Deficiency Rept Re GE Switchgear Parts Not Certified by Subsuppliers for Nuclear Use.Final Rept Delayed Until 821025 Due to Extensive Investigation & Evaluation Required
ML20064N167
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 08/25/1982
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-21673-GHD, DER-82-8, NUDOCS 8209080247
Download: ML20064N167 (2)


Text

____

Docket nos. 59-528/529/530 033 l, ?n 50'. 55 (e) Report h

's x

N;,fra NM NMM M

,t.

3003 P.O. box 21666 PHOENIX, ARIZONA 85036.,

7y STA.

August 25, 1982 "4 '-

ANPP-21673-GHD/BSK U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention:

Mr. T. W.

Bishop, Chief Reactor Construction Projects Branch

Subject:

Time Extension for Report - DER 82-8 A 50.55(e) Potentially Reportable Deficiency Relating to G. E. Switchgear Has Parts Not Certified by Subsuppliers for Nuclear Use.

File: 82-019-026 D.4.33.2

Reference:

(A) Telephone Conversation between T. Bishop and G. Duckworth on March 11, 1982 (B) ANPP-20651, dated April 7, 1982 (Interim Report)

(C) ANPP-21254, dated June 22, 1982 (Extension)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A). An Interim Report was transmitted by Reference (B), and a time extension was requested by Reference (C). At that time, it was estimated that a Final Report would be available by August 25, 1982.

Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by October 25, 1982, when a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

I Very truly yours A

'c:\\cu M nc c.

E. E. Van Brunt, Jr.

APS Vice President Nuclear Projects ANPP Project Director EEVBJr/GHD:db cc:

See Attached Page 2 I67 i C c' 8209000247 820025 PDR ADOCK 05000528 S

PDR

9k'~

U. S. Nuclear Regulatory Commission August :25, 1982

-Attention:

Mr. T. W. Bishop, Chief ANPP-21673-GHD/BSK Page 2 cc: Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear _ Regulatory Commission Washington, D. C. 20555 t

i T. G. Woods, Jr.

J. A. Roedel D. B. Fasnacht G. C. Andognini A. C. Rogers B. S. Kaplan W. E. Ide J. Vorces J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patter, son R. W. Welcher R. M. Grant

~ - ~ -

D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli Lynne Bernabei, Esq.

Harmon & Weiss 1725 "I" Street, NW '

Suite 506 Washington, D. C. 20006 R. L. Greenfield Assistant Attorney General 4

Bataan Memorial Building Santa Fe, New Mexico 87503 i