ML20065G810
| ML20065G810 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 10/09/1990 |
| From: | ENTERGY OPERATIONS, INC. |
| To: | |
| Shared Package | |
| ML20065G808 | List: |
| References | |
| NUDOCS 9010230197 | |
| Download: ML20065G810 (1) | |
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
ums E3 8
Du TABLE 3.6-1 (Cont.)
CONTAINMENT ISOLATION VALVES f
Of PENETRATION ISOLATION b
NUMBER VALVE NUMBER FUNCTION TIME (SEC) m
,88 g $4 C. MANUAL (Cont.)
G LD e 1
2C3 2CV-5432#
Fuel Transfer Tube Isolation (outside)
N.A.
y D. OTHER (Check Valves) 2P9 2N -18 H.P. Nitrogen to SI Tanks (inside)
N.A.
2 2P39 2CVC-78 Quench Tank Makeup & Demin Water Supply (inside)
N.A.
2P40 2FS-37 Fire Water Isolation (inside)
N.A.
2P41 2N -1 L.P. Nitrogen Supply Isolation (inside)
N.A.
2 2P43 2SA-69 Service Air Supply Isolation (inside)
N.A.
w 2P46 2BA-216 Breathing Air Supply Isolation (inside)
N.A.
1 2P51 2AC-49 Chilled Water Supply Isolation (inside)
N.A.
-9 2P52 2CCW-38 CCW to RCP Coolers Isolation (inside)
N.A.
- Not subject to Type C leakage tests.
- May be opened on an intermittent basis under administrative control.
_