ML20064F582

From kanterella
Jump to navigation Jump to search
Forwards 1993 Mcguire Nuclear Station Final Safety Analysis Rept Update.Notes Unit 2 EOC8 Refueling Outage Ended 930914
ML20064F582
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 03/14/1994
From: Mcmeekin T
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20064F587 List:
References
NUDOCS 9403150357
Download: ML20064F582 (2)


Text

,:1 a

11 I

v.

Duke nnrer Company (704)S75-4000 McGuire Nuclear Statwn 12700 Hayrs Ferry Road Hunterstdie, Nr 28078-8985 DUKEPOWER March 14,1994 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555

Subject:

McGuire Nuclear Station Docket Nos. 50-369 and 50-370 1993 FSAR Update f

Pursuant to 10CFR50.71(e), please find enclosed the original and ten copies of the 1993 McGuire Nuclear Station Final Safety Analysis Report (FSAR). The previous FSAR update for McGuire was provided by a letter dated September 18,1992.

After this previous submittal, the schedule for submitting subsequer4 FSAR updates for McGuire was revised in accordance with 10CFR50.71(e)(4). As such, the revised sc'ledule for submitting subsequent FSAR uodctes will be 6 months after Unit 2 refueling outages.

Pleaso ' note that 'he Unit 2 EOC8 tefueling outage ended September 14,1093. The effective date of the changes provided by this submittal is Unit 2 EOC8 refueling outage.

{

Very t uly yy!rs, Krbbd T. C. McMeekin,Mce Pres! dent McGuire Nuclear Station f

Attachments TCM.KLC:kic cc:

S. D. Ebneter, Regional Administrator U. S. Nuclear Regulatory Commission Region 11 101 Marietta St., NW Suite 2900 Atlanta, GA 30323 1'5pr..y'j Mr. Victor Nerses, Project Manager Office of Nuclear Reactor Regulation Washington, D.C. 20555 Mr. George Maxwell, Senior Resident inspector McGuire Nuclear Station C6b 31:50357 940314 h

ADOCK 05000369 g

PDR j

.,, n. w.,

i M

U. S. Nuclear Regulatory Commission March 14,1994 -

Pagc?

T. C. McMeekin, being duly sworn, states that he is Vice President, McGuire Nuclear Generation Department, Duke Power Company: that he is authorized on the part of the said Company to sign and file with the Nuclear Regulatory Commission this revision to the McGuire Nuclear Station Final Safety Analysis Report and that all statements and matter set forth therein are true and correct to the best of his knowledge.

kj T. C. fAcMeekin, Vice President McGuire Nuclear Station 9

' ay of March,1994.

Subscribed and sworn to me this d

Nolary Pp!ic a

{

My Comm,ission expires:

n/13N2

//

l l

L

-