ML20064N974

From kanterella
Jump to navigation Jump to search
Forwards Calculational Methodology for Equipment Qualification Radiation Dose, Per 830131 Telcon
ML20064N974
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 02/14/1983
From: Tucker H
DUKE POWER CO.
To: Adensam E, Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20064N977 List:
References
NUDOCS 8302170042
Download: ML20064N974 (1)


Text

p e

DUKE POWER Go>nwxy P.O.HOx 33189 CIIAHLOTTE. N.G. 28242 HALB. TUCKER TELEPHOME vum r.rsment (704) 373-4331

.wm. r m -

February 14, 1983 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Ms. E. G. Adensam, Chief Licensing Branch No. 4 Re: McGuire Nuclear Station Docket Nos. 50-369, 50-370

Dear Mr. Denton:

Attached is a document describing the methodology for calculating radiation dose rates for equipment qualification purposes. This information was requested in a telecon uith Mr. Larry Bell, NRC/NRR, on January 31, 1983.

Please advise if there are additional questions regarding this matter.

Very truly yours, f f YLW W Hal B. Tucker [

GAC/php Attachment b gg cc: Mr. W. T. Orders NRC Resident Inspector McGuire nuclear Station Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 8302170042 830214 PDR ADOCK 05000369 P PDR

-. _ -