ML20064M729

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept DER 82-63 Re Design Calculation Error in Refueling Water Tank Seismic Response.Initially Reported on 821026.Extension from 830210 to 830324 for Submittal of Final Rept Requested
ML20064M729
Person / Time
Site: Palo Verde  
Issue date: 01/27/1983
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-22844-GHD, DER-82-63, NUDOCS 8302150625
Download: ML20064M729 (2)


Text

.-

I Docket Nos. 50-528/529/530

..;r..

n.

50.55 (e) Report

//g

~' fpg Arizona Public Service Company y'

PHOENIX. ARIZONA 85036 P.o. box 21666.

Trk,

&n January 27, 1983@f, ANPP-22844-CHD/BSK D U. S. Nuclear Regulatory' Commission

-Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, California. 94596-5368 Attention:

Mr. D. M. Sternberg, Chief Reactor Projects Branch 1

Subject:

Time Extension for Report - DER 82-63 A 50.55(e) Potentially Reportable Deficiency Relating to Design Calculation Error in Refueling Water Tank-Seismic Response File: 83-019-026 D.4.33.2

Reference:

(A) Telephone Conversation between A. D'Angelo and G. Duckworth on October 26, 1982 (B) ANPP-22375, dated November 24, 1982'(Interim Report)

Dear Sir:

The NRC was notified of a Potentially Reportable Deficiency in Reference (A), and an Interim Repor c was transmitted by Reference (B).. At that time, it was estimated that a Final Report would be available by February 10, 1983.

Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by March 24,.1983, when a complete report will be submitted, i

i There is no new information or change to the Interim Report at this time.

Very truly your I

i h.k k oM nwt E. E. Van Brunt, Jr.

i F

APS Vice President

}

Nuclear Projects ANPP Project Director i

EEVBJr/GHD:ske cc:

See Attached Page 2 Gb 1'

1 l

8302150625 830127

^

@ 1 PDR ADOCK 05000528 S

pop

_., _ _,. _, _,.. - _ _. -. - ~.. _ _

g..

  • U. S. Nuclear Regulatory Commiesion Attention:

Mr. D. M. Sternberg, Chief ANPP-22844-GHD/BSK January 27, 1983 Page 2 cc: Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 T. G. Woods, Jr.

J. A. Roedel D. B. Fasnacht G. C. Andognini J. R. Bynum B. S. Kaplan W. E. Ide A. C. Rogers J. Vorees J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli P. P. Klute Lynne Bernabei, Esq.

Harmon & Weiss 1725 "I" Street, NW Washington, D. C.

20006 R. L. Greenfield Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503 t

i l

t i

....,, -. -..,,, -..,. - - - - -.. -