Monthly Operating Rept for Jan 1983
ML20064N488
Person / Time
Site: Palisades Entergy icon.png
Issue date: 02/01/1983
From: Peterson D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML20064N475 List:
References
NUDOCS 8302160252
Download: ML20064N488 (4)


Text

'

OPERATING DATA REPORT DOCKET NO 50-255 DATE 2-1-03 COMPLETED BY DAPeterson TELEPHONE (616)T64-8913 OPERATING STATUS Notes 1.

Unit Name:

Palisades 2.

Reporting Period:

830101-830131 3.

Licensed Thermal Power (MWt):

2530 4.

Nameplate Rating (Gross MWe):

811.7 5.

Design Electrical Rating (Net MWe):

805 6.

Maximum Dependable Capacity (Gross MWe):

  • 675 7.

Maximum Dependable Capacity (Net MWe):

  • 635 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level To Which Restricted, If Any (Net MWe):

10.

Reasons For Restrictions, If Any:

This Month Yr-to-Date Cumulative 11.

Hours In Reporting Period 744 744 97,479 12.

Number Of Hours Reactor Was Critical 725 1 725.1 54,648.1 13.

Reactor Reserve Shutdown Hours 14.

Hours Generator On-Line 712.9 712.9 51,707.8 15.

Unit Reserve Shutdown Hours 16.

Gross Thermal Energy Generated (MWH) 1.7h2,448 1,742,448 104,379,240 17.

Gross Electrical Energy Generated (MWH) 553,520 553,520 32,323,440 18.

Net Electrical Energy Generated (MWH) 525.254 525,254 30,383,310 19.

Unit Service Factor 95.8 95.8 53.0 20.

Unit Availability Factor 95.8 95.8 55.0 l

21.

Unit Capacity Factor (Using MDC Net) 111.2 111.2 49.1,_

22.

Unit Capacity Factor (Using DER Net) 87.7 87.7 38.7 23.

Unit Forced Outage Rate 4.2 4.2 34.3 24.

Shutdowns Scheduled Over Next Six Months (Type, Date and Duration of Each):

25.

If Shut Down At End Of Report Period, Estimated Date of Startup:

26.

Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 8302160252 830204 PDR ADOCK 05000255 R

PDR anasea on condenser backpressure.

rp0882-0032a-93

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-255 Palisades UNIT DATE P 2 83 1

CONIPLETED BY DAPeterson _

(616)'(64-8913 6

TELEPHONE e

510NTli January 1983 DAY AVER AGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(We-Net) 749 17 Th2 751 2

18 740 752 740 3

[9 745 738 4

20 751 s

21 Th8

+

751 755 6

22 739 754 23 758 753 s

24 753 750 9

25 749 to 123

'r

~

yg 11 752 130 27 739 683 12 28 740 75h g3 29 729 755 r4 30 748 IS5 13 31 Tk6 16 l

INSTRUcTroNs t i' n ar' t

$1 ine a.

""" P"" I"'I IG lWe Net for eacS day in the reportin.; month. Cornpute to

\\

(9/77) imum

UNIT SilU1 DOWNS AND POWER REDUCTIONS DOCKET NO.

50-255 UNIT NAME Palisades DATE 9 9 87 REPORT MONTil January 1983 COMPLETED BY DVnnnenBern TELEPHONE

( 61 6) 76h_8013 "i

.5 E "h

Yk Licensec

,E t, Cause & Corrective h ".

No.

Date g

3g g

,g 5

Event 3?

Action to

$E j di Report e

$0 j

Prevent Recurrence i

1 830126 F

31.1 A

3 Turbine Generator Controls.

/

4 1

le 2

3 4

F: Forced Reason:

Method:

Exhibit G -Instructions S: Scheduled A Equipnient Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C-Refueling 3 Automatic Scram.

Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other ( Explain) 0161)

E-Operator Training & License Examination F Administrative 5

G-Operational Error (Explain) p8/77) 11-O her (Explain) '

Exhibit I-Same Source

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH OF JANUARY 1983 The Plant ran at essentially 100 percent rated power until January 26, when the

"'urbine Generator Control System malfunctioned and tripped the Plant. The Unit was back on line January 27 and operation continued through the end of the month.