Responds to 780913 NRC Ltr Re Violations Noted in Inspec Rept 50-219/78-20.Corrective Actions:Dosimeters Stored in Emergency Kits Will Be Placed on Dosimeter Calibr Tickler Sheet
ML20064D713
Person / Time
Site: Oyster Creek
Issue date: 10/04/1978
From: Ross D
JERSEY CENTRAL POWER & LIGHT CO.
To: Crocker H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20064D711 List:
References
NUDOCS 7811080258
Download: ML20064D713 (1)


Text

. .

n

' ', , . .m Jersey Central P;wer & Light Comp:nd h .

% Macisen Avenue at Punch Scwt Acad Mornstown. New Jersey 07970 I

(201)455-8200 October 4, 1978 Mr. Hilbert W. Crocker, Acting Chief Fuel Facility and Materials Safety Branch Office of Inspection and Enforcement United States Nuclear Regulatory Commission Region 1 631 Park Avenue 7

King of Prussia, Pennsylvania 19406

Dear Mr. Crocker:

Subj ect: Oyster Creel < Nuclear Generating Station Docket No. 50-219 ISE Inspection Reoort No. 50-219/78-20 This is in reply to your letter dated September 13, 1978, to Mr. Ivan R. Finfrock, Jr. regarding the ins::ection conducted by Mr. D. Donaldson on August 22 - 24, 1978 at tne Oyster Creek Nuclear Generating Station. In Appendix A to your letter there is noted one activity which was not conducted in accordance with the conditions of the Oyster Creek NRC Facility License. The specific infraction cited and our response to it are given below:

Infraction - Oyster Creek Station Technical Specification 6.11 requires that procedures for personnel radiation protection be prepared and C adhered to. Health Physics Procedure 906.17, Spike Testing and Leak Testing of Sel f-Reading Dosimeters, prepared pursuant to Technical Speci fication 6.11 requi res that self-reading dosimeters b,e spike and leak tested prior to being placed in service and every six months thereafter.

C.antrary to the above, sel f-reading dosimeters in the various emergency kits at the time of the inspection, had been placed into service without prior spike and leak testing.

Response - To avoid further items of noncompliance in this area, the dosimeters stored in emergency kits will be placed on the dosimeter calibration tickler sheet which will require them to be calibrated every six months or to be replaced with calibrated dosimeters on that frequency.

Yours very truly,

~

d Donald A. Ross, Manager m9 Generating Stations-Nuclear 7811080MS5 l Jersey Central Power & Ugnt Comcany s a Memeer of the General Puche Utilmes System l