Text
,.
n etc
,ft UNITED STATES
!.'(,[p.[c S
}
NUCLEAR REGULATORY COMMISSION 7
C WASHINoTON, o,C. 20565 0001 y
p POWER AUTHORITY OF THE STATE OF NEW YORK DOCKET NO. 50-333 JAMES A. FITZPATRICK NUCLEAR POWER PLANT AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 210 License No. DPR-59 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Power Authority of the State of New York (the licensee) dated December 29, 1993, complies with the standards and requirements of the Atomic Energy Act of 1954, as 1
amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; l
B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (11) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-59 is hereby amended to read as follows:
1 9404210195 940413' PDR ADOCK 05000333 P
i',
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 210, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of its issuance to be implemented within 30 days.
FOR THE NUCLEAR REGULATORY COMMISSION
.Robert A. Capra, Director Project Directorate I-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance:
April 13,1994
ATTACHMENT TO LICENSE AMEN 0 MENT NO. 210 FACILITY OPERATING LICENSE NO. OPR-59 DOCKET N0. 50-333 Revise Appendix A as follows:
Remove Paaes Insert Pacel vi vi 141 141 141a 141a 142 142 162a 162a
9 JAFNPP LLST OF TABLES (Cont'd) labbh Tit!g Pane 4.2 8 Minimum Test and Calibration Frequency for Accident Monitoring 86 instrumentation 4.6 1 Snubber Visual inspection interval 161 4.6-2 Minimum Test and Calibration Frequency for Continuous Atmosphere 162a Monitoring System 4.7-1 (DELETED) 210 4,7-2 Exception to Type C Tests 211 3.12-1 Water Spray / Sprinkler Protected Areas 244j 3.12-2 Carbon Dioxide Protected Areas 244k 3.12 3 Manual Fire Hose Stations 2441 4.12-1 Water Spray / Sprinkler System Tests 244q 4.12-2 Carbon Dioxide System Tests 244r 4.12-3 Manual Fire Hose Station Tests 244s 6.2-1 Minimum Shift Manning Requirements 260a 6.10-1 Component Cyclic or Transient Umits 261 Amendment No. -20, 22, 02, l ' 1,130,131,150,173,180,181, 210 vi
JAFNPP 3.6 (cont'd) 4.6 (cont'd) 4.
Except as specified in 3.6.C.3 above, the reactor coolant water shall not exceed the following limits with steaming rates greater than or equal to 100,000 lb/hr and during reactor shutdowns.
Conductivity 5 pmho/cm Chloride ion 0.5 ppm 5.
If Specification 3.6.C cannot be met, the reactor shall be placed in a cold condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
D.
Coolant Leakaoe D.
Coolant Leakaoe l
1.
Anytime irradiated fuel is in the reactor vessel and the 1.
Reactor coolant leakage rate inside the primary l
reactor coolant temperature is above 212*F, the reactor containment shall be monitored and recorded once every coolant leakage into the primary containment shall be 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> utilizing the Primary Containment Sump limited to:
Monitoring System (equipment drain sump monitoring and floor drain sump monitoring),
s.
5 gpm unidentified leakage b.
2 gpm increase in unidentified leakage with!n any 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period. ' (This limitation shall apply only after a period of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> at operating pressure.)
- The total reacter coolant leakage into the primary '
c.
containment shall not exceed 25 gpm.
I F
f f
h Amendment No. ' 7, SO, ? 02,210 141
JAFNPP 3.6 (cont'd) 4.6 (cont'd) l 2.
With reactor coolant system leakage greater than the 2.
Not Used limits specified 'o 3.6.D.1.a or 3.6.D.1.c, the leakage rate l
shall be reduc 9 to within these limits within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or the reactor shall be in at least the hot standby condition within the following 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in cold condition within the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
3.
With an increase in unidentified reactor coolant system 3.
Not Used leakage equal to or greater than the limit specified in l
3.6.D.1.b. the source of the leakage shall be identified within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or the reactor shall be in at least hot standby condition within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in cold condition within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
l 4.
The Primary Containment Sump Monitoring System 4.
The Primary Containment Sump Monitoring System (Equipment Drain Sump Monitoring and Floor Drain Sump (Equipment Drain Sump Monitoring and Floor Drain Sump Monitoring ) and the Continuous Atmosphere Monitoring Monitoring) instrumentation shall be calibrated and System (Gaseous and Particulate) shall be operable when checked as specified in Surveillance Requirement 4.2.E.
the reactor coolant leakage limits of Specification 3.6.D.1 Continuous Atmosphere Monitoring System (Gaseous and are in effect.
Particulate) instrumentation shall be functionally tested and calibrated as specified in Table 4.6-2.
I Amendment No. -tear 210 141a
JAFNPP 3.6 (cont'd) 4.6 (cont'd) 5.
With the Primary Containment Sump Monitoring System (Equipment Drain Sump Monitoring or Floor Drain Sump l
Monitoring) inoperable, restore the system to operable status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least hot shutdown within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in the cold condition within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
6.
With the Continuous Atmosphere Monitoring System (gaseous) or the Continuous Atmosphere Monitoring System (particulate) inoperable, operation may continue for up to 30 days provided grab samples of the containment atmosphere are obtained and analyzed at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Otherwise be in at least hot shutdown within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in cold shutdown within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
Amendment No. 28, 50, 102, 102, 203 210 142
.=
JAFNPP Table 4.6-2 Minimum Test and Calibration Frecuency for Continuous Atmosohere Monitorino System Inst. Channel Inst. Functional Test Calibration Sensor Check 1.
Air Particulate Analyzer None Once / 3 mos.
once / day 2.
Gaseous Activity Analyzer None Once / 3 mos.
once ! day i.
l Amendment No.. 23, 200, 200, 210 162a
- -.