r 7
OPERATING DATA REFORT DOCKET NO. 50 - 277 DATE OCTOPER 15. 1982 COMPLETED BY PHIL ADELPHI A ELECTRIC COMPANY W.M.ALDEN E NG I NE E R -l h-CH AR G E huCLEAR SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 CPERATING STATUS
- 1. UNIT NAME PEACH 90TTOM UNIT 2 1 NOTES UNIT 2 EXPERIENCED ONE l
g i
- 2. REPORTING PERIOD: SEPTEMBER, 1982 i
SCHEDULED LOAD REDUCTION l
g g
- 3. LICENSED THERMAL POWER (MW'T):
3293 i
AND TWO FORCED SHUTDOWNS.
l i
- 4. NAMEPLATE RATING (GROSS MWE):
1152 l
1 g
- 5. DESIGN ELECTRICAL RATING (NET MWE):
1065 l
1.
g l
- 6. MAXIMUM DEPENDABLE CAPACITi (GROSS MWEls 1098 I
l
- 1051 l
l 8.
IF CHANGES DCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT GIVE REASONS
- 9. POWER LEVEL TO WHICH RESTRICTED. IF ANY (NET MWElf
- 10. REASONS FOR RESTRICTIONS. IF ANYt THIS MONTH Y R -T D-D A T E CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 720 6.551 72.239
- 12. NUMBER OF HOURS RE ACTOR W AS CRITICAL 714.3 3.383.1 53.326 5
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 00 00 14 HOURS GENERATOR ON-LINE 683.4 3.154.7 51.611.2
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 17. GROSS ELECTRIC AL ENERGY GENERA TED (MWH) 717.440 2.983.010 49.486.780
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 691.145 2.844.195 47.434.930
- 19. UN'If SERVICE FACTOR '
94.9~
48.2 71 4
- 20. UNIT AVAILABILITY FACTOR 94.9 48.2 71.4 l
- 22. UNIT CAPACIT( FACTOR (USING DER NET) 90.1 40.8 61.7 I
- 23. UNIT FORCEf CUTAGE RATE 5.1 2.2 7.8 l
- 24. SHUTDOWNS' SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DUR ATION OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIOD E STIMATED DATE OF STARTUPI
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCI AL CPEPATICN):
FORECAST ACHIEVED INITIAL CRITICALITY l
INITIAL ELECTRICITY COMMERCIAL QPERATION gO220194821015 R
ADOCK 05000277 PDR
7 07ERATING DATA PEPORT DOCKET NO. 50 - 270 DATE OCTOBER 15. 1982 COMPLETED BY PHIL ADELPHI A ELECTRIC COMPANY W.M.ALDEN E NG I NE E R -I N-CH AR GE NUCLEAR SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 OPERATING STATUS
- 1. UNIT NAME PEACH BOTTOM UNIT 3 i NOTESI UNIT 3 EXPERIENCED ONE 4
g g
SCHEDULED LDAD REDUCTION l
g i
- 3. LICENSED THERM AL PDWERIMWT):
3293 i
AND ONE FORCED L'OAD I
g g
- 4. NAMEPLATE R ATING (GROSS MWElf 1152 l
REDUCTION.
l g
g
- 5. DESIGN ELECTRICAL RATING (NET MWElf IC65 l
l g
g
- 6. MAE IMUM DEPENDABLE C AP ACITY (GROS $ MWEl f 1098 l
l
- 7. M AX IMUM DEPEhD ABLE C AP ACITY (NET MWE l f 1035 l
l 8.
IF CHANGES DCCUR IN CAPACITY R ATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE RE ASCNSI
- 9. POWER' LEVEL TO WHICH RESTRICTED. IF ANY LNET MWElt'
- 10. RE A SONS FOR RESTRICTIONS. IF ANY8 THIS MONTH YR-TO-DATE CUMULATIVE
- 11. HOURS IN REPCRTING PERIOD 720 6.551 68.135
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 6.233.3 51.720.7
- 13. REACTOR RESERVE SHUTOOWN HOURS 0.0 0.0 0.0 14 HOURS GENER ATOR OH-LINE 720 0 6,165.0 50.391.8
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERM AL ENERGY GENERATED (MWH) 2,273,016 19.715,294 146.406,816
- 17. GRDSS ELECTRICAL ENERGY GENERaiED (MWH) 756.500 6.594.240 47.983.160
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 728.302 6,368.270 46.078.743
- 19. UNIT SERVICE FACTOR 100.0 94.1 74.0
- 20. UNIT AVAILABILITY FACTOR 100.0 94.1 74 0-
- 23. UNI T FORCED OUT AGE R ATE 0.0 5.9 7.7'
- 24. SHUTDOWNS SCHEDULED DVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH)*
- 25. IF SPUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUPt
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL CPERATION)*
FOREC A ST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY f
COMMERCIAL OPERATION
UNai SHUT 00WNS AND F0WER REDUCTIONS DOCKET NO. 50 - 277 UNIT NAME PEACH BOTTOM UNIT 2 DATE OCTOBER 15. 1982 REPORT MONTH SEPTEMEER, 1982 COMPLETED BY PHILADELPHI A ELECTRIC COMPANY
~
W.M.ALDEN E NGINE.R-IN-CH ARGE NUCLEAR SECTION GENERATION DIVISICN-NUCLEAR TELEPHONE (215) 841-5022 1
I l
l l METHOD OF l LICENSEE ISYSTEMICOMPONENTl CAUSE AND CORRECTIVE 1
ITYPElDURATION4REASONISHUTTING 00dNI EVENT l CODE I CODJ l ACTION TO NO.I DATE I (111 (HOURSil (2) l REACTOR (3) I REPORT C l (41 1 (5) l PREVENT RECURRENCE l
l l
l l
l l
l 8 I 8209D3 l Fl 20.9 1
8 l 1
1 NA l HC l HTEXCH I SHUTDOWN TAKEN TO REPAIR A 82A' l
I I
I I
i i
1 1 M31STURE SEPER ATOR DR AIN T ANK LE AK.
1 I
I I
i 1
I I
I 9 1 820910 l F i 15.7 1
D 1 1
1 NA l SA I VALVEX l SHUTDOWN T AKEN AFTER THE OUTER SERVICE I
I I
l' l
I I
I AIR VALVE TO THE DRYWELL WAS FOUND OPEN.
1 I
l 1
I I
I i
1 13 I 820912 l 51 0D.0 l
H l 4
I NA I RC l ZZZZZZ l LOAD REDUCTION FDR THE ADJUSTMENT OF THE I
l l
l I
I I
l
.I CONTROL ROD PATTERN.
I I
I ----- 1 I
I I
I I
I l
l 36.6 l
l l
l l
l (1)
(2)
(3)
(4)
F-F03CED REASON ME T HOD EXHIBIT G - INSTRUCTIONS
~
S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - M A NU AL FOR PREPAR ATION OF DATA Ba M AINTEN ANCE OR TEST 2 - MANUAL SCRAH.
ENTRY SHEET S FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.
EVENT REPORT (LER)
~
0 - REGUL AT ORY RE STRICT ION 4 - OTHER (EXPLAIN)
FILE (NUREG-0161)
E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINI STR ATIVE (5)
G - OPER ATIONAL E RROR (EXPLAIN)
H - OTHER(EXPLAINI EXHIBIT I - SAME SCURCE 9
is
t UNIT SHUTDOWNS AND F0WER REDUCTIONS DOCKE T NO. 50 - 2 78 UNIT NAME PEACH B01 TOM UNIT 3 DATF QCTOBER 15. 1982 REPORT MONTH SEPTEMEER, 1982 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTICN.
GENER AT ION DIVISION-NUCLE AR TELEPHONE (215) 841-5022 I
I l
l l METHOD OF l LICENSEE ISYSTEMICOMPONENTI CAUSE AND CORRECTIVE I
ITYPElDURATIONIREASONISHUTTING DOWN!
EVENT l CODE I CODE I ACTION TO N0e l DATE I (131 (HOURSil (2) l REACTOR (3) l PEFORT C l (4 ) l (5) l PREVENT RECURRENCE I
I I
i 1
I I
I i
14 I 820917,I 51 00.0 l
H I 4
l NA l RC l 222222 l LOAD REDUCTION FOR THE. ADJUSTMENT OF THE I
i l
l l
l l
l l CONTROL ROD PATTERN.
I I
l l
l I
I
'l 1
15 1 820922 1 F l 00.0 i
G l 4
l N4 l CB l PUMPXX l LOAD REDUCED AFTER RECICUL ATION PUMP l
l l
l l
l l
l l TRIP CAUSED BY A PER50hNEL ERROR.
I 1
1 1
I I
I I
I I
I l
1 I
I I
I I
I I
I I
i l
i l
I (1)
(2)
(3)
(4)
F - FORCEO REASON METHOD EXHIBIT G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - M A NU AL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM.
ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.
EVENT REPORT (LER)
D - REGULAT DRY RE STRICT ION 4 - OTHER (EXPLAIN!
FILE (NUREG-0161)
E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)
G - OPERATIONAL ERROR (EXPLAIN)
H ' OTHER(EXPLAIN)
EXHIBIT I - SAME SOURCE w
w
r-AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 277 UNIT PEACH BOTTOM UNIT 2 DATE OCT0EER 15, 1982 COMPANY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 MONTH SEPTEMBER 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER l.EVEL (MWE-NET)
(MWE-NET) 1 1057 17 1055 2
1059 18 1055 3
1048 19 1052 4
10 20 1053 5
791 21 1053 6
890
'22 1052 7
1047 23 1052 8
1049 24 1058 9
1053 25 1057 l
10 904 26 1056 i
i 11 209 27 1056 i
l 12 901 28 1050 13 881 29 1051 14 1051 30 1047 l
15 1052 I
16 1049 l
l I
7 AVERAGE DAILY UNI,T POWER LEVEL
^
DOCKET NO. 50 - 278 UNIT PEACH 20TTOM UNIT 3 DATE OCTOBER 15, 1982
<7, COMPANY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE j'
NUCLEAR SECTION GENERATION DIVISION-NUCLEAR j
TELEPHONE (215) 841-5022 MCNTH SEPTEMBER 1982
[
DAY AVERACE DAILY POWER LEVEL
'OAY AVERAGE DAILY POWER LEVEL (MWE-NET)
(MWE-NET) 1 1041 17 1004 2
1039 18 601 3
1036 19 909 4
1024 20 1047 5
1027 21 1042 6
1025 22 978 7
1024 23 10.57 8
1028 24 1055 9
1027 25 1049 t
10 1022 26 1046 11 1020 27 1052 12 1015 28
-1047 13 1014 29 1046
~
14 1013 30 1042 15 1011 16 1007
MM Attcchmant to Monthly operating Rsport for Saptembar, 1982 REFUELING INFORMATION 1.
Name of facility:
Peach Bottom Unit 2 2.
Scheduled date for next refueling shutdown:
October 15, 1983 3.
Scheduled date for restart following refueling:
December 10, 1983 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
Yes If answer is yes, what, in general, will these be?
Technical Specifications to accommodate reload fuel.
Modifications to reactor core operating limits are expected.
5.
Scheduled date(s) for submitting proposed licensing action and supporting.information; September 10, 1983 6.
Important licensing considerations associated with refueling, e.g., new or'different fuel design or supplier, unreviewed design or performanceLanalysis methods, significant changes in fuel design, new o'perating procedures:
None expected 7.
The number of_ fuel assemblies (a) in the core and (b) in the spent fuel ntor' age, pool:
7-(a) ' Core.- 764 Fuel Assemblies
.(b).
Fuel Pool - 1170 Fuel Assemblies, 58 Fuel Rods 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 2816 fuel assemblies.
9.
The projected date of the last refuelir.g that can be discharged to the spent fuel pool assuming the present licensed capacity.
Septemberi 1990 l
l l
a--
s Docket No. 50-278 Attachment to Monthly Oparcting Report for September, 1982 REFUELING INFORMATION 1.
Name of facility:
Peach Bottom Unit 3 2.
Scheduled date for next refueling shutdown:
February 12, 1983 3.
Scheduled date for restart following refueling:
April 8, 1983 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
Yes If answer is yes, what, in general, will these be?
Technical Specifications to accommodate reload fuel.
Modifications to reactor core operating limits are expected.
5.
Scheduled date(s) for submitting proposed licensing action and supporting information:
December 17, 1982 6.
Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, now operating procedures:
None expected 7.
The number of fuel assemblies (a) in the core and (b) in the sp'ent fuel storage pool:
(a)
Core - 764 Fuel Assemblies (b): Fuel Pool - 928 Fuel Assemblies, 6 Fuel Rods 8.
The present licensed spent fuel pool storage capacity _and the size oE'any. increase in licensed storage capacity that has
'been requested or is planned, in number of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 2816 fuel assemblies.
+
i 9.
The projected'date of the last refueling that can be discharg'ed to the spent fuel pool assuming the present licensed ~capacitv.
s - '
September, 1991 1
PEACH BOTTOM ATOMIC POWER STATION NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE SEPTEMBER 1982
-r, i
UNIT 2
- j r
The unit began the month at full power.
On September 3 the unit was removed from service for repair of a significant leak on the A moisture separator man-way gasket.
The unit was returned to service the same day and operated at full power until September 10 when difficulty maintaining nitrogen concentrations within the containment was discovered.
Air in leakage led to the discovery of an open service air system containment outboard isolation valve and the unit was shutdown to determine the position of the inboard isolation valve.
The unit was returned to service on September 11 and operated at full power until late on September 12 when power was reduced 25% for a control rod pattern adjustment.
Full load operation was restored the l
following day.
UNIT 3
-i The unit operated at full power until late on September-l l
17 when power was significantly reduced for a control rod sequence adjustment.
During the reduction the B recirculation l
l pump was removed from service for replacement of the MG set motor m
~,
e' brushes.
Ramp-up to full power began on September 19 with full power being achieved on September 20.
On September 22, power was drastically reduced due to a recirculation pump trip, caused by l
personnel error associated with construction work.
The unit
-g returned to full power later on September 22 and operated at full power until the end of the month.