ML20064J485

From kanterella
Jump to navigation Jump to search
Amend 15 to License DPR-70 Revising,On a one-time Basis,Time That Boron Injection Tank Is Permitted to Be Inoperable Prior to Implementing Requirement for Placing Reactor in Hot Standby
ML20064J485
Person / Time
Site: Salem PSEG icon.png
Issue date: 03/06/1979
From: Schwencer A
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19273B233 List:
References
NUDOCS 7904060011
Download: ML20064J485 (5)


Text

-

g

..a~

a

.... - ~

p,p me:

UNITED STATES i

NUCLEAR REGULATORY COMMISSION j

WASHINGTON. D. C. 20665 PUBLIC SERVICE ELECTRIC AND GAS COMPANY PHILADELPHIA ELECTRIC COMPANY DELMARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELECTRIC COMPANY 1

i DOCKET NO. 50-272 f

SALEM NUCLEAR GENERATING STATION, UNIT NO.1 AMENDMENT TO FACILITY OPERATING LICENSE 2

Amendment No.15 O'

License No DPR-70 1.

The Nuclear Regulatory Comission (the Comission) has'found that:

A.

The application for amendment by Public Service Electric and Gas Company, Philadelphia Electric Company, Delmarva Power and Light Company and Atlantic City Electric Company (the 1

licensee) dated January 12, 1979, and as supplemented January 15, 1979, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application,

.the provisions of the Act, and the rules and regulations of the Comission;

{,

C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of I

the public; and t

E.

The issuance of this amendment is in accordance with 10 CFR 1

Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

i i

79 04 06 00$,

l y.___

..... _.. _.. ~...,, -. - _,.,

=

...]

_.~ _ -.

u-.._

_ -w

'l-2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license ~

amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-70 is hereby amended to read as follows:

(2) Technical Specifications Il The Technical Specifications contained in Appendices A and B, as revised through Amendment No.15, are i

hereby incorporated in the license.

The licensee i

shall operate the facility in accordance with the Technical Specifications.

Q 3.

This license amendment was effective as of January 12, 1979.

FOR THE NUCLEAR REGULATORY COMMISSION l

l 4

4. Schwencer, Ch f l

Operating Reactors Branch #1 l

Division of Operating Reactors i

Attachment:

Charges to the Technical Specifications l

l Date of Issuance:

March 6,1979 4

es i

I i

1 P

4 e ~=r y e -.

.-w eegpew. m.y j g e w e gev..,* ~

e.= w..gume+we+ w og*-e.a.,<e-esp ey = =

va- %.w3 m. permw-p.

=+,w-3 ee p. -

-sq wsm =.. w w - ye,

4pe -

, - a s..

aw..

,_...u.:..-.

= ~ ~..

. u =. u..- -.-.

.2

~

5 i

ATTACHMENT TO LICENSE AMENDMENT NO.15 FACILITY OPERATING LICENSE NO. DPR-70

.f DOCKET N0. 50-272 Replace the following page of the Appendix "A" Technical Specifications with the enclosed page.

The revised page is identified by Amendment number and contains vertical lines indicating the area of change.

The i

corresponding overleaf page 3/4 5-8 is also provided to maintain Q,

document completeness.

No changes were made on 3/4 5-8.

3 Page 3/4 5-7 x-

_I t

i i

(

j.

i 3

-l

.~..,a...

__._2_,___,_,__._._

.. _ =.

_x.-.

a..: ~

. - 3

)

1 EMERGENCY CORE COOLING SYSTEMS 3/4.5.4 BORON INJECTION SYSTEM BORON INJECTION TANK _

LIMITING CONDITION FOR OPERATION 3.5.4.1 The boron injection tank shall be OPERABLE with:

A minimum contained volume of 900 gallons of borated water, f

a.

..~l b.

Between 20,100 and 21,800 ppm of boron, and

,i A minimum solution temperature of 145 F.

O c.

APPLICABILITY: MODES 1, 2 and 3.

f ACTION:

With the boron injection tank inoperable, restore the tank to OPERABLE

(

status within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or be in HOT STANDBY and borated to a SHUTDOWN l

MARGIN equivalent to 1% ak/k at 200*F within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; restore the tank to OPERABLE status within the next 7 days or be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.*

i.

SURVEILLANCE REQUIREMENTS 4

O 4.5.4.1 The baron injection tank shall be demonstrated OPERABLE by:

Verifying the water level through a recirculation flow test a.

at least once per 7 days, i

Verifying the boron concentration of the water in the tank at b.

least once per 7 days, and Verifying the water temperature at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, c.

l 12, 1979 and expiring at 11:55 A.M.,

  • Effective 5:55 P.M. January January 13, 1979 the following ACTION statement is applicable:. With the boron injection tank inoperable, restore the tank to OPERABLE I

I status within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or be in HOT STANDBY and borated to a SHUTDOW" MARGIN equivalent to 1% ak/k at 200*F within the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />; restore the tank to OPERABLE status within the next 7 days or be in HOT SHUTDOWN within the next~12 hours.

Amendment No. B, 15 SALEM - UNIT 1 3/4 5-7

..w

,-,.n.~v..-~~~~-e,.,_

,.-,m...,,w._,,n.~..

..-..,nn

-- - -..-