220 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 10/31/1990 |
| From: | VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | |
| Shared Package | |
| ML20065S211 | List: |
| References | |
| NUDOCS 9012200150 | |
| Download: ML20065S220 (2) | |
Text
__-
o.
1 Corrected Page for October 1990 Report i
I r
l 7
9012200150 901214 PDR ADOCK 05000338 PDR R
l
}
r.
OPERAflWG DATA R[P(Of ODCKri No.:
50 339 Daft Novenber 4, 90 COMPLtitD BY:
T. Phltilps PHONE: (703) 894 2774 OPERAllWG STAfUS 1.
Uni t N ame s................................ N or t h Anna 2 2.
R epor t i ng Per i ods........................ 0c t ober 1990 3.
Licensed thermal Power (MWt).............
2893 4 Nameplat e Rat ing (Gross MWe).............
947 5.
Deslen Electrical Rating (Net MWe).......
907 6.
Maxinun Dependable Capacity (Gross MWe)..
957 7.
Mantrun Dependable Capacity (Wet MWe)....
909 8.
If changes occur in Capacity Ratings (items No. 3 thru 7) since last report, give reasons:
N/A 9 Power level to which restricted, if any (Wet MWe): _ N/A
- 10. Reasons f or restrictions, if any:
N/A Th'1 Month YtD Cunulative
- 11. Hours in Reporting Period................................
745.0 2,296.0 86,616.0
- 12. Number of Hours Reactor was critical.....................
0.0 5,570.3 69,692.A
- 13. R eac t or R eserve Shutdown Hours...........................
43.0 79.9 5,934.8 l
- 14. Hours Generator 0n %lne..................................
0.0 5,570.2 68,822,1
- 15. Unit Reserve shutdown Hours..............................
0.0 0.0 0.0
- 16. Gross thermal Energy Generated (MWH).....................
0.0 15,267,117.4 183,413,464.4 it. Gross Electrical Energy Generated (MWH)..................
0.0 5,027,524.0 60,033,041.0
- 18. Net t i ect ri c al Energy Genera t ed (MWM)....................
0.0 4,769,708.0' 57,608,540.0 l
- 19. Unit Service factor......................................
0.0%
76.3%
79.5%
- 20. Unit Avaltability factor.......'..........................
0.0%
6. 3%
79.5%
- 21. Uni t Capac i t y F ac t or ( us i ng MDC Ne t ).....................
0.0%
71.8%
74.0%
l
- 22. Uni t capac i ty f actor (us ing DER het ).....................
0.0%
72.1%
73.3%
- 23. Forced Outage Rate.......................................
0.0%
0.4%
6.5%
- 24. $hutdowns scheduled Over Next 6 Months (Type. Date, and Duration of tach): _ _ _
_ _75 day Refueling /10 year ISI outage started 8/22/90 l'
- 25. If $hutdown at end of Report Period, estimated time of startup:
11/5/90
- 26. Units in fest status (Prior to Coninercial Operation):
Forecast
. Achieved INITIAL CRiflCAlliY INiilAL ELECTRICITY COMMERCIAL OPERATION
~
1
.. -.