ML20064K397

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Dec 1982
ML20064K397
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 01/14/1983
From: Reavis J
DUKE POWER CO.
To:
Shared Package
ML20064K393 List:
References
NUDOCS 8301180386
Download: ML20064K397 (6)


Text

- . ., . -.

. ,. .. ... . w.

OPERATING DATA REPORT DOCKET NO. _50-369 DATE l-14-83 CO)1PLETED BY J. A. Reavis

- TELEPil0NE 704-17b7567 OPERATING STATUS McGuire Unit 1 Notes

  • NOTE: Nameplate Rating
1. Unit Name:

(Gross MWe) calculated as

2. Reporting Period: . December 1.19R2 - nocomhar 11 1982 '

1450.000 MVA x .90 power 3411

3. Licensed Thennal Power istWti: factor per Page 111,

! 4. Nameplate Itating (Grow .slWe): 1305* NUREG-0020.

5. Design Electrical Ratina,(Net .\lWel: 1180
6. Staximom Deper ' Capacity (Gross 31We):
7. Alasimum Depencable Capacity INet alwe l. 1180 S. If Changes Occur in Capacity Ratinp titems Number 3 Through 7) Since Last Report.Gise Reasons:

None

9. Power Level To Which Restricted. If Any (Net alwe): None
10. Reasons For Restrictions. lf Any:

This alonth Yr..to Date Cumulative 8 760.0 9 504.0

11. Ilours in Reporting Pened 744.0
12. Number Of itemrs Resetor Was Critical 740.0 7 092.5 7 118.1
13. Reactor Reserve Shutdown llours
, 14. Ilours Generator On.Line 738.0 7 046.6 7 092.3 l 15. Unit Reserse Shutdown ilours
16. Gross Thermal Energy Generated (31Wil) 1 265 980 13 417 463 13 502 418 .
17. Gross Electrical Energy Generated l>!WH) 433 363 ,_,

4 598 155 4 626 591

13. Net Electrical Energy Generated (SIWil) 405 269 4 302 267 4 321 323
19. Unit Service Factor 99.2 80.4 74.6
20. Unit Availability Factor 99.2 80.4 74.6
21. Unit Capacity Factor (Using SIDC Nett 46.2 41.6 38.5
22. Umt Capacity Factor IUsing DER Net) 46.2 41.6 38.5
23. Unit Forced Outage Rate 0.8 16.0 2 2. t.
24. Shutdowns Scheduled Oser Nest 6 Slonths IType. Date.and Duration of Eacht: l Steam Generator Modification - January 21, 1983 - 11 Weeks 2.i. If Shut Down At End Of Report INriod. Estimated Date of Startup:
26. Units In Test Status (Prior to Commercul Operation 1: Forecast Achiesed INITI AL CRITICALITY INITI A L 1.LLT l RICliY _ _ _

CO\lNil RCIT L OPER A IlON 8301180386 830114 (9/771

{DRADOCK 05000369 PDR

DOCKET NO. 50-369 UNITSilUTDOWNS AND POWER REI)UCT10NS UNIT NAstE McGuire 1 .

DATE l-14-83 COMPLETED HY J. A. Reavis REPORT Af 0NTl! December. 1962 TELEPIIONE -

w.

, .5 g 3- E Licensee ,E-r, , Cause & Corrective No. Date H

.- 3g j ,j g c2 Even
3y eT Action en yE e2 5 g?, g Report = (4 0 8' u

Prevent Recurrence g

C 16-P 82-12-01 F --

H --

CB HTEXCH Limited to 50% power while awaiting modification to steam generator design.

21 82-12-22 F 6.02 A 1 CJ VALVEX RCS leakage over 1 GPM due to partially open vent valve on BIT line. Valve shut and pipe cap installed.

I 2 3 4 F: Forced Reason: Methigt: Exhibit G -Instructions S Schedaled A Equipment Failure (Explain) 1 Manual for Preparation of Data B Maintenance or Test 2 Manual Seram. Entry Sheets for Licensee C Refueling .

1 Automatic Scram. Event Report ILER) File INtIREG.

D Regulatory Restrietion 4-Ot her (Explain) 01bl)

E Ope.stor Training & License Examination F Administrative S G-Opesational Error (Explain) - . Exhibit I-Same Sousee .

19/77) Il Other IExplain) *

..v

DOCKET NO. 50-369 UNIT McGu b 1 1-14-83 DATE AVERAGE DAILY UNIT POWER LEVEL December,1982 MONTil AVERAGE D AILY POWER LEVEL AVERAGE D AILY POWER LEVEL DAY (MWe net) DAY (MWe. net) ,

558 17 557 1

557 558 2 18 556 19 556 3

560 555 4 20 SER 21 556 5

554 22 345 ,

6 543 23 559 7

553 24 557 8

556 25 523 9

' 554 26 478 10 554 557 11 27 551 28 557 12 553 556 13 29 553 30 550 14 553 31 555 15 556 16 DAILY UNrr POWER LEVEL FORst INSTRlRTIONS On this fonn, hst ths .iverare d.iity unit power lesel in M'Ne-net for each day m the reporting n.onth.

Compute to the ne.irest w nole megawatt.

These figures will I e used to plot 2 graph l'or each reportint; month. Note that by using ma.timun.

..s easions when the dady dependable ccpacit/ lor the net electrical ratin: of the unit thers: may be average power levet enceds the Itm kne f or the restristed power lesel knel, in such c.ises, the average daily umt power output sheet should be footnoted to (splam the app.uent anomaly.

DOCKET NO: 50-369 UNIT: McGuire 1 DATE: 1/14/83 6

NARRATIVE SU) DIARY Month: December, 1982 __

McGuire Unit 1 entered the month limited to 50% power until modifications have been completed on the steam generator.

The unit was manually shutdown on December 22 in order to identify and repair a reactor coplant leak of over 1 GP.M through a partially open vent valve on a BIT line. The valve was shut and a pipe cap installed. The unit returned to service later the same day.

Power was reduced on December 25 and 26 in order to reach system minimum load.

McGuire Unit 1 operated through the end of the year at 50% power.

, i A

B V

e

\

,,, l l

e

MONTHLY REFUELING INFORMATION REQbTST

l. Facility name: McGuire Unit 1 ,
2. Scheduled next refueling shutdown: January 1984 ,
3. Scheduled restart following refueling: .
4. Will refueling or recumption of operation thereaf ter require a technical specification change or other license amendment? N/A .

If yes, what will these be?

i If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A .

5. Schedried date(s) for submitting proposed licensing action and supporting information: N/A .
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures). N/A 4
7. Nunber of fuel assemblies (a) in the core: 193 .

(b) in the spent fuel pool: 27 . )

8. Present licensed fuel pe,o1 capacity: 500 .

Size of requested or planned increase: .

9. Projected date of last refueling which can be accommodated by present licensed capacity: .

Date: January 14, 1983 DUKE POWER COMPANY , ,

Name of

Contact:

J. A. Reavis Phone: 704-373-7567 i

McGUIRE NUCLEAR STATION Operating Status Report

1. Personnel Exposure For the month of November, no individual (s) exceeded 10 percent of their allowable annual radiation dose 1 Lait.
2. The total station liquid release contribution to whole body dose for November has been compared with the Technical Specifications annual value of 3 mrem; the total release for November was less than 10 percent.

The total station gaseous release contribution to any organ dose for November has been compared with the Technical Specifications annual value of 15 mrem; the total release for November was less than 10 percent of this limit.

l