ML20065P417
| ML20065P417 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 09/28/1982 |
| From: | Baynard P FLORIDA POWER CORP. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML20065P408 | List: |
| References | |
| 3F-0982-21, 3F-982-21, NUDOCS 8210260010 | |
| Download: ML20065P417 (1) | |
Text
{{#Wiki_filter:=..w aw ~. ~ ~a a- - 'v . x.w.w... aixa.:.;w - cmwxm wmemw.c~~ ~~w m .a.m y ,3:,j 7 01,4 m . j; ,*'O '.?:..,.-{ji e, ,..o 4 ,y y M Power C O n c o n a r e o se September 28,1982
- 3F-0982-21 f
File: 3-0-5-g \\ Mr. 3.P. O'Reilly Regional Administrator U.S. Nuclear Regulatory Commission, Region 11 101 Marietta Street N.W., Suite 3100 Atlanta, GA 30303
Subject:
Crystal River Unit 3 Docket No. 50-302 Facility Operating License No. DPR-72 Radiological Emergency Response Plan
Dear Mr. O'Reilly:
Florida Power Corporation hereby submits the enclosed copy of the Crystal River Unit 3 Radiological Emergency Response Plan (Rev.1). This submittal is pursuant to the requirements of 10 CFR 50.54(q) for changes made without prior NRC approval, which are to be submitted within thirty (30) days; and to the requirements of Regulatory Guide 10.1, Rev. 4, Appendix A, No. 66 for distribution of the same emergency plan changes. Revisions to the Plan were made as a result of the NRC Confirmation of Action Letter dated April 8,1982. Revisions are denoted by a bar in the margin of each affected page. Should there be any questions, please contact this office. 1 Patsy Y. Baynard l Assistant to Vice President Nuclear Operations l Enclosure (1 copy) l PYB/myf cc: Document Control Desk (1 copy) U.S. Nuclear Regulatory Commission Wachinotnn Dr. 70555 8210260010 821005 S 2 1 0 0 ', 0 2 M m --- PDR ADOCK 05000302 r" " 000 :' C ~ "- F PDR ueneral Ultice uui irurry-rc,rth Street South e P O Box 14042. St Petersburg. Florida 33733 e 813-866-5151 ,-7,,., n y. v.w.7 [ s s$ 9 -4, u __J__,_*_}}