Monthly Operating Repts for Jan 1983
ML20064M809
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 02/01/1983
From: Harrison F
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20064M780 List:
References
NUDOCS 8302150650
Download: ML20064M809 (15)


Text

.;

APPENDIX B AVERAGE DAILY POWER LEVEL DOCKET NO. 050-0325 UNIT BRUNSWICK UNIT 1 DATE 02/01/83 COMPLETED BY FRANCES HARRISON TELEPHONE 919-457-9521 JANUARY 83 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET)

(MWE-NET) 1-

-5.

17

-5.

2

-5.

18

-5.

3

-5.

19

-6.

4

-6.

20

-6.

5

-5.

21

-5.

6

-5.

22

-5.

7

-5.

23

-6.

8

-5.

24

-5.

9

-5.

25

-6.

10

-5.

26

-6.

11

-5.

27

-6.

12

-5.

28

-5.

13

-5.

29

-5.

14

-5.

30

-5.

15

-6.

31

-5.

16

-6.

1.16 - 8 8302150650 830204 PDR ADOCK 05000324 R

PDR

OPERATING DATA REPORT DOCKET NO. 050-0325 DATE 02/01/83 COMPLETED BY FRANCES HARRISON TELECHONE 919-457-9521 OPERATING STATUS

1. UNIT NAME: BRUNSWICK UNIT 1 I NOTES I
2. REPORTING PERIOD: JANUARY 83 I

I

3. LICENSED THERMAL POWER (MWT): 2436 I

I

4. HAMEPLATE RATING (GROSS MWE): 867.0 I

I

5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 I

I

6. MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 I I
7. MAX DEPENDABLE CAPACITY (NET MWE): 790.0 8.

IF CEANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7)'SINCE LAST REPORT, GIVE REASONS;

9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): NONE
10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTING PERIOD 744.0 744.0 51505.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 0.0 33888.5
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1647.1
14. HOURF GENERATOR ON LINE 0.0 0.0 31970.0
15. UNIT RE9ERVE SHUTDOWN FOURS 0.0 0.0 0.0
16. GROS 5 THEPMAL ENERGY GENERATED (MWH) 0.0 0.0 63896014.3
17. GROSE ELECTRICAL ENERGY GENERATED (MWH) 0,0 0.0 21062188.0
18. NET ELECTRICIAL ENERGY GENERATED (MWH)

-3996.0

-3996.0 20221123.0

19. UNIT SERVICE FACTOR 0.0 0.0 62.1
20. UNIT AVAILABILITY FACTOR 0.0 0.0 62.1
21. UNIT CAPACITY FACTOR (USING MDC NET)

-0.7

-0.7 49.7

22. UNIT CAPACITY FACTOR "' SING DER NET)

-0.7

-0.7 47.8

23. UNIT FORCED OUTAGE R/RE 0.0 0.0 24.1
24. SHUTDOWNS SCHEDULED OVFF NEYT 6 MONTHS (TYPEr DATER AND DURATION OF EACH):
25. IF SHUTDOWN AT END OF REPORT PERIODr ESTINATED DATE OF START UP:

5/13/83

26. UNITS IN TEST STATUS (PRIOR TO COMMERICIAL OPERATION): FORCAST ACHEIVED INITIAL CRITICALITY INITIAL ELECTRICITY CCMMERICIAL OPERATION 1.16 - 9

i APPENDIX DOCKET NO.: 050-325 UNIT: _ Brunswick No. 1 DATE: February 1983 COMPLETED BY: Frances Harrison i

OPERATIONS

SUMMARY

BRUNSWICK UNIT NO. 1 i

j 3runswick Unit No. I was shut down the entire month of January for a refueling / maintenance outage.

4

[

There are 948 *BWR and 160 PWR spent fuel bundles in the Brunswick No. 1 fuel pool.

  • 472 bundles have been moved to spent fuel during refueling; of these, 160 will remain in the pool when the care is reloaded.

1 i

1 1

(

{

D D

D 050-0:-

UNIT SilUTDOWNS AND POWER REDUCTIONS

Bruns,

,k I DOCKET NO.

UNIT NAME

/

DATE M ennr 19m

/

COMPLETED BY Frances' Harrison January 1983 TELEPilONE (919) 457-9521 REPORT MONT11 "L

jg 3

j Licensee

,E g c4 Cause & Corrective No.

Dare g

3s

,g y /!

Event p

g"g Action to H

g "d jg Report

  • mo Prevent Recurrence g

Y t~

83-116 8212,11 S

744 C

4 NA RC FUELXX REFUELI:;C OUTAGE S

t l

i 2

3 3

4 F: Forced Reason:

Method:

Exhibit G-Instructions I Manual for Preparation of Data S: Scheduled A-Equipment Failure (Explain) 2 Manual Scram.

Entry Sheets for Liecusee B Maintenance of Test C Refueling 3 Automatic Scram.

Event Report (LER) File (NUREG-D-Regulatory Restriction 4 Continuations 0161)

E-Operator Training & License Examina:lon,

5-Load Reductions I

F-Administrative 6-Other G-Operational Error (Explain)

Exhibit I Same Source (9/77) li-Other (Explain) i

J APPENDIX j

DOCKET NO.-

050- 0324 i

UNIT: Brunswick No. 2 DATE: February 1983 COMPLETED BY: Frances Harrison OPERATIONS

SUMMARY

BRUNSWICK UNIT NO.-2

.l 4

Brunswick Unit No. 2 operated at 96.0% availability factor for the month of January with a 75.5% capacity. factor. 'There were six power reductions and one

-off-line outage this month.

There are 424 BWR and 144 PWR spent fuel bundles in the Brunswick No. 2 fuel pool.

The corrected. copy of the forced outage rate for December is attached.

t 4

i i

I.

l t

I

. _ -. ~.

OPERATING DATA REPORT DOCKET NO. 050-0324 DATE:01/11/83 COMPLETED BY' FRANCES HARRISON TELEPHONE. 919-457-9521 OPERATING STATUS

1. UNIT NAME: BRUNSWICK UNIT 2 I NOTES

-I

2. REPORTING PERIOD: DECEMBER 82 I

I-

3. LICENSED THERMAL-POWER (MWT): 2436 I

I,

4. NAMEPLATE RATING (GR059 MWE): 867.0 I-I
5. DESIGN ELECTRICAL RATING (NET MWE) : 821.0 I

-I

6. MAX DEPENDABLE CAPACITY (GROSS MWE) : - 815.0 I I
7. MAX DEPENDABLE CAPACITY (NET MWE): 790.0 8.-IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): NONE
10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTING PERIOD 744.0 8760.0

'62785.0

12. NUMBER OF HOURS REACTOR WAS CRITICAL 633.4 3609.2 38776.1
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON LINE 596.2 3381.5 36150.8
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1274129.0 6299441.2 66296978.8
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 433131.0 2022755.0 22016692.0
18. NET ELECTRICIAL ENERGY GENERATED ( MWh) 418113.0 1902524.0 21091926.0-
19. UNIT SERVICE FACTOR 80.1 38.6 57.6
20. UNIT AVAILABILITY FACTOR 80.1 38.6 57.6
21. UNIT CAPACITY FACTOR (USING MDC NET) 71.1 27.5 42.5
22. UNIT CAPACITY FACTOR (USING DER NET) 68.5 26.5 40.9
23. UNIT FORCED OUTAGE RATE 6.4 15.5 16.9
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPEr DATE, AND DURATION OF EACH):
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UF:

0/ O/ O

26. UNITS IN TEST STATUS (PRIOR TO COMMERICI AL OPERATION): FORCAST ACHEIVED INITIAL CR.TTICALITY INITIAL ELECTRICITY COMMERICIAL OPERATION 1.16 - 9

i APPENDIX B AVERAGE DAILY POWER LEVEL DOCKET NO. 050-0324 UNIT BRUNSWICK UNIT 2 DATE 02/01/83 COMPLETED BY FRANCES HARRISON TELEPHONE 919-457-9521 JANUARY 83 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY: POWER LEVEL (MWE-NET)

(MWE-NET) 1 778.

17 635.

2 778.

18 629.

3 70.

19 633.

4 107.

20 637.

5 457.

21

633, 6

603.

22 628.

7 479.

23 616.

8 590.

24

627, 4

9 591.

25 636.

10 591.

26 634.

11 650.

27 608.

12 733.

28 566.

13 793.

29 558.

14 784.

30 583.

15 640.

31 587.

16 636.

1 1.16 - 8 a

.,,n-

OPERATING DATA REPORT DOCKET NO. 050-0324 DATE 02/01/83 COMPLETED BY FRANCES HARRISON TELEPHONE 919-457-9521 OPERATING STATUS

1. UNIT NAME: BRUNSWICK UNIT 2 I NOTES I
2. REPORTING PERIOD: JANUARY 83 I

I

3. LICENSED THERMAL POWER'(MWT): 2436 I

I

4. NAMEPLATE RATING (GROSS MWE): 867.0 I

I

5. DESIGN ELECTRICAL RATING (NET MWE): 821.6 I

I

6. MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 I I
7. MAX DEPENDABLE CAPACITY (NET MWE): 790.0 8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORTr GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): NONE
10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTING PERIOD 744.0 744.0 63529.0
12. NUdBER OF HOURS REACTOR WAS CRITICAL 721.3 721.3 39497.4
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON LINE 713.9 713.9 36864.7
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1352779.7 1352779.7 67649758.5 l
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 458144.0 458144.0 22474836.0
18. NET ELECTRICIAL ENERGY GENERATED (MWH) 443687.0 443687.0 21535613.0
19. UNIT SERVICE FACTOR 96.0 96.0 50.0
20. UNIT AVAILABILITY FACTOR 96.0 96.0 58.0
21. UNIT CAPACITY FACTOR (USING MDC NET) 75.5 75.5 42.9 l
22. UNIT CAPACITY FACTOR (USING DER NET) 72.6 72.6 44.3
23. UNIT FORCED OUTAGE RATE 4.0 4.0 16.7
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATER AND DURATION OF EACH):

DUAL OUTAGE 3/28/83 THREE - FOUR WEEKS l

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:

0/ O/ 0

26. UNITS IN TEST STATUS (PRIOR TO COMMERICIAL OPERATION): FORCAST ACHEIVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERICIAL OPERATION 1.16 - 9

UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0324 UNIT NAME Brunswick 11 DATE _Feb. 1983 REPORT MONTil Jan. 1983 COMPLETED BY Frnnres Ifarrison TELEP!iONE 414-A ;7-o s ? 1 E

E 5E 3

$.E 2 Licensee

,E%

E%

Cause & Corrective No.

Date g

3g i

jg5 Event

?

n3 Action to O

$sE 5

3 ig F Report #

EU

!O Prevent Recurrence g

u e

o s83-002 830103 F

30.1 A

3 NA U

Rx Scram - Running PT-2.1.22 in con-junction with blown fuse on Channel "A" AC - MSIV Logic.

PT-2.1.22 is being revised to verify that solenoids are energized after each section that results in h Group I Isolation (MSIV closure) before the next steop of the periodic tests.

2 I

2 3

4 F: Forced Reason:

Method:

Exhibit G. Instructions S: Scheduled A-Feiuipment Failure (Explain) 1-Manual for Preparation of Data D Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C. Refueling

3. Automatic Scram.

Event Report (LER) File (NUREG.

D-Regulatory Restriction l-Continuations 0161)

E-Operator Training & Ucense Examin.ation i

F-Administrative 5-Load Reductions s

G-Operational Error (Explain)

(,-O t he r Exhibit 1. Same Source (9/77) ll Other (Explain)

,n

UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

4 UNIT N AME Brunswick II DATE Foh. 19R1 REPORT MONTil Jan. 1983 COMPLETED BY vran - N'rr4 mn TELEPHONE 010 ^47 0491 e.

E E

.5 ?

3

$Y5 Licensee

,E r, h

Cause & Corrective No.

Date i

3g s

js5 Event gy go3 Action to

$,E 35=

Report #

mU Prevent Recurrence H

o u

e d

83-004 830105 F

.00 B

5 NA CH PUMPXX Removed 2A rx feed pump from service.

Repaired relays A71B-KlB and C72-K6C.

I 2

3 4

F: forced Reason:

Method:

Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1%nual for Preparation of Data B Maintenance or Test 2-Manual Scram.

Er.try Sheets for Licensee l

C-Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG-D-Regulatory Restriction 0161)

E-Operator Training & License Examination 4-Continuatlons F Administrative 5-Load Reductions 5

G-Operational Error (Explain) 9-0ther Exhibit I-Same Source 19/77)

Il-Other (Explain)

I i

=

f l

UNIT SHUTDOWNS AND POWER REDUC 110NS DOCKET NO. 050-0324

l UNIT NAME Brunswick II DATE hh l on REPORT MONTil Jan. 1983 COMPLETED BY Frances Harrison TELEPHONE 919-457-9521 "i

=

es

.5 :o =

5"

.2 e E

,.s X Licensee g *,

c.

Cause & Corrective No.

Date g

3g y

,g g 5 Event t; ?

83 Action to

[3,5 5

j;5g Report #

N0 0

Prevent Recurrence I

6 83-006 830107 p

.0 2

5 NA

. HC HTEXCH Reduced power for waterbox work.

Plugged one tube.

t 2

3 4

F: Forced Reason:

Method:

Exhibit G Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3 Automatic Scram.

Event Report (LER) File GIUREG-D-Regulatory Restriction 0161)

E-Operator Training & License Examination 4-Continuations F Administrative 5-Load Reductions 5

G-Operational Error (Explain) 9-Other Exhibit I.Same Sourec (9/77)

Il-Other (Explain)

UNIT SliUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0324 UNIT NAME Brunswick 11 DATE _Feh. 1983 REPORT MONTil Jan. 1983

-COMPLETED BY Frances Harrison TELEPHONE 919-457-9521 w.

E E

.3 ?

3

$ [$5 Licensee 5 r, Cause & Corrective No.

Date g.

3 Ej j

,$ j $

Event g?

93 Action to H

$5 31 ;5 =

Report #

mV 5U Prevent Recurrence y

v e

6 83-007 830111 F

0 B

5 NA ZZ VALVEX Reduced power to repair valve 2-MD-V5 j

I I

2 3

4 i

F: Forced Reason:

Method:

Exhibit G - Instructions S: Scheduled A Equipment Failure (Explain) 1 -Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee l

C-Refueling 3 Automatic Scram.

Event Report (LER) File (NUREG-D-Regulatory Restriction 0161)

E-Operator Training & License Examination 4-Continuations F-Administrative 5-Load Reductions 5

G-Operational Erior (Explain) 9-Othe r Exhibit I-Same Sovree (9/77)

Il-Other(Explain)

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0324 UNIT NAME Brunswick II DATE Feb. 1983 Jan. 1983 COMPLETED BY Frnncon linrrinnn REPORT MONTil TELEP: LONE 014-/A7-4 01 w.

B

~

c

.5 E 3

4.Y 5' Licensee

,E%

Cause & Corrective No.

Date g

g g

.g g 5 Event um o"

Action to

$>E 5 55 ='

Report #

NU

!b Prevent Recurrence H

e-t u

d 83-008 830115 F

0 B

5 NA CH PUMPXX Reduced power due to 2B recirculation pump problems.

2B rm. recirculation pump seals being rebuilt.

2 l

I 2

3 4

F: Forced Reason:

Method:

Exhibit G Instructions S: Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data B Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG-D-Regulatory Restriction 0161)

E-Operator Training & License Examination 4-Continuations F-Administrative 5-Load Reductions 5

G-Operational Error (Explain) 9-0ther Exhibit I Same Source (4/77)

Il Other (Explain)

t UNIT SilUTDOWNS AND POWER REDUCTIONS DOCK!:T NO. 050-0324 UNIT NAME Brunswick II DATE hh - 1991 REPORT MONTil Jan. 1983 COMPLETED BY Frances Harrison TELEP!!ONE 919-457-9521 "i

~

5" c

ri 3m e E _e E

3.s a Licensee g't, c.

Cause & Corrective

-o No.

Date g

3g g

,g g 5 Event t; ?

83 Action to

$E 5

j di j Report #

  1. G ju Prevent Recurrence 5

83-010 830123 F

.0 B

5 NA CII PIRIPXX 2A rx recirculation pump tripped due to 2-B21-N045-C out of calibration.

Recalibrated 2-B21-N045-C.

I 2

3 4

F: Forced Reason:

Method:

Exhibit G-Instructions S: Schedaied A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.

EnI4y Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG-D. Regulatory Restriction 0161)

E-Operator Training & License Examination 4-Continuations F-Administrative 5-Load Reductions 5

G-Operational Error (Explain) 9-O t he r Exhibit I-Same Source (9/77)

Il-Other (Explain)

050-0324 UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT N AME Brunswick 11 DATE Feb. 1983 REPORT MONTH Jan. 1983 COMPLETED rty Frances Harrison TELEPHONE 919-457-9571 "i

e_

ei 3 -a e S

L 2e E

-3.s M Licensee 5%

8.4 Cause & Corrective c

No.

Date g

g

.g g 5 Event

?

3 Action to

$,E j5j Report #

$0 0

Prevent Recurrence 8-83-013 830124 F

0 B

5 NA TXXXXX ZZZZZZ Reduced power from 80% to 75.5% to clear rod block to perform CRD stall flow PT.

i l

I 2

3 4

F: Forced Reason:

Method:

Exhibit G -Instructions S: Scheduled A-Equiprnent Failare(Explain) l-Manual for Preparation of Data B Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C Refueling 3-Automatie Scram.

Event Report (LER) File (NUREG.

D Regulatory Restrictiori 0161)

E-Operator Training & Ucense Examination le-Cont i nua t I on.

F Administrative 5-Load Reductic ins 5

G-Operational Error (Explain) 9-Othe r Exhibit I-Same Source 19/77)

H-Other (Explain)

-