ML20065P265

From kanterella
Jump to navigation Jump to search
Forwards Rev 0,Vols 1 of VEPCO North Anna Power Station Unit 1 Insp Plan for Second Insp Interval..., & VEPCO North Anna Power Station Unit 2 Inservice Insp Plan for Second Insp..., Per Committment in Util
ML20065P265
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 12/10/1990
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20065P268 List:
References
90-744, NUDOCS 9012130190
Download: ML20065P265 (2)


Text

f r ,.-

. '( 8 (o . .

Y11tOIN1A ISI.!!CTitIC AND POWUli COMi%NY RICllMOND,Yll40lNI A 2112 61 December 10,1990 U.S. Nuclear Regulatory Commission Serial No. 90 744 Attention: Document Control Desk NES/lSI/EWT:jbl R1 Washington, D.C. 20555 Docket Nos. 50 338 i 50 339 License Nos. NPF 4 NPF-7 Gentlemen:

  • VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 SECOND TEN YEAR INSPECTION INTERVAL IMSfRVICE INSP8ECTION PROGR AM PLANS On November 1,1990 for North Anna Unit 2 and November 21,1990 for North Anna Unit 1, Virginia Electric and Power Company submitted the latest inservice Inspection Programs for the second inspection interval. As committed in that correspondence, we are sub nitting tne second intervalinservice inspection program plans. These program plans identify the specific components and component supports selected for examination during the second ten year interval. The program plans also provide details of the examinations and tests to be performed.

These inservice inspection program plans meet the requirements of the applicable editions of Section XI of the ASME Boller and Pressure Vessel Code, i.e.,1983 i Edition, Summer 1983 Addenda, for North Anna Unit 1 and 1986 Edition for North Anna Unit 2. As identified in our November 21, 1990 letter, the North Anna Unit 1 program plan includes some of the enhancements of the 1986 Edition of the Code making the Unit 1 program similar10 the Unit 2 program.

To facliitaa /our review of these program plans, we will provide one set of reference drawings foi each unit under separate cover to the NRC Project Manager. We will also provide a copy of each program and one set of the reference drawings for each unit to the NRC's reviewers at EG&G Idaho, Inc.

Should you have any questions or require addit!onal information, please contact us.

Very truly yours,

$Ul W. L. Stewart Senior Vice President - Nuclear ,

g

,m 2 m 190 +o1210 ps a w cx *

  • ggge u MIT g

Enclosures

1. North Anna Unit 1 Second Intervalinservice Inspection Program Plan for Components and Component Supports. (9 Copies)
2. North Anna Unit 2 Second Interval inservice inspection Program Plan for Components and Component Supports. (9 Copies) cc: U.S. Nuclear Regulatory Commission Region ll 101 Marietta Street, N.W.

Suite 2900 Atlanta, Georgia 30323 Mr. M. S. Lesser NRC Senior Residnt inspector North Anna Power Station