ML20064E750

From kanterella
Jump to navigation Jump to search
64 Hex Bolts Used to Attach Mech Guard Barriers to Sides of High Density Spent Fuel Racks Which Were Not Subjected to Tests Following Heat Treatment Have Been Returned to Fabricator & Should Be Replaced by mid-Dec
ML20064E750
Person / Time
Site: North Anna Dominion icon.png
Issue date: 11/14/1978
From: Brown S
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
591A, NUDOCS 7811210399
Download: ML20064E750 (1)


Text

a L

Vepco flovember 14, 1978

~

14r. James P. O'Reilly, Director Serial fio. 591A Office of Inspection & Enforcement PSE&C/tt!1/adw U.S. luclear Regulatory Commission Region II Docket No. 50-339 101 Marietta Street, Suite 3100

-m Atlanta, Georgia 30303

Dear Mr. O'Reilly:

In accordance with 10CFR50.55(e), the NRC, Region II, was notified on October 16, 1978 that the 64 hex nead bolts used to attach the mechanical guard barriers to the sides of the high density spent fuel racks were not subjected to mechanical properties'. tests following heat treatment.

Veoco has retbrned the bolts to the fabricator, Speedway liachine and Tool Company (S;MTC0), and expects the bolts to be replaced by mid-December.

Since the work has not yet been completed, you should consider this an in-terim report. The spent fuel racks have not been installed; therefore, a short delay will have no adverse consequences. A final report will be forth-coming subsequent to the completion of our work effort.

If you require any further information at this time, please contact us.

Very truly yours, q '-.

.-C Sam C. Brown, Jr.

Vice President - Power Station Engineering and Construction ec: Mr. John G. Davis, Acting Director Office of Inspection & Enforcement Mr. Harold R. Denton, Director Offica of Nuclear Reactor Regulation