|
---|
Category:ANNUAL OPERATING REPORT
MONTHYEARML20195E8321998-12-31031 December 1998 10CFR50.59(b) Rept of Changes to Oyster Creek Sys & Procedures, for Period of June 1997 to Dec 1998.With ML20203B2781998-02-16016 February 1998 10CFR50.59(b) Rept of Changes to Oyster Creek Systems & Procedures ML20217C7591997-12-31031 December 1997 1997 Annual Environmental Operating Rept for Oyster Creek Nuclear Generating Station ML20249C3331997-05-31031 May 1997 Changes to Systems & Procedures for Period 950401-970531 ML20136H0181996-12-31031 December 1996 1996 Environmental Operating Rept for Oyster Creek Nuclear Generating Station ML20065H3101993-12-31031 December 1993 1993 Annual Environ Operating Rept for Oyster Creek Nuclear Generating Station ML20056B5141990-08-20020 August 1990 Description of Changes to Facility for CY89,per 10CFR50.59(a)(2) ML20206D8111988-10-30030 October 1988 Annual Rept of Mods for 1986 ML20083K1561984-03-26026 March 1984 Forwards Description of Changes Authorized by 10CFR50.59(a)(1) for CY82,per 10CFR50.59(b).Several Walls Removed,Per IE Bulletin 80-11 ML20112E6721983-12-31031 December 1983 Annual Rept of Facility Changes for CY83 as Authorized by 10CFR50.59(a)(2) ML19290E3441979-12-31031 December 1979 Annual Rept - Station Mods,1979. 1998-02-16
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217K4451999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Oyster Creek Nuclear Generating Station.With ML20211P6731999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Oyster Creek Nuclear Generating Station.With ML20211A7051999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Oyster Creek Nuclear Station.With ML20209G0631999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Oyster Creek Nuclear Generating Station.With ML20212H5491999-06-18018 June 1999 Non-proprietary Rev 4 to HI-981983, Licensing Rept for Storage Capacity Expansion of Oyster Creek Spent Fuel Pool ML20195E7961999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Oyster Creek Nuclear Generating Station.With ML20206N7431999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Oyster Creek Nuclear Generating Station.With ML20205P5401999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Oyster Creek Nuclear Generating Station.With ML20204C8201999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Oyster Creek Nuclear Generating Station.With ML20199E4671998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Oyster Creek Nuclear Generating Station.With ML20195E8321998-12-31031 December 1998 10CFR50.59(b) Rept of Changes to Oyster Creek Sys & Procedures, for Period of June 1997 to Dec 1998.With ML20198D2091998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Oyster Creek Nuclear Generating Station.With ML20195J8591998-11-12012 November 1998 Rev 11 to 1000-PLN-7200.01, Gpu Nuclear Operational QA Plan ML20195C4271998-11-0606 November 1998 Safety Evaluation Supporting Proposed Ocnpp Mod to Install Core Support Plate Wedges to Structurally Replace Lateral Resistance Provided by Rim Hold Down Bolts for One Operating Cycle ML20155J3021998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Oyster Creek Nuclear Generating Station.With ML20154R4981998-10-20020 October 1998 Core Spray Sys Insp Program - 17R ML20154L3051998-10-14014 October 1998 Safety Evaluation Accepting Licensee Request to Defer Insp of 79 Welds from One Fuel Cycle at 17R Outage ML20154Q3371998-09-30030 September 1998 Rev 8 to Oyster Creek Cycle 17,COLR ML20154L5571998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Oyster Creek Nuclear Generating Station.With ML20151V6311998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Oyster Creek Nuclear Generating Station.With ML20237D5691998-08-31031 August 1998 Rev 0 to MPR-1957, Design Submittal for Oyster Creek Core Plate Wedge Modification ML20237D5711998-08-18018 August 1998 Rev 0 to SE-000222-002, Core Plate Wedge Installation ML20237B0131998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Oyster Creek Nuclear Generating Station ML20236R0511998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Oyster Creek Nuclear Generating Station ML20249B2981998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Oyster Creek Nuclear Station ML20248F3531998-05-21021 May 1998 Part 21 Rept Re Electronic Equipment Repaired or Reworked by Integrated Resources,Inc from Approx 930101-980501.Caused by 1 Capacitor in Each Unit Being Installed W/Reverse Polarity. Policy of Second Checking All Capacitors Is Being Adopted ML20247F1891998-05-0505 May 1998 Risk Evaluation of Post-LOCA Containment Overpressure Request ML20247G0581998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Oyster Creek Nuclear Generating Station ML20216K0341998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Oyster Creek Nuclear Generating Station ML20151Y4651998-03-31031 March 1998 Non-proprietary Version of Rev 1 to GENE-E21-00143, ECCS Suction Strainer Hydraulic Sizing Rept ML20217A4631998-03-23023 March 1998 Safety Evaluation Accepting Use of Three Heats/Lots of Hot Rolled XM-19 Matl in Core Shroud Repair Assemblies Re Licenses DPR-16 & DPR-59,respectively ML20212E2291998-03-0404 March 1998 Rev 11 to 1000-PLN-7200,01, Gpu Nuclear Operational QAP, Consisting of Revised Pages & Pages for Which Pagination Affected ML20216J0841998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Oyster Creek Nuclear Generating Station ML20203B2781998-02-16016 February 1998 10CFR50.59(b) Rept of Changes to Oyster Creek Systems & Procedures ML20203A3801998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Oyster Creek Nuclear Generation Station ML20198P1791997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Oyster Creek Nuclear Station ML20217C7591997-12-31031 December 1997 1997 Annual Environmental Operating Rept for Oyster Creek Nuclear Generating Station ML20197E9131997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Oyster Creek Nuclear Station ML20199E4561997-11-13013 November 1997 Safety Evaluation Accepting Ampacity Derating Analysis in Response to NRC RAI Re GL-92-08, Thermo-Lag 330-1 Fire Barriers, for Plant ML20199D4381997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Oyster Creek Nuclear Station ML20202E8511997-10-21021 October 1997 Rev 0 to Scenario 47, Gpu Nuclear Oyster Creek Nuclear Generating Station Emergency Preparedness (Nrc/Fema Evaluated) 1997 Biennial Exercise. Pages 49 & 59 of Incoming Submittal Were Not Included ML20211M9481997-10-0303 October 1997 Supplemental Part 21 Rept Re Condition Effected Emergency Svc Water Pumps Supplied by Bw/Ip Intl Inc to Gpu Nuclear, Oyster Creek Nuclear Generation Station.No Other Nuclear Generating Stations Effected by Notification ML20198J7361997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Oyster Creek Nuclear Generating Station ML20211B7461997-09-24024 September 1997 Part 21 Rept Re Failure of Emergency Service Water Pump Due to Threaded Flange Attaching Column to Top Series Case Failure.Caused by Dissimilar Metals.Pumps in High Ion Svc Will Be Upgraded to 316 Stainless Steel Matl ML20210V0181997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Oyster Creek Nuclear Generating Station ML20210L2961997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Oyster Creek Nuclear Station ML20149F9961997-07-18018 July 1997 Safety Evaluation Re Gpu Nuclear Operational Quality Assurance Plan,Rev 10 for Three Mile Island Nuclear Generating Station,Unit 1 & Oyster Creek Nuclear Generating Station ML20196H0111997-07-11011 July 1997 Special Rept 97-001:on 970620,removed High Range Radioactive Noble Gas Effluent Monitor (Stack Ragems) from Service to Allow Secondary Calibr IAW Master Surveillance Schedule. Completed Calibr on 970628 & Returned Stack Ragems to Svc ML20210L3081997-06-30030 June 1997 Corrected Page to MOR for June 1997 for Oyster Creek Nuclear Generating Station ML20141H2051997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Oyster Creek Nuclear Station 1999-09-30
[Table view] |
Text
_
4'
.. GPU Nuclear Corporation GL M. Nuclear ;;; = : 388 Forked River.New Jersey 087310388 609 971-4000 -
Wnters Direct Dial Number:
A C332-94-2021 March 31, 1994 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555
Dear Sir:
Subject:
Oyster Creek Nuclear Generating Station (OCNGS).
Docket No. 50-219 Annual Environmental Operating Report Enclosed are two (2) copies of the 1993 Annual Environmental Operating Report (AEOR) for the OCNGS. The AEOR is submitted in accordance with Section 3.5.l(A) of the Oyster Creek Environmental Technical Specifications (0CETS).
If you have any questions concerning this submittal, please contact Mr. Joseph D. Lachenmayer of our Environmental Licensing staff at (201) 316-7971.
Very truly urs, p
7pp a J. IJ. frton
'e 'esident and Director Oyste Creek Nuclear Generating Station JJB/JDL/lt Enclosure cc: W. Russel (NRC)
NRC Resident Inspector, OC A. Dromerick, Jr. (NRC)
R. Stern (NJDEPE)
I 120031 9404140292 931231 I
{
PDR ADOCK 05000219 mem R PDR t GPU Nuclear Corporahon is a subsidiary of General Public Utihties Corporation
& 6 t
1993 ANNUAL ENVIRONMENTAL OPERATING REPORT OYSTER CREEK NUCLEAR GENERATING STATION LICENSE NO. DPR-16 DOCKET NO. 50-219 PREPARED BY:
GPU NUCLEAR CORPORATION FEBRUARY, 1994 l
1MM022.kr
.. U
I
'. 1 i
- 1. 0 , Introduction l This document is the Oyster Creek Nuclear Generating Station (OCNGS)
Annual Environmental Operating Report (AEOR) for 1993. This report is required by Oyster Creek Environmental Technical Specification (OCETS)
Section 3.5.l(A).
The OCNGS is a single cycle, forced circulation, boiling water reactor of 620 MWs maximum (summer) dependable net capacity, owned by Jersey Central Power & Light Company and operated. by GPU Nuclear Corporation. The OCNGS is located in Lacey Township, Ocean County, New Jersey. The plant is subject to Operating License No. DPR-16. The date of initial reactor criticality was May 3, 1969 and the commercial generation of power began on December 23, 1969.
This AEOR covers the period from January 1,1993 through December 31, 1993. The report is organized in the following format:
Section 1.0 - Introduction Section 2.0 - Environmental Monitoring Section 3.0 - Special Monitoring and Study Activities Section 4.0 - Additional Information 2.0 Environmental Monitorina This section is intended to address the results of environmental monitoring programs required to be implemented by Section 1.1 of the OCETS during the report period. The Fish Kill Monitoring Program was not initiated during this report period.
3.0 Special Monitorino and Study Activities An incident report concerning the capture of'an endangered sea turtle was submitted to the NRC on November 8, 1993. A biological assessment of the station'.' impact on Kemp's Ridley and Loggerhead sea turtles was forwarded to the NRC on March 15, 1994.
4.0 Additional Information This section reports any additional information that is required by Section 3.5.1 of the OCETS which includes a summary of:
a) All OCETS Non-Routine Environmental Operating Reports (NE0R) and the corrective action ttken to remedy them.
b) Changes made to State and Federal Permits and certificates which pertain to the requirements of the OCETS.
c) Changes in station design which could involve an ' environmental impact.
d) Changes to the OCETS.
IWO2J Rr
4.1 Summary of OCETS NE0R There were no NE0Rs during the report period.
Although not required by the OCETS, GPUN is including (Attachment I) a copy of a non-compliance report submitted to the New Jersey Department of Environmental Protection and Energy during this reporting period for a non-compliance with NJPDES Permit No. NJ 0005550. The permit non-compliance was minor in nature and did not result in an impact to public health or the environment.
Summary of Chances Made to Federal and State Permits and Certificates which Pertain to the Reauirements of OCETS There were no changes to Federal and State permits and/or certificates pertaining to the OCETS during the reporting period.
Summary of Chances in Station Desion Which Could Involve an Environmental Impact There were no changes in, or modifications of, station design during the reporting period which could involve an environmental impact.
4,2 Summary of Channes to the OCETS There were no changes to the OCETS during the reporting period.
1omum a
4 ATTACHMENT I NJPDES PERMIT No. 0005550 NONCOMPLIANCE REPORT j
11aM071hr
O .
e e Initial Telephone Date of Report Date: NA Occurrence: June 1. 1993 REPORT OF NONCOMPLIANCE WITH CONOTTIONS OF NJPOES PERMIT NO. NJ 000 5550 REPORT NUMBER 000 5550/93-01 10ENTIFICATION OF OCCURRENCE:
Noncompliance with Part III, Page 4, DSN 004 (combined Low Volume Wastewater Discharge).
Failure to obtain a sample for total residual chlorine (TRC) during monitoring period.
CA95E OF HONCOMPLIANCE:
Same as above.
0ESCRIPTION OF NONCOMPLYING DISCHARGE:
On June 1, 1993, while reviewing data documentation for the previous month, it was discovered that the sample for TRC at DSN 004 had not been obtained for the month of May.
QURATION OF NONCOMPLIANCE:
Reporting period of May, 1993.
CORRECTIVE ACTION TO REDUCE THE NONCOMPLYING DISCHARGli Not applicaole.
CORRECTIVE ACTION TO PREVENT RECURREHC[1 The sample collection procedure will be revised to ensure that check sheets are completed at the time of sampling to ensure that samples have been obtained. Iechnicians will be trained accordingly and supervisors will conduct a more timely review of data.
Prepared by: Barry Durham Date: June 22. 1993
- _. ._. .___ - . . _ .