Responds to IE Bulletin 82-04 Re Deficiencies in Primary Containment Electrical Penetration Assemblies.No Bunker- Ramo Electrical Penetrations Using Hard Epoxy Module Design Installed or Envisioned at Facilities
ML20064M324
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 02/01/1983
From: Tucker H
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
REF-SSINS-6820 IEB-82-04, IEB-82-4, NUDOCS 8302150526
Download: ML20064M324 (1)


Text

,

e DUKE POWER Goxiwxy 18.0. HOX 3318D CRIARLOTTE, N.C. 28242 IIAL B. TtJCKER TELEPHONE

.3 [r 9 l0 f

fuary 1, 1983 vu====

+

m,m,,,om.m,,

Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Re: RII: RCD McGuire Nuclear Station Docket Nos. 50-369 and 50-370 IE Bulletin 82-04

Dear Mr. O'Reilly:

This letter is in response to IE Bulletin 82-04 which concerned deficiencies in primary containment 21ectrical penetration assemblies. McGuire Nuclear Station Units 1 and 2 have no Bunker Ramo electrical penetrations using the hard epoxy module design installed, nor are any planned to be installed in any safety related system.

I declare under penalty of perjury that the. statements set forth herein are true and correct to the best of my knowledge.

Very truly yours, c

w Hal B. Tucker WHM/php cc: Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Senior Resident Inspector McGuire Nuclear Station 8302150526 830201 PDR ADOCK 05000369 0