ML20064H702
| ML20064H702 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 12/19/1978 |
| From: | Stallings C VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| NUDOCS 7812220078 | |
| Download: ML20064H702 (1) | |
Text
,
YIRGINIA Ex.ncraic Axn Powen COMPANY H rcnx oxx).Va mox xrA 23261 Jacr.;cr 19, 1973
'r.
.!1ncs.'. "'"eilly, Director 3.e ri.il.?o.
7S Offics of Insoection and ::nforcement P0/I'L3: scj U. 3. Uuclear lesulatory Co=nission Docket 9o.
3G-339 i
3e3 on II License 77o.
CPPR-78 101 "arietta Street, Suite 3100 Atlanta, Georgia 30303
_%ar :3r. O'7eilly:
In our letters of Aoril 23, 1976 (Serial No. 992) and November ?,
12h (Serial :4o. 313), we discussed innlecentation of the Muclear Power 3tation 2uality Assurance !!anual (JPSO.O!) for North Antaa Unit 1.
This lettar still provide our schedule for implementation of the MPECN! for North Anna Unit 2.
Coincident with the issuance of our Unit 2 facility operating license, ve will implement Section 3, Design control. Until that time, desian changes are handled through our construction QA program.
All other sections of the NPSQAM are being i=nleriented on various !! nit 2 svstems at the time of system conditional ralease wnicn transfers the control of a system from construction to operations.
Very truly yours.
I b
C. :1. Stallings Vice Presi. lent-Power Supply and Production Operations cc:
Mr. 3arold R. Denton, Director office of Nuclear Reactor Regulation Bool 5
7812220077 I[o k