2.0 LIMITING CONDITIONS FOR OPERATION 2.1 THERMAL 3.1.1 Maximum Discharge Temperature Maximum dis, charge temperature shall be monitored as specified in Section 3.1.
2.2 HYDRAULIC Not applicable 2.3 CHEMICAL Objective (General)
To ensure that chemical releases from the station are controlled so as not to adversely affect public health'or the natural environment and which are consistent with applicable regulations.
2.3.1.
Biocides - (Chlorine)
Objective To limit the duration of chlorine application to the condenser cooling j
water and the maximum concentration of free available chlorine in the cooling tower blowdown.
Specification Concentrations of free available chlorine in the cooling tower blowdown shall not exceed average concentrations of 0.2 mg/l and maximum con-centrations of 0.5 mg/l at the discharge structure during a maximum cumulative. period of chlorine injection of 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> per day.
If levels exceeding that specified above are exceeded, corrective action t
i shall consist of reducing the chlorine injection rate.
Monitoring Requirement Fcr HrDI:S Permit No. PA0025615.