Submits Final Documentation of Full Compliance W/License Condition 2.C.(12)(b) Re safety-grade Means for RCS Depressurization Per Technical Position Rsb 5-1,Revision 1
ML20065Q069
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 10/21/1982
From: Clayton F
ALABAMA POWER CO.
To: Varga S
Office of Nuclear Reactor Regulation
References
NUDOCS 8210260437
Download: ML20065Q069 (2)


Text

_

Mamng Address j

Allb ma Power Company 600 North 18th Street Post Office Box 264 ?

Birmingham, Alabania 35291 Telephone 205 783-6081 F. L Clayton, Jr.

R,"l ' ;;2dl"'

WabamaPower j

the southern ekxtnc system October 21, 1982 Docket No. 50-364 Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Attention:

Mr. S. A. Varga Joseph M. Farley Nuclear Plant - Unit 2 License Condition 2.C.(12)(b)

Safety Grade Backup Means of RCS Depressurization Gentlemen:

Pursuant to License Condition 2.C.(12)(b), regarding assurance that the safety grade means of reactor coolant system depressuriza-tion is in accordance with the requirements of Table 1 in Branch Technical Position RSB 5-1, Rev. 1, Alabama Power Company hereby submits final documentation of full compliance with this condi-tion.

No modifications or additional provisions are necessary to demonstrate compliance with the requirements of Table 1.

According to Supplement No. 5 to NUREG-0117, " Safety Evalua-tion Report Related to the Operation of Joseph M. Farley Nuclear Plant Unit 2," page 6-16, the NRC concluded that Farley Unit 2 satisfied the applicable requirements of Branch Technical Position RSB 5-1 and is acceptable subject to the following conditions:

(1)

Perform tests of manual control of steam dump valves prior to full-power operation, (2)

Upgrade the PORV operators based on EPRI test results, and (3)

Complete natural circulation cooldown tests and cooldown procedures.

These three conditions were included in the Unit 2 Operating License and have been addressed as follows:

(1)

The requirement to demonstrate manual control of the Farley Steam Dump Valves, License Condition 2.C.(12)(a),

was completed prior to exceeding 5 percent power.

gO260437821021

~

p ADOCK 05000364 i

PDR

4 Mr. S. A. Varga October 21, 1982 Director, Nuclear Reactor Regulation Page 2 U.S. Nuclear Regulatory Commission (2)

Qualification of the Farley PORVs, License Condition 2.C.(21)(d)(1), was documented in Alabama Power Company letters dated June 25, 1981, September 30, 1981 and July 1, 1982.

(3)

License Condition 2.C.(9)(a) was completed prior to exceeding 5 percent power.

Alabama Power Company's letter of July 8,1982 described compliance with License Condition 2.C.(9)(b) and License Condition 2.C.(12)(c).

These license conditions constitute Alabama Power Company's commitments related to natural circulation cooldown tests and procedures.

Alabama Power Company has independently evaluated the applicable requirements of Table 1 in Branch Technical Position RSB 5-1, Rev. 1, and determined that Farley Unit 2 complies without need of modification or additional provisions.

This conclusion agrees with the NRC findings published in Supplement No. 5 to NUREG-0117; therefore, based on completion of the three conditions described above, License Condition 2.C.(12)(b) has been met and is considered complete by Alabama Power Company.

Yours very truly,

. L. Clayto

, J r.