ML20065S184

From kanterella
Jump to navigation Jump to search
Amend 136 to License DPR-79,revising Tech Spec Re Containment Isolation Valve Nomenclature
ML20065S184
Person / Time
Site: Sequoyah 
Issue date: 12/10/1990
From: Hebdon F
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20065S187 List:
References
NUDOCS 9012200136
Download: ML20065S184 (5)


Text

I h,j

+

UNITED $TATEs

[

NUCLEAR REGULATORY COMMISSION 3 v.

5 W ASHING T ON,0. C. 206b6 4

D, d

/

    • o*

[j/

l~

L.-

i TENNESSEE VALLEY AUTHORITY l

DOCKET NO. 50-328 SEQUOYAH NUCLEAR PLANT, UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE bPR79 l

e o 1.

The Nuclear Regulatory Comission (the Comission) has found that:-

A.

The application for amendment by Tennessee Valley Authority (the licensee) dated May 21, 1990, as supplemented by the letter dated November 13.-1990, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the

- Comission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; e

C.

There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulstions and all applicable requirements have been satisfied, t

P

1,.

-2 2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.*C.(2) of facility Operating License No. OpR-79 is hereby amended to read as follows:

(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.136, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMMIS$10N

.b v

Frederick J. Hebtfon, Director project Directorate 11-4 Division of Reactor projects - 1/11 Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance: December 10, 1990

ATTACHMENT TO LICENSE AMEN 0 MENT No.136 FACILITY OPERATING LICENSE NO. DPR 3 DOCKET NO. 50-3?B Revise the Appendix A Technical Specifications by removing the pages identified below and inserting the enclosed pages. The revised pages are identified by the captioned amendment number and contain marginal lines indicating the area of change.

PEMOVE INSERT 3/4 6-19 3/4 6-19 3/4620 3/4 6-20

- - - - - - - ~ ~ ~ ~ ~ ~ ~ ~

~

~~

~~

TABLE 3.6-2 E'

g CONTAINMENT ISOLATION VALVES VALVE NUMBER FUNCTION MAXIMUM ISOLATICM TIME (Seconds)

~

g A.

PHASE "A". ISOLATION t

Z 1.

FCV-1-7 SG Blow Dn 10*

i 2.

FCV-1-14 SG Blow On 10*

3.

FCV-1-25 SG Blow Dn 15*

l 4.

FCV-1-32 SG Blow Dn 10*

5.

FCV-1-181 SG Blow Dn 15*

6.

FCV-1-182 SG Blow Dn 15*

7.

FCV-1-183 SG Blow Dn 15*

8.

FCV-1-184 SG Blow Dn 15*

9.

FCV-26-240 Fire Protection Isol.

20

10. FCV-26-243 Fire Protection Isol.

20

{

11. FCV-30-134 Cntat B1dg Press Trans 4*

Sense Line 4

12. FCV-30-135 Cntet Bldg Press Trans 4*

s e

Sense Line

13. FCV-31C-222 CW-Inst Room Cirs 10*
14. FCV-31C-223 CW-Inst Room Cirs 10*

i

15. FCV-31C-224 CW-Inst Room Cirs 1G*

i

16. FCV-31C-225 CW-Inst Room C1rs 10*
17. FCV-31C-229 CW-Inst Room Clrs 10*
18. FCV-31C-230 CW-Inst Room Clrs 10*

+

j

19. FCV-31C-231 CW-Inst Room Cirs 10*
20. FCV-31C-232 CW-Inst Room Clrs 10*
21. FSV-43-2 Sample Przr Steam Space 10*

l i

22. FCV-43-3 Sample Przr Steam Space 10*

i

23. FSV-43-11 Sample Przr Liquid 10*

l

24. FCV-43-12 Sample Przr Liquid IG*

s"

25. FSV-43-22 Sample RC Outlet Hdrs 10*

l i

E

26. FCV-43-23 Sagle RC Outlet Hdrs 10*

l

~

27. FSV-43-34 Accum Sample 5*

[

[

O$

28. FCV-43-35 Accum Sample 5*

~

29. FSV-43-55 SG Blow Dn Sample Line 10*

3 ro

30. FSV-43-58 SG Blow On Sample Line 10*

l e

i.

i f

=_.

.-. _ _ ~ _

N TABLE 3.6-2 (Continued)

I

- CONTAINPENT ISOLATION VALVES 1

4 I

VALVE NUMBER FUNCTION MAXIMUM ISOLATION TIME (Seconds)

E A.

PHASE "A" ISOLATION Z

31. FSV-43-61 SG Blow Dn Sample Line 10*

m

32. FSV-43-64 SG Blow Dn Sample Line 10*

j

33. FSV-43-75 Boron Analyzer 5*

i

34. FCV-43-77 2oron Analyzer 5*

i

35. FCV-61-96 Gylcol Inlet to Floor Cooler 30*

l

36. FCV-61-97 Gylcol Inlet to Floor Cooler 30*

}

37. FCV-61-110 Gylcol Outlet to Floor Cooler 30*

i

38. FCV-61-122 Gylcol Outlet to Floor Cooler 30*
39. FCV-61-191 Ice Condenser - Gylcol In 30*
40. FCV-61-192 Ice Condenser - Gylcol In 30*

2

,g 41.. FCV-61-193 Ice Condenser - Gylcol Out 30*

42. FCV-61-194 Ice Condenser - Gylcol Out 30*

4

43. FCV-62-61 RCP Seals 10 o
44. FCV-62-63 RCP Seals 10 i
45. FCV-62-72 Letdown Line 10*#
46. FCV-62-73 Letdown Line 10*#

l

47. FCV-62-74 Letdown Line 10*#
48. FCV-62-77 Letdown Line 20

[

49. FCV-63-23 Accum to Hold Up Tank 10*

i a

50. FCV-63-64 WDS N to Accum 10*

l l

[

51. FCV-63-71 Accum to Hold Up Tank 10*

i 2

s 52.-FCV-63-84 Accum to Hold Up Tank 10*

k

53. FCV-68-305 WDS N to PRT 10*

j 2

=

54. FCV-68-307 PRT to Gas Analyzer 10*

l

[

55. FCV-68-308 PRT to Gas Analyzer 10*

.o

56. FCV-70-85 CCS.from Excess Lt Dn Hx 10*

l

57. FCV-70-143 CCS to Excess Lt Dn Hx 60*

-58. FCV-77-9 RCDT Pump Disch 10*

I i

59. FCV-77-10 RCDT Pump Disch 10*

j j

.m

60. FCV-77-18 RCDT and PRT to V H 10*

m I

I l

. - -