Provides Addl Info Re 781205 Rept to NRC Re Discrepancies Between Battery Racks & Matl Specified for Racks in Vendors Seismic Calculations
ML20064G601
Person / Time
Site: North Anna Dominion icon.png
Issue date: 12/08/1978
From: Brown S
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
REF-PT21-78-090-000 706, NUDOCS 7812120117
Download: ML20064G601 (2)


Text

.

Mr. F. M. Alligood, Jr.

Mr. E. R. Bane

- Mr. S. G. Eccles Mr. W. B. Dodson - S&W Mr. D. W. Speide11 Mr. R. M. Berryman Mr. D. L. Benson Mr. M. S. Kidd, NRC (N. A.)

Mr. J. N. Christman - H&W Mr. R. B. Cohen Mr. R. B. Bracbury - S&W Mr. J. C. Harris, Jr.

kf st December 3,1973 Mr. James P. O'Reilly, Director Serial No. 7C6 Office of Inspection & Enforcement PSE&C/ REC:bep/mc U. S. Nuclear Regulatory Ccmission Region II Cocket No. 50-339 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

Dear Sir:

On December 5,1973, a report was made under the provisions of 10CFR50.55(e) concerning discrepancies between the materials supplied by the vendor for diesel generator battery racks and 'raterial specified for the racks in the vendor's seismic calculations.

In accordance with the reporting requirements of 10CFR21, the following infomation is sutruitted:

A.

Name and address of reporting individual:

Mr. E. A. Baum, Executive Manager Licensing and Quality Assurance Virginia Electric and Power Comeany P. O. Box 26666 Richmond, Virginia 23261 B.

Facility, activity, and/or comoonent affec*ad:

North Anna Power Station Unit 2 Diesel Generator Battery Racks C.

Name of fim constructing the facility or supolying the comconent activity or service.

Colt Industries Fairtanks Morse Engine Division 701 Lawton Ave.

3eloit ' isconsin 53511 D.

Description of defect, deficiency, or failure to cceply:

When reordering a structural member for the racks that had been scarred by battery acid during clant construction, one of the A-E's engineers noticed that some of the structural mesters sucolfec by the vendor were different from those used in the vendor's seismic calculaticns.

6{

781212Olll Op

Mr. James P. O'Reilly 2

E.

Date of detemination of reportability:

December 5, 1978 F.

Similar components, activities, or services:

The racks are similar but not identical to racks used on Unit 1 of the North Anna Power Station.

G.

Corrective action which has been, is being or will be taken, the indi-vidual responsible and the length of time to complete the action:

Colt Industries has determined that the 14 gauge horizontal rack channels supplied are adequate for seismic conditions. Other bracing and wall clips which are inadequate as sucolied will be replaced by field fabricated members in accordance with Colt supolied drawings which confom to Colt's seismic calculations. Colt has approved the A-E's plan to have the site electrical contractor fabricate and in-stall the new members. All work will be completed on the battery racks by December 15, 1978.

H.

Other information:

Since no other actions will be reouired to make the battery racks confom to seismic requirements as specified by Colt Industries, we consider this to be the final report under the provisions of 10CFR50.55(e)(3).

Should you require further information, please contact this office.

Very truly yours, f.

Sam C. Brown, Jr.

Vice President - Pcwer Station Engineering and Construction ec: Director, Office of Inspection and Enforcement (3) dr. Harold R. Denton, Director Office of Nuclear Reactor Regulation