4 GPU Nuclear Corporation
& J Nuclear
- 'en:r388 4
Forked River, New Jersey 08731-0388 609 971-4000 Writer's Direct Dial Number:
C321-94-2053 April 13,1994 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555
Dear Sir:
Subject:
Oyster Creek Nuclear Generating Station Docket No. 50-219 Monthly Operating Report - March,1994 In accordance with the Oyster Creek Nuclear Generating Station Operating License No.
DPR-16, Appendix A, Section 6.9.1.C, enclosed are two (2) copies of the Monthly Operating Data (gray book information) for the Oyster Creek Nuclear Generating Station.
If you should have any questions, please contact Brenda DeMerchant, Oyster Creek Licensing Engineer at (609) 971-4642.
Sincerely, l
/h 1 ;arton J
. hPresident and Director
/i yster Creek JJB/BDEM: jc Attachment (MoR-RPT.HAR) cc:
Adtninistrator, Region 1 Senior NRC Resident Inspector Oyster Creek NRC Project Manager 9404190185 940331 I
PDR ACOCK 05000219
(,
R PDR h
GPU Nuclear Corporation. is a subsidiary of General Public Utilities Corporation
d.
- i j.~
EUMMARY t
- 1 MARCII.1994 i
o
..f Oyster Creek operated at full power for the month of March. The plant generated 468,185 net megawatt hours electric, and attained a 103.2% MDC net capacity factor for the month.
i 4
I' y
h!ONTIUlJ OPERATING REPORT LICENSEUEENT REPORTS The following Licensee Event Report was submitted during the month of March,1994:
LER 94-002 On 2/13/94 at 2:00 p.m. it was observed that fuel oil level in the Main Fuel Oil Tank had dropped below the level necessary for Appendix R fire protection design requirements.
Difficulty in receiving fuel shipments in a timely manner occurred due to the vendor's decision not to place trucks on dangerous roads when state officials banned trucks and vehicular traffic on most major roadways for significant periods of time due to hazardous conditions. IIcating Boiler Tank Level dropped below 6'3" (system design minimum level for fuel oil pump suction pressure) to 6'0". One shipment of 7590 gallons was received on 2/13/94 restoring level to above 6'3"and another shipment of 7800 gallons was received on 2/14/94. During the period of low tank level, the station blackout transformer was available to provide adequate power should a fire in the diesel generator fuel oil tank room oxur with a loss of offsite power. Therefore, the safety significance of this event is considered minimal.
L
Oyster Creek Station #1 Docket No. 50-219 REFUELING INFORMATION - MARCII, 1994 Name of Facility:
Oyster Creek Station #1 Scheduled date for next refueling shutdown:
Currently projected for September 10, 1994 Scheduled date for restart following refueling:
Currently projected for November 14, 1994 will refueling or renumption of operation thereafter require a Technical Specification change or other license amendment?
No Important licensing considerations associated with refueling, e.g.,
new or different fuel denign or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedureo 1.
General Electric Fuel Assemblieu - Fuel design and performance analysis methods have been approved by the NRC.
The number of fuel ascemblies (a) in the core 560
=
(b) in the spent fuel storage pool 1900
=
(c) in dry storage 8
=
The present licensed spent fuel pool storage capacity and the size of any increano in licensed atorage capacity that has been requested or la planned, in numbur of fuel assemblien:
Present Licensed Capacity:
2600 The projected date of the last refueling that can be discharged to the spent fuel A'
pool anauming the present licensed capacity:
Full core discharge capacity to the spent fuel pool will be available through the 1996 refueling outage.
NRC_RPT.WPD/117
OPERATING DATA REPORT OPERATIrlG STATUS 1.
DOCKET:
50-219 2.
REPORTING PERIOD:
3/94 3.
UTILITY CONTACT:
JIM KRALL (609)971-4115 4.
LICENSED TilERMAL POWER (HWL):
1930 5.
FIAMEPLATE RATING (GROSS MWo):
687.5 x 0.8 550
=
6.
DESIGN ELECTRICAL RATING (flET MWe):
650 7.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):
632 8.
MAXIMUM DEPENDAHLE CAPACITY (NET MWa):
610 9.
IF CHANGES OCCUR AHOVE 5INCE LAST E PT, GIVE REASOtiS NotlE
- 10. POWER LEVEL TO WilICil RESTRICTED, IF AtlY (ilET MWo):
NONE
- 11. REASON FOR RESTRICTION, IF ANY:
NotlE MHTH HaB GM.Ianyl
- 12. REPORT PERIOD llOURS 744.0 2160.0 212760.0
- 13. IlOURS RX CRITICAL 744.0 2160.0 141759.0
- 14. RX RESERVE SHUTDOWtl HRS 0.0 0.0 918.2
- 15. IIRS GENERATOR ON-LIllE 744.0 2160.0 138361.7
- 16. UT RESERVE SitTDWN llRS 0.0 0.0 0.0
- 17. GROSS THERM ENERGY (MWH) 1432706 4038019 2 7151397
- 18. GROSS ELEC EtlERGY ( MWil) 486031 1362455 79606769
- 19. flET ELEC EtlERGY (MWII) 468185 1312195 76359909
- 20. UT SERVICE FACTOR 100.0 100.0 65.0
- 21. UT AVAIL FACTOR 100.0 100.0 65.0
- 26. SilUTDOWils SCllEDULED OVER flEXT 6 MONTils (TYPE, DATE, DURATION):
15-R OUTAGE, SEPTEHHER 10, 1994, 55 - 65 DAYS
- es IF ditRgTLY SilVTDOWN, 27.
ESTIMATED STARTUP DATE:
ti/A
^
NRC_RPT.WPD/119
~.
AVERAGE DAILY POWER LEVEL NET MWe DOCKET #.
.50-219 UNIT.
OYSTER CREEK #1 REPORT DATE.
04-06-94 COMPILED BY
.JIH KRALL TELEPHONE #
.609-971-4115 MONTH:
MARCH, 1994 DAY M
DAX M
1.
629 16.
631 2.
628 17.
630 3.
622 18.
631 4.
631 19, 630 5.
631 20.
630 s e- & k&V-Sgh-? 630 21.
630 6.
7.
628 22, 631 8.
630 23.
629 9.
630 24.
629 10.
630 25.
629 11.
629 26, 628 12.
631 27.
628 13.
630 28.
627 14, 629 29, 628 15, 630 30.
629 31.
629 NRC RPT.WPD/118
c d-i L%IT SWT?cl.gS Awo so.TR REOUCTICWS DOCET ho:
50-219 LWIT KAME:
Ovster Creek r
CATE:
arrit C9, in C0f9LT'D BY:
David u. Ecan TELEP*10hE:
971-LS18 REPORT MJaiTM:
u m
- 1994 TYPE METHOD OF SeJTTING CORRECTIVE bc.
DATE F: Forced DURATION REAS0W (1)
DCb% THE REACTOR OR ACTICmS/CCMMENTS S: Sche ited (hours)
REDUCtk0 POWER (2) t There wre rx2 --
shutoow n er significant pcmer j
recuctions during this reporting
- period, t
4 t
L t
4 S(99tARY:
i
.(1) RfASCW
-(2) METeco a.
Equigrent Failure (Explain) e.
Operator Training & Lie Exam 1.
Manual b.
Maintenance or Test f.
Administrative 2.
Manual Scram c.
_ Refueling g.
Operational Error (Explain) 3.
Automaatic Scram I
d.
Regulatory Restriction h.
Other (Explain) 4 Other (Explain) i b
t e
u