,4 Telephone (412) 303-6000 O. Box 4 Shippmgport, PA 150714:004 -
April 8,1994 '
Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operating Reoort -
U. S. Nuclear Regulatory Commission
)
Document Control Desk i
Washington, D.C. 20555 i
Gentlemen:
i In accordance with Appendix A, Technical. Specifications,- the Monthly
-l Operating Report is submitted for Unit 1 and Unit 2 for the month.of March,1994, l
Respectfully, y
T. P. Noonan Division Vice President-Nuclear Operations
-i DTJ/mmg i
Enclosures cc: ~ NRC Regional Office King of Prussia, PA
.f i
[
l\\
9404180400 940331 PDR.ADOCK.05000334 PDR-
- R o
,.4.
NARRATIVE SG99M OF g
MNIHLY OPERATING EXPERIENCE INIT 1 MAROI 1994 March 1 The Unit operated at a nominal value of 100% output.
t1 rough March 4 March 5 The Unit continued to operate at - a rxninal value of 100%
l output.
At 1608 hours0.0186 days <br />0.447 hours <br />0.00266 weeks <br />6.11844e-4 months <br /> the Unit rartv'ad output to approximately _
95%- for testing of turbine governor valve controls.
At 1920 hours0.0222 days <br />0.533 hours <br />0.00317 weeks <br />7.3056e-4 months <br /> ~the Unit was returned to a nominal value of 100%
output following satisfactory conpletion of testirg.
March 6 The Unit operated at a ncainal value of 100% output.
through March 14 March 15 The Unit oczitinued to operate at - a ruminal value of 100%.
output.
At 1415 hours0.0164 days <br />0.393 hours <br />0.00234 weeks <br />5.384075e-4 months <br /> the Unit crwunarced a load reduction to approximately 32% output in order'to repair a broken bolt on=
the actuator for the "B" ' Main Feedwater Regulating Valve..
q Approximately 32% output was achieved at 2003 hours0.0232 days <br />0.556 hours <br />0.00331 weeks <br />7.621415e-4 months <br />.
March 16 Followirg otmpletion of repairs to the '"B" Main Feedwater' Regulating Valve, the Unit tvunnanced a return to full power at '
1430. hours.
The Uhit achieved approximately 100% output at 2300 hours0.0266 days <br />0.639 hours <br />0.0038 weeks <br />8.7515e-4 months <br />.
March 17 The Unit operated at a nominal value of 100% output.
through March 24 March 25 The Unit continued to operate at a nominal. value of'100%
output.
At 2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br /> the Unit r**M cutput to approximately 97% durity a routine maintenance. survaillance p.
- t re ; to couplete a O mnnel II A T/Tavg calibration.
The power reduction was performed as-a precaution E to avoid a turbinel runback and potential plant trip with one out of.three turbine' runback signals already tripped 'by the calibration r wtwe '
and a second channel known to' experience ev'r-aaional'. noise -
spikirq at higher power, levels.
March 26 At 0100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> the ' Unit returned to a 'naninal value of 100%
output
' following coupletion of the Qiannel' II-. Zh T/Tavg calibration.
March 27
'Ihe Unit operated at a ncminal value'of 100% output.
through March 31 L
.~. -
a,
' AVERAGE DAILY LNIT POWER 11 VEL DOCKPJ NO.
50-334 INIT BVPS Unit 1 DATE Anril 5, 1994 CMPLEITD BY - David T. Jones TELEPfENE (412) 393-7553 2
IDTIE _ March 1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL
(!"t iht)
(?53 Ikt) 1 824 17 821 2
822 18 825 3
820 19 821 i
4 821 20 833 5
817 21
-817 6
825 22 825 7
821 23 821 8
817 24 825 9
829 25 821 10 821 26 813 11 816 27 825 12 817 28 825 t
13 829 29 825' 14 821 30 825 e
15' 642 31
'817 16 363 g.
'INSIRUCTICtis on this form, list the average daily unit power level PHe-Net for each day in the reporting month. Canpute to the nearest whole megawatt.
L
4 OPERATING DATA REPORT DOCKET NO.-
50-334 REPORT DATE:
04/05/94 COMPLETED BY: DAVID T. JONES TELEPHONE:
(412) 393-7553 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
- 2. REPORTING PERIOD: MARCH 1994
- 3. LICENSED THERMAL POWER (MWt):
2652 4 NAMEPLATE RATING (Gross MWe):
923
- 5. DESIGN ELECTRICAL RATING (Net MWe):
835
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe):
860
- 7. MAX. DEPENDABLE CAPACITY (Net MWe):
810
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):
None
- 10. REASONS FOR RESTRICTIONS. IF ANY:
N/A THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD:
744.0 2160.0 157056.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL:
744,0 1924.4 101455.3
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 14 HOURS GENERATOR WAS ON LINE:
744.0 0.0 4482.8 1919.7 99462.9
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GEN. (MWH):
1920450.0 4996055.0 238401531.5
- 17. GROSS ELECT. ENERGY GEN. (MWH):
631550.0 1630690.0 76788213.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
595770.0 1533140.0 71752660.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 100.0 88.9 65.3
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 88.9 65.3
- 22. UNIT CAPACITY FACTOR (DER): PCT 95.9 85.0 57.2
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 11.1 15.7 24 SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
THE UNIT IS SCHEDULED TO SHUTDOWN FOR ITS TENTH REFUELING OUTAGE ON OCTOBER 7.
1994.
THE REFUELING OUTAGE IS SCHEDULED TO LAST FOR 70 DAYS.
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A I
m.
s
-Y Qisc
(~-
UNIT SHUTDOWNS AND POWER REDUCTIONS (220%)
Docket No.
50-334 Unit Name SVPS Unit #1 Date Aprit 5. 1994 Completed By.
David T.
Jones REPORT MONTH MARCH 1994 Telephone (412) 393-7553 Method of
! Licensee Cause & Corrective Duration shutting Event System Component Action to No.
Date-Typet (Hours)
Reason 2 Down Reactor 3 Report #
Code 4 Codes Prevent Recurrence.
4 940315 F
0 A
5 N/A HH VALVEX Unit reduced output to approminately 32% to repair a broken bott on the actuator for the "B" Main feedwater Regulating Valve.
1 2
3 4
F-Forced.
Reason:
Method:
Exhibit F-Instructions for S-Scheduled
-A-Equipment Failure (Explain) 1-Manual Preparation of Data Entry Sheets B-Maintenance'er Test 2-Manuel' Scram for Licensee Event Report (LER)' File
~C-Refueling 3-Automatic Scram (NUREG0161).
-D-Regulatory Restriction 4-Cont'd. from Previous Month E-Operator Training & License Exam
.5-Reduction 5
F-Administrative.
9-Other-Exhibit H-Same Source.
i
-G-operational Error (Explain)
'H-Other (Explain) x m.
.m-.
2 mum m
m.
c-v -
-- ~-
m i
m
'~
a NARRATIVE SG99M OF POlmiLY OPERATING EXPERIENCE h
INIT 2 MARCH 1994
' March 1
'1he Unit operated at a nominal value of 100% output during -
through the entire report period.
March 31 P
4
9 4 :
<l 4
AVERAGE DAILY WIT PCMER LEVEL DOCEEP No.
50-412 WIT BVPS Unit 2 DATE Anril 5. 1994 CDELETED BY David T. Jones TELEPHCHE f412) 393-7553 IOtTIH March 1994 DAY AVERAGE DAILY POWER LEVEL DAY AVIRAGE DAILY POWER LEVEL (We-Net)
(M4t-Net) 1 838 17
~843 2
837 18 841 3
838 19 841 4
834 20 837 5
838 21 836-6 835 22 844 7
835 23 837 8
841 24 835 9
842 25 846-10 842 26 844 11 843 27 842 12 840 28 846
~
13 837 29 846-14 839 30 846
'15 837 31 845 16 844 INSIEUCTIONS On this form, list the average daily unit power level We-Net for each day'in the reporting month. Ctmpute to the nearest whole mega'att.
h OPERATING DATA REPORT DOCKET NO :
50-412 REPORT DATE:
04/05/94 COMPLETED BY: DAVID T. JONES TELEPHONE:
(412) 393-7553 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
- 2. REPORTING PERIOD: MARCH 1994
- 3. LICENSED THERMAL POWER (MWt):
2652
- 4. NAMEPLATE RATING (Gross MWe):
923
- 5. DESIGN ELECTRICAL RATING (Net MWe):
836
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe):
870
- 7. MAX. DEPENDABLE CAPACITY (Net MWe):
820
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE IAST REPORT, GIVE REASONS:
9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):
None
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A THIS MONTH YEAR TO DATE CUMUIATIVE
- 11. HOURS IN REPORTING PERIOD:
744.0 2160.0 55839.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL:
744.0 2160.0 47490.3
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0 14 HOURS CENERATOR WAS ON LINE:
744.0 2160.0 47156.6
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0 16, CROSS THERMAL ENERCY GEN. (MW11) :
1957207.0 5682268.0 115914153.4
- 17. CROSS ELECT. ENERGY GEN. (MWH):
656464.0 1909445.0 37561450.0
- 18. NET ELECTRICAL ENERGY GEN. (MWil) :
625125.0 1816672.0 35466951.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 100.0 100.0 84.5
- 20. UNIT AVAIIABILITY FACTOR:(PERCENT) 100.0 100.0 84.5 21, UNIT CAPACITY FACTOR (MDC): PCT 102.5 102.6 77.0
- 22. UNIT CAPACITY FACTOR (DER): PCT 100.5 100.6 76.0
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.0 2.8
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A
.d
J.1
'r
" 4 UNIT SHUTDOWNS AND POWER REDUCTIONS (120%)
Docket No.
50-412 S
Unit Name BVPS Unit #2 Date April 5. 1994 Completed By David T. Jones REPORT MONTH MARCH 1994 Telephone (412) 393-7553 Method of Licensee Cause & Corrective Duration Shutting Event System Component Action to' No.
Date' Typel (Mours)
Reason 2 Down Reactor 3 Report #
Code 4 Code 5 Prevent Recurrence NONE i
8 1
2 3
4 F-Forced Reason:
Method:
Exhibit F-Instructions for S-Scheduled A-Equipment Falture (Explain) 1-Manual-Preparation of Data Entry Sheets B-Maintenance or Test.
2-Manuel Scree for Licensee Event Report (LER) File C-Refueling 3-Automatic scram.
'(NUREG0161).
D-Regulatory Restriction 4-Cont'd. from Previous Month E-Operator Training & License Exas:
5-Reduction 5
F-Administrative 9-Other Exhibit N-Same Source.
- G-Operational Error (Explain)
=