APPENDIX B AVERAGE DAILY POWER LEVEL DOCKET NO. 050-0325 UNIT BRUNSWICK UNIT 1 DATE 02/01/83 COMPLETED BY FRANCES HARRISON TELEPHONE 919-457-9521 JANUARY 83 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET)
(MWE-NET) 1-
-5.
17
-5.
2
-5.
18
-5.
3
-5.
19
-6.
4
-6.
20
-6.
5
-5.
21
-5.
6
-5.
22
-5.
7
-5.
23
-6.
8
-5.
24
-5.
9
-5.
25
-6.
10
-5.
26
-6.
11
-5.
27
-6.
12
-5.
28
-5.
13
-5.
29
-5.
14
-5.
30
-5.
15
-6.
31
-5.
16
-6.
1.16 - 8 8302150650 830204 PDR ADOCK 05000324 R
OPERATING DATA REPORT DOCKET NO. 050-0325 DATE 02/01/83 COMPLETED BY FRANCES HARRISON TELECHONE 919-457-9521 OPERATING STATUS
- 1. UNIT NAME: BRUNSWICK UNIT 1 I NOTES I
- 2. REPORTING PERIOD: JANUARY 83 I
I
- 3. LICENSED THERMAL POWER (MWT): 2436 I
I
- 4. HAMEPLATE RATING (GROSS MWE): 867.0 I
I
- 5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 I
I
- 6. MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 I I
- 7. MAX DEPENDABLE CAPACITY (NET MWE): 790.0 8.
IF CEANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7)'SINCE LAST REPORT, GIVE REASONS;
- 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): NONE
- 10. REASONS FOR RESTRICTION IF ANY:
THIS YR TO CUMUL MONTH DATE ATIVE
- 11. HOURS IN REPORTING PERIOD 744.0 744.0 51505.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 0.0 33888.5
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1647.1
- 14. HOURF GENERATOR ON LINE 0.0 0.0 31970.0
- 15. UNIT RE9ERVE SHUTDOWN FOURS 0.0 0.0 0.0
- 16. GROS 5 THEPMAL ENERGY GENERATED (MWH) 0.0 0.0 63896014.3
- 17. GROSE ELECTRICAL ENERGY GENERATED (MWH) 0,0 0.0 21062188.0
- 18. NET ELECTRICIAL ENERGY GENERATED (MWH)
-3996.0
-3996.0 20221123.0
- 19. UNIT SERVICE FACTOR 0.0 0.0 62.1
- 20. UNIT AVAILABILITY FACTOR 0.0 0.0 62.1
- 21. UNIT CAPACITY FACTOR (USING MDC NET)
-0.7
-0.7 49.7
- 22. UNIT CAPACITY FACTOR "' SING DER NET)
-0.7
-0.7 47.8
- 23. UNIT FORCED OUTAGE R/RE 0.0 0.0 24.1
- 24. SHUTDOWNS SCHEDULED OVFF NEYT 6 MONTHS (TYPEr DATER AND DURATION OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIODr ESTINATED DATE OF START UP:
5/13/83
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERICIAL OPERATION): FORCAST ACHEIVED INITIAL CRITICALITY INITIAL ELECTRICITY CCMMERICIAL OPERATION 1.16 - 9
i APPENDIX DOCKET NO.: 050-325 UNIT: _ Brunswick No. 1 DATE: February 1983 COMPLETED BY: Frances Harrison i
OPERATIONS
SUMMARY
BRUNSWICK UNIT NO. 1 i
j 3runswick Unit No. I was shut down the entire month of January for a refueling / maintenance outage.
4
[
There are 948 *BWR and 160 PWR spent fuel bundles in the Brunswick No. 1 fuel pool.
- 472 bundles have been moved to spent fuel during refueling; of these, 160 will remain in the pool when the care is reloaded.
1 i
1 1
(
{
D D
D 050-0:-
UNIT SilUTDOWNS AND POWER REDUCTIONS
- Bruns,
,k I DOCKET NO.
UNIT NAME
/
DATE M ennr 19m
/
COMPLETED BY Frances' Harrison January 1983 TELEPilONE (919) 457-9521 REPORT MONT11 "L
jg 3
j Licensee
,E g c4 Cause & Corrective No.
Dare g
3s
,g y /!
Event p
g"g Action to H
g "d jg Report
- mo Prevent Recurrence g
Y t~
83-116 8212,11 S
744 C
4 NA RC FUELXX REFUELI:;C OUTAGE S
t l
i 2
3 3
4 F: Forced Reason:
Method:
Exhibit G-Instructions I Manual for Preparation of Data S: Scheduled A-Equipment Failure (Explain) 2 Manual Scram.
Entry Sheets for Liecusee B Maintenance of Test C Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 4 Continuations 0161)
E-Operator Training & License Examina:lon,
5-Load Reductions I
F-Administrative 6-Other G-Operational Error (Explain)
Exhibit I Same Source (9/77) li-Other (Explain) i
J APPENDIX j
DOCKET NO.-
050- 0324 i
UNIT: Brunswick No. 2 DATE: February 1983 COMPLETED BY: Frances Harrison OPERATIONS
SUMMARY
BRUNSWICK UNIT NO.-2
.l 4
Brunswick Unit No. 2 operated at 96.0% availability factor for the month of January with a 75.5% capacity. factor. 'There were six power reductions and one
-off-line outage this month.
There are 424 BWR and 144 PWR spent fuel bundles in the Brunswick No. 2 fuel pool.
The corrected. copy of the forced outage rate for December is attached.
t 4
i i
I.
l t
I
. _ -. ~.
OPERATING DATA REPORT DOCKET NO. 050-0324 DATE:01/11/83 COMPLETED BY' FRANCES HARRISON TELEPHONE. 919-457-9521 OPERATING STATUS
- 1. UNIT NAME: BRUNSWICK UNIT 2 I NOTES
-I
- 2. REPORTING PERIOD: DECEMBER 82 I
I-
- 3. LICENSED THERMAL-POWER (MWT): 2436 I
I,
- 4. NAMEPLATE RATING (GR059 MWE): 867.0 I-I
- 5. DESIGN ELECTRICAL RATING (NET MWE) : 821.0 I
-I
- 6. MAX DEPENDABLE CAPACITY (GROSS MWE) : - 815.0 I I
- 7. MAX DEPENDABLE CAPACITY (NET MWE): 790.0 8.-IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): NONE
- 10. REASONS FOR RESTRICTION IF ANY:
THIS YR TO CUMUL MONTH DATE ATIVE
- 11. HOURS IN REPORTING PERIOD 744.0 8760.0
'62785.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 633.4 3609.2 38776.1
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 14. HOURS GENERATOR ON LINE 596.2 3381.5 36150.8
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1274129.0 6299441.2 66296978.8
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 433131.0 2022755.0 22016692.0
- 18. NET ELECTRICIAL ENERGY GENERATED ( MWh) 418113.0 1902524.0 21091926.0-
- 19. UNIT SERVICE FACTOR 80.1 38.6 57.6
- 20. UNIT AVAILABILITY FACTOR 80.1 38.6 57.6
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 71.1 27.5 42.5
- 22. UNIT CAPACITY FACTOR (USING DER NET) 68.5 26.5 40.9
- 23. UNIT FORCED OUTAGE RATE 6.4 15.5 16.9
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPEr DATE, AND DURATION OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UF:
0/ O/ O
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERICI AL OPERATION): FORCAST ACHEIVED INITIAL CR.TTICALITY INITIAL ELECTRICITY COMMERICIAL OPERATION 1.16 - 9
i APPENDIX B AVERAGE DAILY POWER LEVEL DOCKET NO. 050-0324 UNIT BRUNSWICK UNIT 2 DATE 02/01/83 COMPLETED BY FRANCES HARRISON TELEPHONE 919-457-9521 JANUARY 83 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY: POWER LEVEL (MWE-NET)
(MWE-NET) 1 778.
17 635.
2 778.
18 629.
3 70.
19 633.
4 107.
20 637.
5 457.
21
- 633, 6
603.
22 628.
7 479.
23 616.
8 590.
24
- 627, 4
9 591.
25 636.
10 591.
26 634.
11 650.
27 608.
12 733.
28 566.
13 793.
29 558.
14 784.
30 583.
15 640.
31 587.
16 636.
1 1.16 - 8 a
.,,n-
OPERATING DATA REPORT DOCKET NO. 050-0324 DATE 02/01/83 COMPLETED BY FRANCES HARRISON TELEPHONE 919-457-9521 OPERATING STATUS
- 1. UNIT NAME: BRUNSWICK UNIT 2 I NOTES I
- 2. REPORTING PERIOD: JANUARY 83 I
I
- 3. LICENSED THERMAL POWER'(MWT): 2436 I
I
- 4. NAMEPLATE RATING (GROSS MWE): 867.0 I
I
- 5. DESIGN ELECTRICAL RATING (NET MWE): 821.6 I
I
- 6. MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 I I
- 7. MAX DEPENDABLE CAPACITY (NET MWE): 790.0 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORTr GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): NONE
- 10. REASONS FOR RESTRICTION IF ANY:
THIS YR TO CUMUL MONTH DATE ATIVE
- 11. HOURS IN REPORTING PERIOD 744.0 744.0 63529.0
- 12. NUdBER OF HOURS REACTOR WAS CRITICAL 721.3 721.3 39497.4
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 14. HOURS GENERATOR ON LINE 713.9 713.9 36864.7
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1352779.7 1352779.7 67649758.5 l
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 458144.0 458144.0 22474836.0
- 18. NET ELECTRICIAL ENERGY GENERATED (MWH) 443687.0 443687.0 21535613.0
- 19. UNIT SERVICE FACTOR 96.0 96.0 50.0
- 20. UNIT AVAILABILITY FACTOR 96.0 96.0 58.0
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 75.5 75.5 42.9 l
- 22. UNIT CAPACITY FACTOR (USING DER NET) 72.6 72.6 44.3
- 23. UNIT FORCED OUTAGE RATE 4.0 4.0 16.7
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATER AND DURATION OF EACH):
DUAL OUTAGE 3/28/83 THREE - FOUR WEEKS l
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
0/ O/ 0
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERICIAL OPERATION): FORCAST ACHEIVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERICIAL OPERATION 1.16 - 9
UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0324 UNIT NAME Brunswick 11 DATE _Feb. 1983 REPORT MONTil Jan. 1983 COMPLETED BY Frnnres Ifarrison TELEP!iONE 414-A ;7-o s ? 1 E
E 5E 3
$.E 2 Licensee
,E%
E%
Cause & Corrective No.
Date g
3g i
jg5 Event
?
n3 Action to O
$sE 5
3 ig F Report #
EU
!O Prevent Recurrence g
u e
o s83-002 830103 F
30.1 A
3 NA U
Rx Scram - Running PT-2.1.22 in con-junction with blown fuse on Channel "A" AC - MSIV Logic.
PT-2.1.22 is being revised to verify that solenoids are energized after each section that results in h Group I Isolation (MSIV closure) before the next steop of the periodic tests.
2 I
2 3
4 F: Forced Reason:
Method:
Exhibit G. Instructions S: Scheduled A-Feiuipment Failure (Explain) 1-Manual for Preparation of Data D Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C. Refueling
- 3. Automatic Scram.
Event Report (LER) File (NUREG.
D-Regulatory Restriction l-Continuations 0161)
E-Operator Training & Ucense Examin.ation i
F-Administrative 5-Load Reductions s
G-Operational Error (Explain)
(,-O t he r Exhibit 1. Same Source (9/77) ll Other (Explain)
,n
UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
4 UNIT N AME Brunswick II DATE Foh. 19R1 REPORT MONTil Jan. 1983 COMPLETED BY vran - N'rr4 mn TELEPHONE 010 ^47 0491 e.
E E
.5 ?
3
$Y5 Licensee
,E r, h
Cause & Corrective No.
Date i
3g s
js5 Event gy go3 Action to
$,E 35=
Report #
mU Prevent Recurrence H
o u
e d
83-004 830105 F
.00 B
5 NA CH PUMPXX Removed 2A rx feed pump from service.
Repaired relays A71B-KlB and C72-K6C.
I 2
3 4
F: forced Reason:
Method:
Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1%nual for Preparation of Data B Maintenance or Test 2-Manual Scram.
Er.try Sheets for Licensee l
C-Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 0161)
E-Operator Training & License Examination 4-Continuatlons F Administrative 5-Load Reductions 5
G-Operational Error (Explain) 9-0ther Exhibit I-Same Source 19/77)
Il-Other (Explain)
I i
=
f l
UNIT SHUTDOWNS AND POWER REDUC 110NS DOCKET NO. 050-0324
- l UNIT NAME Brunswick II DATE hh l on REPORT MONTil Jan. 1983 COMPLETED BY Frances Harrison TELEPHONE 919-457-9521 "i
=
es
.5 :o =
5"
.2 e E
,.s X Licensee g *,
c.
Cause & Corrective No.
Date g
3g y
,g g 5 Event t; ?
83 Action to
[3,5 5
j;5g Report #
N0 0
Prevent Recurrence I
6 83-006 830107 p
.0 2
5 NA
. HC HTEXCH Reduced power for waterbox work.
Plugged one tube.
t 2
3 4
F: Forced Reason:
Method:
Exhibit G Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3 Automatic Scram.
Event Report (LER) File GIUREG-D-Regulatory Restriction 0161)
E-Operator Training & License Examination 4-Continuations F Administrative 5-Load Reductions 5
G-Operational Error (Explain) 9-Other Exhibit I.Same Sourec (9/77)
Il-Other (Explain)
UNIT SliUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0324 UNIT NAME Brunswick 11 DATE _Feh. 1983 REPORT MONTil Jan. 1983
-COMPLETED BY Frances Harrison TELEPHONE 919-457-9521 w.
E E
.3 ?
3
$ [$5 Licensee 5 r, Cause & Corrective No.
Date g.
3 Ej j
,$ j $
Event g?
93 Action to H
$5 31 ;5 =
Report #
mV 5U Prevent Recurrence y
v e
6 83-007 830111 F
0 B
5 NA ZZ VALVEX Reduced power to repair valve 2-MD-V5 j
I I
2 3
4 i
F: Forced Reason:
Method:
Exhibit G - Instructions S: Scheduled A Equipment Failure (Explain) 1 -Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee l
C-Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 0161)
E-Operator Training & License Examination 4-Continuations F-Administrative 5-Load Reductions 5
G-Operational Erior (Explain) 9-Othe r Exhibit I-Same Sovree (9/77)
Il-Other(Explain)
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0324 UNIT NAME Brunswick II DATE Feb. 1983 Jan. 1983 COMPLETED BY Frnncon linrrinnn REPORT MONTil TELEP: LONE 014-/A7-4 01 w.
B
~
c
.5 E 3
4.Y 5' Licensee
,E%
Cause & Corrective No.
Date g
g g
.g g 5 Event um o"
Action to
$>E 5 55 ='
Report #
NU
!b Prevent Recurrence H
e-t u
d 83-008 830115 F
0 B
5 NA CH PUMPXX Reduced power due to 2B recirculation pump problems.
2B rm. recirculation pump seals being rebuilt.
2 l
I 2
3 4
F: Forced Reason:
Method:
Exhibit G Instructions S: Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data B Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 0161)
E-Operator Training & License Examination 4-Continuations F-Administrative 5-Load Reductions 5
G-Operational Error (Explain) 9-0ther Exhibit I Same Source (4/77)
Il Other (Explain)
t UNIT SilUTDOWNS AND POWER REDUCTIONS DOCK!:T NO. 050-0324 UNIT NAME Brunswick II DATE hh - 1991 REPORT MONTil Jan. 1983 COMPLETED BY Frances Harrison TELEP!!ONE 919-457-9521 "i
~
5" c
ri 3m e E _e E
3.s a Licensee g't, c.
Cause & Corrective
-o No.
Date g
3g g
,g g 5 Event t; ?
83 Action to
$E 5
j di j Report #
- G ju Prevent Recurrence 5
83-010 830123 F
.0 B
5 NA CII PIRIPXX 2A rx recirculation pump tripped due to 2-B21-N045-C out of calibration.
Recalibrated 2-B21-N045-C.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G-Instructions S: Schedaied A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.
EnI4y Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D. Regulatory Restriction 0161)
E-Operator Training & License Examination 4-Continuations F-Administrative 5-Load Reductions 5
G-Operational Error (Explain) 9-O t he r Exhibit I-Same Source (9/77)
Il-Other (Explain)
050-0324 UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT N AME Brunswick 11 DATE Feb. 1983 REPORT MONTH Jan. 1983 COMPLETED rty Frances Harrison TELEPHONE 919-457-9571 "i
e_
ei 3 -a e S
L 2e E
-3.s M Licensee 5%
8.4 Cause & Corrective c
No.
Date g
g
.g g 5 Event
- ?
3 Action to
$,E j5j Report #
$0 0
Prevent Recurrence 8-83-013 830124 F
0 B
5 NA TXXXXX ZZZZZZ Reduced power from 80% to 75.5% to clear rod block to perform CRD stall flow PT.
i l
I 2
3 4
F: Forced Reason:
Method:
Exhibit G -Instructions S: Scheduled A-Equiprnent Failare(Explain) l-Manual for Preparation of Data B Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C Refueling 3-Automatie Scram.
Event Report (LER) File (NUREG.
D Regulatory Restrictiori 0161)
E-Operator Training & Ucense Examination le-Cont i nua t I on.
F Administrative 5-Load Reductic ins 5
G-Operational Error (Explain) 9-Othe r Exhibit I-Same Source 19/77)
H-Other (Explain)
-