Notifies NRC of Potential Significant Deficiency at Subj Facil on 781208.Examination of Emergency Diesel Generator Battery Rack Showed That Wall Mounts,Side Rail Supports & Bottom Support Rails Were Not Installed Correctly
ML20064H439
Person / Time
Site: North Anna 
Issue date: 12/12/1978
From: Stallings C
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 7812200212
Download: ML20064H439 (2)


Text

.d~

u

.-M.

...?

a

~

VI:tCINIA Er,0CTCIC AND' Powan CoxPANY l

Rzcmasown,Vamorw rA naaet December 12, 1978-h Mr. James P. O'Reilly, Director Serial No.

708 R

Office of Inspection and Enforcement PO/ EMS:sej U. S. Nuclear Regulatory Commission Docket No.

50-338 Region II License No.

NPF-4 i

101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

7 Under the provisions of the operating license Technical Specifications, NRC Region II was notified on 12-08-78 that a potential significant deficiency

(

existed at North Anna Power Station, Unit No.1.

In accordance with the reporting requirements of the above regulations, the following information is submitted:

A.

Name and address of reporting individual:

C. M. Stallings Virginia Electric & Power Company P. O. Box 26666 Richmond, Virginia 23261 B.

Facility, activity, and/or component affected:

North Anna Power Station Emergency Diesel Generator Battery Rack Name of firm supplying the component, activity or service:

C.

Colt Industries Inc.

Fairbanks Morse Inc.

Power Systems Division 701 Lawton Avenue Beloit, Wisconsin 53511 D.

Description of defect, deficiency, or failure to comply:

At the request of Vepco operating personnel, the Architect / Engineer (S & W Engineering Co.) compared the emergency diesel generator battery rack seismic design drawings and the manufacturer's installation drawings.

It was discover-ed that the wall mounts, the side rail supports and the bottom support rails were not installed according to seismic design drawings.

It was also discover-ed that a request to modify these components during construction had not been implemented.

78122002I2_

3

dvisoin:A Ei.zcTctC ANs Powan Cownwy v Mr. Jame3 P. O'Reilly 2

Seismic calculations indicated that the bottom support rails will not yield, during a DBE;however, the wall mounts and the side rail supports will yield.

E.

Date of determination of reportability.

December 8, 1978 F.

Similar components, activities or Services:

I The racks are similar but not identical to racks used on Unit 2 of the North Anna Power Station.

G.

Corrective Action which has been, or is being or will be taken, the individual responsible and the length of time to complete the action.

i

' (-

The battery rack wall mounts have been replaced by seismically approved l

mountings. Approved side rail supports are presently being fabricated and are

' tenatively scheduled for installation on or before December 15, 1978. Repre-l sentatives of Vepco, Colt Industries and Stone & Webster Engineering Co.

tentatively will inspect the battery rack for completion of the modifications on December 12, 1978.

H.

Other information:

Any additional information on the above topic will be submitted in the Licensee I

Event Report.

Should you require futher information, please contact this office.

[

Very truly yours, j

bf C. M. Stallings Vice President-Power Supply

~