Monthly Operating Rept for Dec 1982
ML20064G567
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 01/01/1983
From: Kelly L
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
Shared Package
ML20064G555 List:
References
NUDOCS 8301110540
Download: ML20064G567 (6)


Text

n -. .- - _ _ - - _ _ - _ _ , ,

.)

  • **  ?

3...',

d OPERATING DATA REPORT - i DOCKET NO. 50-286  ;

DATE --1-01-n1 COMPLETED BY L. Ko11v - _

TELEPHONE f4141 710-8200 1

OPERATING STATUS

1. Unic Name: Indian Point No. 3' Nuclear Power PI "t
2. Repor-ing Period: Decomher 1982
3. Lkensed Thermal Power (MWt): 3025 1013  :
4. Nameplate Rating (Gross MWe):

S. Design Electrical Rating (Net MWe): 965 .

6. Maximum Dependable Capacity (Gross MWe): 926
7. Maximum Dependable Capacity (Net MWe): 891
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

- 3,

9. Power Level To Which Restricted,1f Any (Net MWe):
10. Reasons For Restrictions. !f Any:

L This Month Yr..to.Date Cumulative'

11. Hours in Reporting Period 744 8760.0
  • 55561.0 , l l 12. Number Of Hours Reactor Was Critical o 1984.0 34090.8 ,
43. Reactor Reserve Shutdown Hours o -

o o

14. Hours Generator On-Line o lono n 32913.1 -

--15. Unit Reserve Shutdown Hours o o .o '

16. Gross Thermal Energy Generated (MWH) o s.060.010 nn 1a1.ani o 1.502.170 26.29s.300 i
17. Gross Electrical Energy Generated (MWH)
18. Net Electrical Energy Generated (MWH) o 1.436.036 29.1R1 a41
19. Unit Service Factor o 22.s so 9
20. Unit Availability Factor o 22.s so 2
21. Unit Capacity Factor (Using MDC Net) 0 1R.4 90 o
22. Unit Capacity Factor (Using DER Net) o 17.o 47.0
23. Unit Forced Outage Rate o 2.3 14.3  ;
24. Shutdowns Scheduled Over Next 6 Months (Type.Date,and Duration of Each): * "
  • l Rofuelino Outage in Procross.

, l Upon. completion of scheduled ,

25, If Shut Down At End Of Report Period. Estimated Date of Startup: ftaintenance Est. date (Feb. 83)

26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved i

INITIAL CRITICALITY l

INITIAL ELECTRICITY COMMERCIAL OPERATION .

! 8301110540 830104 i 4

PDR ADOCK 05000286 '

R PDR i

_ . _ _ _ . . . _ _ _ _ _ . . .. _ _ . _ _ _ _ _ _ ___ _ _ _ _ _ _ _ _ _ (%77 )- _ _ _ _ _ _ _ _

~

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. '50-286 Indian Point UNIT Mn_3 DATE January 1, 1983 COMPl.ETED BY __L Kelly _

TELEPHONE (914) 739-8200 MONTH nocomber 1982 DAY- AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL I (MWe-Net) (MWe-Net) 1 0 17 0 2 0 I8 0 3 0 19 0 4 0 20 0 5 0 21 0 -

6 0 n 0

.. . . . _ _ . _ . . . __ . .c 7 0 23 0 l 3 0 24 0

9 n 25 0 10 0 26 0 II o 27 0 12 0 3 0 13 0 29 0 14 0 0 30 15 o 33 0 16 0 INSTRUCTIONS On this format list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whob megawatt.

. l (9/77) l t

-- , ----.y---_m , , _ ,, -

UNITSilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-286 UNITNAME Indian Point No. 3. '

DATE 1-1-93 REPORT MONT11 narnnhor 1982 -

TELEPIIONE f9141 739-8200

e. '

- E a

,- ,$7 }; jD y Licensee Eg

  • gn. Cause A Corrective No. Date g gg j

~gc Event p { Action to

  • l-f- e

~i i

Report # mU u

o Prevent Recurrence 6

\

04 820325 S 744 B&C N/A N/A N/A Unit in a scheduled cycle III-IV-refueling and maintenance outage.

1 e

)

I 2 3 4 F: Forced Reason: Method: Exhibit Instructions S: Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data B Maintenance or Test 2-Manual Scram- Entry Sheets for Licensee

'C Refueling 3-Automatic Scram.

D Regulatory Restriction Event Report (LER) File (NURFG-4-Other (Explain) 0161)

E-Operator Training & License Examination

  • F Administrative 5

G-Operational Error (Explain) 19/77) Il-Other (Explain) Exhibit , . Same Somee j .

MOlmlLY I & C CATEGORY I REPORT December 1982 Month Date l W.R. # Equipment Malfunction Corrective Action 8-18-82 IC-1-1774-2 Radiation Monitor R17-B Improper Reading Replaced transistor in component cooling system detector preamplifier.

11-17-82 IC-1-1838-lC Valve 789 RCP Thermal Close indicating light Replaced light socket.

Barrier Disch. Isolation inoperative 11-17-82 IC-1-1863-lC Nuclear Instrument Power Loss of Detector voltage Replaced defective high-voltage Range Channel 44 power supply.

11-22-82 IC-1-1890-2 Nuclear Instrument No response from upper section Replaced operational amplifier Detector Current deviation comparator card in upper section comparator Comparator Channel 44 card, 11-26-82 IC-1-1899-2 Radiation Monitor R17-A Improper Reading Replaced meter on drawer.

component cooling system

7- e MO!3TilLY MAIt3TEt1AtiCE REPORT , .

. December 1982 Month .

'WR 8 DATE EQUIPME!3T -

MALFUtlCTION CORRECTIVE ACTIOt3 1-3260 12-07-82 Service Water Valve to Solenoid Malfuention Replaced Solenoid Valve Diesel Generators FCV-1276 1-3096 12-16-82 Pan Cooler Unit #32 Heat detector malfunction Replaced heat detector 1-3086 12-16-82 Air Ejector Valves to Valves do not seat properly Lapped seats ,

containment PCV-1229 and PCV-1230

?

O e

e 9 g 0

l'I*

e

$ e

m f

SUMMARY

OF OPERATING EXPERIENCE Indian Point Unit 3 remained shutdown for the entire reporting period.

Unit repairs, modifications and preventive maintenance is proceeding as scheduled.

Steam generator sleeving and girth weld repairs are in progress and proceeding as scheduled.

0