ML20065B295

From kanterella
Jump to navigation Jump to search
Corrected Amend 168 to License DPR-16,clarifying Requirements for Maintaning Secondary Containment Integrity
ML20065B295
Person / Time
Site: Oyster Creek
Issue date: 03/28/1994
From:
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20065B299 List:
References
NUDOCS 9404010235
Download: ML20065B295 (1)


Text

'%'

3 4

6.

With'one standby gas treatment system circuit inoperable:

a.

During Power Operation:

1 (1) Verify the operability. of the other : standby gas treatment system circuit within 2. hours.-

If testing.is required to demonstrate operability and significant paint _ing, fire, or chemical release has taken place-in the reactor building within the previous 12-hours, then demonstration by testing shall take place within l' hour of the expiration.of the 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> period, and-(2) Continue to verify the operability of the standby gas treatment system circuit once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> until the inoperable standby gas.

treatment circuit is returned to operable status.

(3) Restore the inoperable standby gas treatment circuit to operable status within 7 days or

+

be subcritical with reactor coolant temperature less than 212*F within~the next 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.

b.

During Refueling:

(1) Verify the operability of the other standby gas treatment system within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.- If testing is required.to demonstrate operability and significant painting, fire,

=

or chemical release has taken place in the reactor building within the previous 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />,'then demonstration by testing shall.

take place within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of the expiration of the 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> period, and (2) Continue to. verify the operability of the

. redundant standby gas treatment system once per 7 days until. the inoperable system.is returned to operable status.

(3) Restore the inoperable' standby. gas treatment system.to operable status within 30' days or cease all spent fuel handling',- core alterations or operation that could reduce-the shutdown maigin (excluding' reactor coolant temperature changes).

7.

If Specifications 3.5.B.5 and 3.5.B.6 are' not met, reactor shutdown shall be initiated and the reactor shall be in the cold shutdown condition within-24 hours and the condition of Specification 3.5.B.1 shall be met.

0YSTER CREEK 3.5-7 Amendment No.: 14,18,32,74,103,167,168 9404010235 940328' gDR ADOCK 05000229 PDR

.