ML20065A938

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Aug 1982
ML20065A938
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 09/07/1982
From: Roman T
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML20065A931 List:
References
NUDOCS 8209140180
Download: ML20065A938 (4)


Text

,. _

i O

NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT NUCLEAR STATION UNIT #1 NARRATIVE OF OPERATING EXPERIENCE August 1982 The Station operated during the month of August 1982 with a monthly availability factor of 0.0?6 and a net design electrical capacity factor of 0.0%.

The Station was shut down March 19, 1982, for a scheduled maintenance outage. The Station remains shut down due to Reactor Recirculation system piping cracks found during Vessel Hydro on March 23, 1982.

CLASS I WORK - MAINTENANCE - AUGUST 1982 WR #17937 - Changed #13 RRP cover. gasket - 8/1/82 WR #17929 - Changed #15 RRP cover gasket - 8/5/82 WR #17068 - Replaced cover gasket on #11 Shutdown Cooling heat exchanger -

8/4/82 WR #18234 - Found 1 leaking tube in after cooler on #12 Instrument Air Compresser - plugged and put back in service - 8/10/82 WR #17225 - Opened, c1 caned and replaced flex gaskets; reset stroke of Valve #39-05 Emergency Condenser Condensate return - 8/20/82 WR #17214 - Opened, cicaned and replaced flex gaskets; reset stroke of valve #39-06 Emergency Condenser Condensate return - 8/20/82 WR #15849 - Replaced pipe plug on Valve #39-06 Emergency Condenser Condensate return - 8/20/82 CLASS I WORK - INSTRUMENTATION-AND CONTROL - AUGUST 1982 WR #18215 - #141 MG Set volt / amps fluctuating.

Replaced cap. 6 transistor on volt. reg. board.

CLASS I WORK - ELECTRICAL - AUGUST 1982 MO #2151 - Mark I Containment - new Torus Temp. monitoring N1-b1ST-M1 - 125 VDC Batteries, cell specific gravities and battery voltage WR #18348 - Repaired Fire Barrier Penetration No. 1-602.

8209140180 820910

~

gDRADOCK 05000220 PDR

UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO.

S0-220 UNITNANIE Unit al DATE 9/7/82 m/

REPORT MONTil August 1982 COSfPLETED IlY _ TW Roman Vef--wo TELEPilONE (3151343-211'o

~

X1383 g

c

.'5 sa :

5

.= _e E

E

~2 5 'A Licensee c r, o

Cause & Corrective c

N,o.

Date g

3g g

.3 g 5 Event

?

j'3 Action to 5

jisg Report 8r iNG Psevent Recurrence 6

8206 820323 F

744 A

4 82-009 Replacement of recire. piping continue:

core off loaded to SFP.

Total 3825 I

2 3

4 F: Forced Reason:

Method:

Exhibit C. instructions S: Scheduled A Equipment Failur (Explain) 1 Manual for Preparation of Data Il Maintenan:e or' Test 2 Manual Serarn-Entry Sheets for Licensee C Refueling 3 Autumatic Scrain.

Event Report (LER) File (NUREG-D Regulatory Rettriction 4 Other (Explain) 0161)

E-Operator Training & liccuse Examination F-Administrative 4

5 G Operational Er or (Es p! sin) el/77)

Il-Other (Explain)

Exhibit I Same Sourec

.I i

YER SCE D AILY L'Ngy.P0htli LEVEL DOCK ET.$0.

50-220 UNIT 9 Mile #1 DATE 9/7/82 COMPLETED BY Tw nnm.in

(.g TELEPfl0NE _(315)'343-2110 X1383 AIONTH August.1982.

DAY AVERAGE DAILY POWER LEVEL.

DAY (MWe-Net)

AVER ACE DAILY POWFR LEVEL (MWe Net) 1 0

17 0

0 18 0

3 0

0 19 l

4 0

0 20 S

0 0

21 6

0 0

22 7

0 0

23 8

0 0

2a 9

0 25 0

10 0

0 26 II O

27 0

12

'0 0

2S 13 0

0 29 14 0

0 30 iS

'O 0

31 16 0

INSTRUCTIONS On this format. inst the aseraec dail' the nearest whole me,eswaii,'

"" E"*#' I#'CI "' MWe Net tair ca.:h day in slig re;,,,,in,p n,,,,,,,,, g.,,

er

('7 /77 1

L

OPERATING DATA REPORT DOCKET NO. 50-220 DATE _9/7/82 g

COMPLETED BY TW Roman b 3 %

TELEPilONE m -7110 X13 3 OPER \\ TING STATUS

1. Unit Name:

Nino Mile Point Unit #1 Notes

2. Reporting Period:

08/01/82 to 08/31/82

3. Licensed Thenna! Pow er (SIWr):

1850 640

4. Nameplate Ratin;(Gross 5!We):

- 5. Design Electrical Rating (Net MWe):

6. Maximum Dependable Capacity (Gross MWe):

630

7. Maximum Dependable Capacity (Net MWe): -

610 S. If Changes Occur in Capacity Ratings (1: ems Number 3 Through 7) Since Last Report. Give Reasons:

9. Power Lese! To Which Restricted,if Any(Net MWe):
10. Reasons For Restrictions. If Any:

This Month Yr..to Date

- Cumulatisc

11. Ilours In Reportin; Period 744.0 5831.0 112.487.0
12. Number OfIlours Reactor Was Critica!

0.0 1874.0 81,308.5

13. Reactor Resene Shutdown llours 0.0 0.0 1,204.2
14. liours Generatur On Line 0.0 1872.5 78,562.3
15. Unit Resene Shutdown Ifours 0.0 U.U 20.4
16. Gross Thermal Energy Generated (MWil) 0 3,421,093 129,374,390
17. Grow Electrical Ener;c Generated fMWil) 0 IS Net Electrical Ener;3 (,enerated (MWHJ 0

, 1,169,791 42,743,090 1,134,758 41,392,651

19. Unit Seruce I:c:c:

0.0 32.1 69.5

20. Unit At:!hE': - F::...

0.0 32.1 69.8

21. Unit Ca; J:3 T;;... (Usin; MDC Net )

0.0 31.9 60.3

22. Unit Capacity Factor (Using DER Net) 0.0 31.4 59.4
23. Unit Forced Outa;e Rate 100.0 67.1 12.1
24. Shutdowns Scheduled Oser Ne.st 6 Months tType. Date.as.d Dur.:tiaa of Eachl:
25. If Shut Down X: End Of Report Period. Estnnated Date of Startup:

hfarch 1983

26. Units in Test Status (Prior to Commercial Opeution F Forecast Achiesed INITIAL CRITICALITY INITIAL ELECTRICITY CO\\lM ERCi t t. OPER A TION D

Vai7:1