UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING APPEAL BOARD In the Matter of
)
)
PENNSYLVANIA POWER & LIGHT COMPANY
)
)
Docket Nos. 50-387 and
)
)
50-388 ALLEGHENY ELECTRIC COOPERATIVE, INC.)
)
(Susquehanna Steam Electric
)
Station, Units 1 and 2)
)
AFFIDAVIT OF STEVEN H. CANTONE County of Lehigh
)
)
ss:
Commonwealth of Pennsylvania
)
Steven H.
Cantone, being duly sworn according to law, deposes and says as follows:
1.
I am Manager - Nuclear Support, Pennsylvania Power &
Light Company, and give this Affidavit to support the Stipulation of Withdrawal of Exceptions.
I have personal knowledge of the matters set forth herein and believe them to be true and correct.
A summary of my professional quali-l fications and experience
.s n'tached as Exhibit "A" hereto.
2.
The Commonwealth of Pennsylvania and Luzerne and t
Columbia County emergency plans currently call for each emergency worker to receive 3 types of personal dosimetry:
l l
i 8209140185 820909 PDR ADOCK 05000387
-O PDR
a.
CDV-742 (self-reading, 0-200 R);
b.
CDV-730 (self-reading, 0-20 R); and c.
Thermoluminescent dosimeter (TLD)
(permanent record).
At the present time, the Commonwealth has enough CDV-742's to supply each emergency worker with his own.
(The Commonwealth has an inventory of 112,872 CDV-742's,1/ enough to supply every emergency worker in the state with several of these dosime-ters).
Neither the Commonwealth nor the counties have enough CDV-730's or TLD's to supply each emergency worker.
3.
In consideration of many factors, including the legislation pending in the Pennsylvania legislature concerning payments by utilities for emergency planning costs, Applicants have agreed to supply funds for the Commonwealth to obtain 3192 TLD's and 2500 CDV-730's (or equivalent).
Applicants believe that this dosimetry, in conjunction with the existing stocks of CDV-742's, will provide more than adequate personnel dosimetry for emergency workers who might be involved in the event of an accident at the Susquehanna facility.
A copy of the Stipulation between the Commonwealth and Applicants is being filed separately.
1/
Memo from Walter P.
Pierson, Chief, Natural and Techno-l logical Hazards Division, Region III, FEMA, to Richard K.
Krimm, Assistant Associate Director, Office of Natural and Technological Hazards, FEMA, " Request by the Commonwealth of Pennsylvania for Radiological Emergency Preparedness (REP)
Dosimetry Equipment Assistance and Guidance on FEMA-REP-2",
dated August 21, 1982.
(A copy of which is attached as Exhibit B hereto.)
i 4.
The Stipulation provides for fewer CDV-730's than TLD's.
This is appropriate since CDV-730's can be used sequentially by more than one emergency worker while a TLD cannot.
The total number of available emergency workers would not need dosimetry at the same time (considering multiple shifts, etc.).
CDV-730's can be " zeroed" whenever personnel leave the EPZ and reassigned to entering personnel.
The number of CDV-730's will be more than enough to cover all emergency workers likely to need dosimetry at any one time.
5.
The 3192 TLD's should be readily available.
PP&L expects that the Commonwealth will be able to obtain these within 2 weeks.
6.
CDV-730's are not readily available in the desired quantities.
These dosimeters are available from 3 suppliers.
William B.
Johnson & Associates (which supplies a French-manufactured device) estimates that an initial delivery of CDV-730's could be furnished within 3 months, with com-pletion of deliveries within 6 months.
Dosimeter Corporation has stated that an initial delivery of 500 would be available in 4 months, with additional shipments of 500 per month thereafter.
Baird Corporation has estimated that an initial delivery of CDV-730's would be available within 60-90 days, with deliveries completed in about 180 days.
There are no known stockpiles of CDV-730's.
Therefore, it is estimated to j
be 6-9 months before enough CDV-730's could be supplied.
To l
l
the extent that other utilities or jurisdictions are also seeking to purchase CDV-730's, the delay could become even longer.
7.
Notwithstanding the absence of CDV-730's in quanti-ties sufficient to meet the numbers identified in the Commonwealth and county plans, the health and safety of emergency workers would be adequately protected in the unlikely event that an accident should occur during this period.
Although it would be preferable to have sufficient CDV-730's, they are not necessary to provide reasonable assurance that adequate protective actions can be taken for emergency workers within the plume exposure EPZ.
8.
It should first be pointed out that the risk during this interim period is very low because the period of time is relatively short.
9.
In addition, for the interim period, adequate self-reading dosimetry exists even if supplies of CDV-730's and TLD's are currently unavailable.
CDV-742's distributed to each emergency worker would give the worker the ability to detect doses well below levels at which he needs to take protective action.
This, together with other compensatory measures identified below, provides adequate protection for emergency workers.
10.
The protective action guide for emergency workers is 25 rem.
The Commonwealth and county plans call for an
_4_
emergency worker to seek replacement or complete the assigned task and then evacuate to a mass care / decontamination center when his self-reading dosimetry indicates a total dose in the 15 to 20 rem range.
The CDV-742 can readily provide this information.
11.
FEMA has stated that a.
the CDV-742 can be accurately read in the dose range far below the maximum emergency worker PAG; b.
the CDV-742 can be substituted for the CDV-730 where there are shortages; and c.
if a CDV-742 is assigned to an indi-vidual and remains with him throughout the duration of the emergency, then the CDV-741 is adequate for a self-reading dosimetric device.
See FEMA Memo, note 1 above.
FEMA has also observed that the range of the CDV-742 is from 4 to 200 R.2/
12.
PP&L has tested a number of CDV-742's to confirm their accuracy.
Fifteen CDV-742's were tested by William B.
Johnson & Associates.
The dosimeters were exposed to a Radium-226 source with a calibrated dose rate of 300 mR/hr for periods of 23 and 79 hours9.143519e-4 days <br />0.0219 hours <br />1.306217e-4 weeks <br />3.00595e-5 months <br />.
At an exposure of 6.9 R,'the average reading of the CDV-742's was 7.1 R, with a standard deviation of 1.5 R.
At an exposure of 23.7 R, the average 5
2/
FEMA-REP-2, " Guidance on Offsite Emergency Radiation Mea-surement Systems -- Phase 1 -- Airborne Release" (September 1980) at 5-8.
reading was 22.2 R, with a standard deviation of 3.3 R.
A second sample of 21 CDV-742's, 19 from the Columbia County supply and 2 from PP&L, was tested by Rad Services Incorporated.
This testing involved exposure to a calibrated Cobalt-60 source with a 48.71 R/hr dose rate for successive intervals of 6.61 minutes.
The dosimeters were irradiated to doses of 5, 10, 15, 20 and 25 R.
These dosimeters were found to be accurate within a range of + 10%.
Although the number of dosimeters tested is relatively small, these tests confirm FEMA's judgment on the usefulness of the CDV-742's.
13.
While readings for doses below 10 R are less exact than those above 10 R, a reading of 5 R on the CDV-742 is easily discernible.
A reading of 25 R is one-eighth of a full-scale reading.
Thus, emergency workers would be able to determine their doses at levels well below the action levels specified in the emergency plans.
14.
Assurance of the CDV-742's adequacy is also found in its conservative nature.
If it should fail, it will fail in a conservative direction, showing higher doses than actually exist.3/
When a CDV-742 is charged and set at zero, an electric charge is placed on a quartz fiber within the dosime-ter.
Radiation exposure reduces the charge and a visual scale calibrated for exposure indicates the total radiation received.
3/
Cember, Introduction to Health Physics, p.
247 (Pergamon Press 1969).
Failure modes involve a leak of the electrical charge.
This can be caused by spurious discharge from physical shock, or by dirt or moisture within the dosimeter from damage to the hermetic seal.
The leakage of the electric charge would cause the dosimeter to show a greater dose than occurred, leading emergency workers to take protective actions earlier than actually necessary.
15.
In addition to the CDV-742's, PP&L's dose assessment and evaluation system would be available to provide accurate and timely dose information to emergency workers.
This constitutes an important compensatory measure.
16.
PP&L uses several methods to provide quick and accurate estimates of off-site doses in the event of an accident.
Off-site doses would be calculated by one of three methods.
Total accumulated doses are updated every 15 minutes for a variety of locations.
Field measurements will be taken, starting at the site boundary, and at various locations within the plume exposure pathway.
Correlation between the field readings and the calculated values provides an accurate assessment of the current dose rate, the integrated dose, and the total projected dose.
The dose assessments are used, in conjunction with other factors, to recommend protective actions.
Dose assessment is also performed by the Commonwealth's Department of Environmental Resources / Bureau of Radiological Protection (DER /BRP).
17.
The three dose calculation methodologies are detailed in Emergency Plan Implementing Procedure EP-IP-OO9.
The primary calculational method uses the RADDOSE computer code and the plant computer system.
The code uses radioactivity release data from the gaseous effluent monitors at each plant vent and meteorological information from either of the two meteorological towers.
Terminals with access to the RADDOSE program are located i.m the control room, Technical Support Center and Emergency Operations Facility.
RADDOSE allows for both real time analysis and predictions based on postulated changes in plant conditions, meteorology, etc.
Using atmo-spheric transfer and diffusion factors which account for site specific terrain and local climatological effects, RADDOSE can provide data on the plume dimensions and positions, and the location, magnitude, and arrival time of the plume at particu-lar locations.
On demand or on a periodic basis (minimum 10 minute intervals) the program calculates doses for a maximum of 24 distances in each of the 16 meteorological sectors and a maximum of 21 additional specific locations.
RADDOSE also has the ability to calculate the time until the dose at a given location exceeds the given PAG 1evels.
In the event the source release term is unknown, field measurements in dose rates or concentrations of activity from known locations and times can be used as inp.
to RADDOSE to predict the source term and subsequently predict the doses at other off-site locations.
In this mode, RADDOSE can correlate field readings with calculated doses for a monitored release.
18.
A backup method to RADDOSE involves the use of portable minicomputers (SHARP PC 1211) with the MET 1 or MET 2 computer programs.
MET 1 and MET 2 calculate the centerline, whole body and thyroid dose rates.
Using atmospheric diffusion data based on stability class, the MET 1 program provides data on the location, magnitude, and arrival time of the plume at appropriate locations.
The MET 2 program, like RADDOSE, uses field monitoring data to calculate noble gas or iodine source terms in the event of en unmonitored release or to verify dose calculations for a monitored release.
Due to the inability to compensate for site specific terrain features and local climatological effects, the minicomputers are generally not used for dose calculations beyond 1.5 miles from the plant for very stable meteorological conditions.
19.
The third dose calculation method is a manual method using prepared dose isopleth overlays.
The overlays use predetermined values for wind speed, gamma energy, release rate, breathing rate, and dose conversion factor.
Correction factors can be applied to the normalized values to reflect the characteristics of the actual release.
The appropriate isopleth is overlaid on the map of the 10 mile EPZ to portray the plume and its direction of travel.
The overlay method can be used to calculate whole body and thyroid dose rates at any
_g.
1
i 1
location beyond 1.5 miles from the facility.
Overlays which reflect terrain effects are available where meteorological a
]
conditions warrant.
Like RADDOSE and MET 2, the overlay method l
can backcalculate a source term from field data.
20.
To verify the calculated doses, PP&L has available i
off-site emergency monitoring teams.
In the event of an f
accident, at least 5 (and up to lO) monitoring teams are dispatched.
At the present, 35 team members have been fully l
trained.
Each two-member team is equipped with an Eberline RO2
)
dose rate meter, a Ludlum 2218 Dual Channel Analyzer, and a 4
}
low-volume air sampler.
The team is provided with a four-wheel j
l drive vehicle and is in direct radic contact with the TSC or i
EOF.
Each team would generally make dose rate measurements j
every 20 minutes, but whole body dose rate measurements can be j
made continuously.
All off-site monitoring data is recorded in j
either the TSC or EOF and used to verify the dose calculations.
i Should a difference occur, the monitoring data is used to generate a new source term.
t 21.
Dose information and field monitoring data can be transmitted over a reliable communication system.
The system
]
I is described in the Commonwealth's emergency plan (Annex E, ii Appendix 6) and the Luzerne and Columbia County plans (Annexes B, E and F).
I 22.
Dose information (current dose rate, integrated 4
doses, and projected doses) is transmitted by PP&L to DER /BRP j l i
)
0
every 30 minutes, with more frequent updates as necessary.
This communications link uses a dedicated, hard-wired telephone
" hotline" with a backup radio system through the counties.
The communications from DER /BRP would then go to PEMA via dedica-ted, hard-wired telephone "hotlines", also with a backup radio link.
From PEMA, dose information would be communicated to Luzerne and Columbia counties, also using dedicated "hotlines".
Backup methods to this communications link include dedicated teletype circuits, Radio Amateur Civil Emergency Services
(" RACES"), and commercial telephone.
(If necessary, PP&L can communicate directly with the counties through hotlines and backup radio systems.)
Communications to municipalities would be by commercial telephone and the RACES network.
23.
Communication to emergency workers would typically be from the counties.
(Berwick fire, police and ambulance personnel are normally controlled by the Berwick EOC, but can be monitored and controlled by Columbia County.)
Both Columbia and Luzerne have a Communications Center Radio Network com-prised of the police, fire and ambulance radio networks.
Emergency workers as defined in the county and municipal plans are predominantly fire, police and ambulance personnel and would thus be on the radio network.
Volunteers or auxiliary police in rural areas typically have CB radios or police vehicle monitors patrolling the area with the ability of rapid dissemination of information.
CB messages can be dispatched and monitored by the county communications centers as well as by RACES operators.
24.
The dedicated telephone portion of the system is tested monthly.
The police, fire and ambulance radio networks are in normal 24-hour-a-day operation, and RACES capability is on normal operational standby and is tested at least annually.
The communications system was tested in the March 1982 full-scale emergency drill and functioned properly.
25.
With this communications system, dose information needed to protect the health and safety of emergency workers can be rapidly and reliably communicated to those workers should the need arise.
. l
-.... =-.- -,_..-
9 20.
- 31nce P t >r. t.
- r 4 s t or ser ra re r><
ssmen t s.y se t ora i n v.et v,r t tee p e J. e; r s eien of future esser.. rs ea rs we 11 esrs the a nc.= r t a i n me n t or ;>rteir elo ses. the tv a n sa er s l is t t e>
n d v ira c eme r;;o n e t y wes t k e. c ra 1 *.t ri r; before t es t r-i t s e r s ee r; m o i s l ei ronch the I n - L'O reem restitie.
- .! 7.
T h er r e.* f o r e, notwithstanding the a t ie.ter ni c er of TLO's and Cf s t* - 7 0 0 ' :s for th-inturim pee r l eart. nderq u a t e dor.imotry e x t.s t s.4 to 3,s o t ere t the health and r.a r e
- t. y ea r. mo r s t e_ ric y wo r ko r r..
.) },
9
'.',}
(
f (,* <.
I A.-
J~w
,) :1f1TiLie iCP.(U Te C
4.
C.,; t n to
-*'t'l
- J' ate sc r i tee d tier r e n c e,
- m.. this Uth etn y oi s r p t e. mt.us r.
1980.
7( _. 1,, ~ G.
l,
!1 b
Steven E. Cantone Education Bachelor of Engineering -- Stevens Institute of Technology (1963)
Experience 1979-present -- Pennsylvania Power & Light Company, Manager-Nuclear Support.
Responsible for radiological and environmental services, operational and maintenance support services, and project management of Susquehanna retrofit program.
Radiological and environmental services respon-sibilities include off-site dose projections, environmental monitoring and emergency planning activities.
1976-1979 -- Power Authority of the State of New York, Superintendent of Power.
Responsible for the functional operation of the Indian Point III Nuclear Power Plant, a
3,025 MWt pressurized water reactor plant, through direction of all operations, maintenance, instrumentation and controls, health physics, chemistry, site engineering and regulatory reporting activities.
Emergency planning, outage management and development and implementation of material procurement and budgetary controls were also responsibilities of this position.
1963-1976 -- Consolidated Edison Company of New York.
Positions of increasing responsibility starting from cadet engineer and ending with chief operations engineer of the Indian Point Nuclear Power Station.
Responsibilities traversed the following functional areas:
operator training, refuell'ng supervision, power plant performance, procedure preparation, emergency planning, system chemistry and power plant operations.
Professional Credits American Nuclear Society Atomic Industrial Forum - Operations and Maintenance Committee Electric Power Research Institute - Engineering and Operations Task Force (1979-1980)
Electric Power Research Institute - Nuclear Division Committee (1981-
)
Licensed as an NRC Senior Reactor Operator on three different commercial nuclear power plants.
Chairman of the Susquehanna Review Committee (Of f-site Nuclear Safety Com=ittee)
EKHtBir A
aF
[ Fed ~eral Emergency Management Agency g
Wmbington, D.C. 20472.
T.
AUG 21 1982
!EMORANDUM FOR:.
Walter P Pierson.
Chief Natural and Technological Hazards Division Reai III (Philadel hia)
I FROHr o
I-Assistant Associate Director i
- 0ffice of Natural and Technological Hazards
SUBJECT:
Request. by the Commonwealth of Pennsylvania for Radiological Emergency. Preparedness (REP) Dosimetry Equipment Assistance and. Guidance art FEMA-REP-Z~
This is in reply to your memorandum, subject as above i
I Fedir~ il Eme~r'g5ncy Manag'emeiltFAge'ncy'(FEMA) Headquarters? recoghizef the 'aiiute."'
shortage of' CDV-73Dfddsiisetir~stiisaCnumberIoff thelStates'.'for use in. supporting!
thi REP programL*' Based;upon;;aCr'ecEnts BU' WyJof air. States. by_the Emergener r
Manageme6t"P.rograms Office,." theredare n6:known'~ surplus"tCDV-730'.r in.any" Stat & Alsc g FEMA. has.norplansFt6i procure-; additional _ quantities fort either. Civil;DefensetorAEPc It. is important. to. note-that theECDV -742~dosiiidteE'iErecoiissn'ded' fod.Tised -
e IriT5ohjunctiori Giithf the'CD.V.EZ30Ldoalifietafsrin' order-talprovide^a 'redun'danR self-iidifi@c's'datiilitE'*gaFYdea65tii'reacf-c~ut mnn-extenrHno'above-the"
_ emergency-worker PAG.'af for whole ibodvacamma. radiation-exoosurei The CDV-7428 dosimeter. can be-substituted for-the CDV-7)U dosimeter..where_there.arey sh6ftages1 The-primary advantage of the CDV2730 dosimeter is that a more-accurate reading can be made. for low. exposures.
However, if,the dosime.tet is assigred.;to an indiyidual. and remains with_hir_.throughout.the duration:of thi emergency', then the_CDV-742. is adequateifor a self reading ~^dosimetriFdevics.
We not.: that the State of Pennsylvania has an inventory of 112,872 CDV-742.
dosimeters.
The quantity in the State appears to be more than sufficient so.
that the number requi' ed to meet the REP requirements should. be available within r
tha State..
In developing radiation measurement and dosimetry systems,. FEMA 2 REP'.Y guidance-encouraged States to use-existing instrumentation and resources wherever-possible. This. document also indicate'd that-thEdigfer~radiatidn%Isv~els!1ireFof' m5re' concern?. Th'eref6r6fcthis use af twoCDV :742.'s,tif_necess'ary7ilsf a very logicaircho. ice;to;pr'olidesinstrumentation;fgrlhe potentially.. higher. exposures.e tEt ~ emergency'~w5~rker s*cddfd possible. accrues. However, the CDV--742, can..be-accurat ely read in the-Jdose range far belowJ the-maxirum emergency.. worker PAGj FEMA Headquarters concurs with the Regional position that self reading dosimetry devices should be distributed, at least to county and or local levels.
This.is considered essential so that rapid final distribution to individual emergency workers can be made in a timely manner.
1 frmBn~ B
--m Thermo h= i nescent' & -i== tsisT(TLD). 6eMiihdTwili 'tiot'.%. mad =. swallablef
~
by~ FDM roc :StatFarid'IR~tisiep The Integwy Taekrocce on Orraite Emergency Instrument =Hms for Nuclear Incidents, in ewrdng the requiz.-.ts for domi==try, z w_
_..d a.TLD system over other messesrement syntame such me i
film badg% rar ar+=4nistrative ' -
7 ' d i r= of each individuals exposure ts.
)
r=did4 = =.
Film hadry. M f = 4wra may serve as a substitute for thermo1=(===-wd.
dosimeters, a==nming film badge services is=-h=ff ng calibratisse and reading enn be satisractorily provided.
TWielfliending Wi-t'ers~wer's J+._. W mo' that indiv i dE=IF~could ' keep'I tFack',~'oCa"cu r rent'. h== i s,': ~as*~ their ' rsdiation exposure.~wea'"bEif@~~riciised7 The disca-=ian regarding the need for non-self--
~
reading devices for h--et=* 4r=t in found on pages 5-8 and 5-9 of FOUWtEP-2.
The.ETLD~pE'rzarient i.n.9td-devices _wersh_
_.-M on page_7--5_ma the' pireferab1m' means :forTiiip5isure* TJdrW3=~~~ ~, tat 1En' Jar!.all"seeiv.- y.worksra41 TD4 still connide~rii~thliira. highly; desirable _ W srC~mnd'wili continue ts' 2---a cW1E.*
Although the FD%-REP-2 '--x :rJ. dated Septueuzer 1980 entitled, "cnidance on of fsite Ewry.cy Radi=f ir=s W=.-..t Systems, Phase I, Airborne Release" is being conshfared for revimire, primarily-in terms of updating available information regarding plume airborne r=rticiadia= montoring' methods, this dec 4
is considered to be FDM guidance ist the area of personnel dami==try.
.a In====ry we wish te emph==4= that it is. net-FDM ~ polity to: procure.snd grant emeb-2y instrUiisifaden tifEhi Stistes roeTbso1in REP. Howeveri durre InstrumeW-J tation niets for^civilTderanse:purg:::dpit may be used ~alse. for REP.~ providiruf ita-avmi1=hiliey( for Civii..Dereinee;ia not.. adversely af fected.
'" ~ '
.T ' ~~ ?
.