Vepco flovember 14, 1978
~
14r. James P. O'Reilly, Director Serial fio. 591A Office of Inspection & Enforcement PSE&C/tt!1/adw U.S. luclear Regulatory Commission Region II Docket No. 50-339 101 Marietta Street, Suite 3100
-m Atlanta, Georgia 30303
Dear Mr. O'Reilly:
In accordance with 10CFR50.55(e), the NRC, Region II, was notified on October 16, 1978 that the 64 hex nead bolts used to attach the mechanical guard barriers to the sides of the high density spent fuel racks were not subjected to mechanical properties'. tests following heat treatment.
Veoco has retbrned the bolts to the fabricator, Speedway liachine and Tool Company (S;MTC0), and expects the bolts to be replaced by mid-December.
Since the work has not yet been completed, you should consider this an in-terim report. The spent fuel racks have not been installed; therefore, a short delay will have no adverse consequences. A final report will be forth-coming subsequent to the completion of our work effort.
If you require any further information at this time, please contact us.
Very truly yours, q '-.
.-C Sam C. Brown, Jr.
Vice President - Power Station Engineering and Construction ec: Mr. John G. Davis, Acting Director Office of Inspection & Enforcement Mr. Harold R. Denton, Director Offica of Nuclear Reactor Regulation