Responds to IE Bulletin 82-04, Deficiencies in Primary Containment Electrical Penetration Assemblies. No Bunker-Ramo Penetration Assemblies Installed or Planned for Use at Facility
ML20065A844
Person / Time
Site: Fort Calhoun 
Issue date: 01/12/1983
From: William Jones
OMAHA PUBLIC POWER DISTRICT
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
REF-SSINS-6820 IEB-82-04, IEB-82-4, LIC-83-007, LIC-83-7, NUDOCS 8302220221
Download: ML20065A844 (2)


Text

e = %

Omaha Public Power District 1623 HARNEY a OMAHA. NEBRASKA 68102 m TELEPHONE S36 4000 AREA CODE 402 January 12, 1983 LIC-83-007 9

@i Mr. J. T. Collins f

JAN Ii N Regional Administrator 1

I U. S. Nuclear Regulatory Commission Region IV u

611 Ryan Plaza Drive, Suite 1000 Y>

Arlington, Texas 76011

Reference:

Docket No. 50-285

Dear Mr. Collins:

Bunker Ramo Primary Containment Electrical Penetration Assemblies IE Bulletin 82-04, dated December 3,1982, identified potential defi-ciencies affecting safety in the subject penetration assemblies and requested specific actions be taken by licensees utilizing these as-semblies in their power plants. The District recently completed a review to identify all penetration assemblies presently installed at the Fort Calhoun Station (FCS) and also reviewed all outstanding modifi-cation packages for possible purchase and use of Bunker Ramo assemblies in the future. The District has determined as a result of this review that no Bunker Ramo Company penetration assemblies are installed or presently planned for use at the FCS. Therefore, no further action is required by the District in accordance with Item Sa of the subject bulletin.

l IE Bulletin 82-04 also requested that an estimate of the District's time spent in preparing this written response be provided.

The District utilized approximately ten (10) manhours in review for and preparation l

I of this response.

0302220221 830112 gDRADOCK05000 W. C.

lones Divisi n Manager Production Operations WCJ/TLP:jmm cc:

U. S. Nuclear Regulatory Commission

/p//

Document Control Desk

/ L-Washington, D.C.

20555 LeBoeuf, Lamb, Leiby & MacRae l

1333 New Hampshire Avenue, N.W.

Washington, D.C.

20036

,a UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of

)

)

Omaha Public Power District

)

Docket No. 50-285 (Fort Calhoun Station,

)

Unit No. 1)

)

AFFIDAVIT

..... being duly sworn, hereby deposes and says that he is Division Manager - Production Operations of Omaha Public Power District; that he is duly authorized to sign and file with the Nuclear Regulatory Com-mission the attached response to IE Bulletin 82-04; that he is familiar with the content thereof; and that the matters set forth therein are true and correct to the best of his knowledge, information and belief.

l f

W. C. Jones Divisiori Manager Product' ion Operations STATE OF NEBRASKA)

) ss COUNTY OF COUGLAS)

Subscribed and sworn to before me, a Notary Public in and for the State of Nebraske, on this

/2 re/

day of January, 1983.

rt s i m,

Notary Public J.T.GWASON g

Mr out toJ4m, tags