Forwards Responses to Encl 4 of NRC Re Fire Protection Program at Facility.Response to Encl 3 Will Be Submitted by Nov 1978
ML20064D459
Person / Time
Site: FitzPatrick 
Issue date: 10/27/1978
From: Gronberg W
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: Ippolito T
Office of Nuclear Reactor Regulation
References
JNRC-78-55, NUDOCS 7811070126
Download: ML20064D459 (3)


Text

.

_~>-.-.._ ' * -n.*. L

~ w - - ~~ -**n 3


21*L 4 A ' ~ ~ V ' * * ' ^

,jff* e~ ( '=+'..e
  • .-*=*

a.

f

.?~

~

POWER AUTHORITY OF THE STATE OF NEW YORK t o CotuMuus Cinct.t.

NEW YORK, N. Y. t oo19 (2 T24.397 0200 '

cronceT.menny

" " '.",' ';," '" '?,'a.

"*'5.0,;,"!;i!!....,

cnnce t. i~c.u..

g.g..........

4.t*

[lCManD M. FLTNN h,,',."fg,,,, g g',I,,,

C%cnf S. pa8LLoNZ8 Octob,r 27, 1978 son ~ w.

osion, n.ua r.Luoor D4 A E.T O R O JIJRC-78-55

-*-

r.~..

Twoua,s,,r,.,ge,n~n.sa.

Director of Nuclear Reactor R*gulation United States haclear Ragulatory Commission Washington, D. C.

20555 Attention: Mr. Thomas A. Ippolito Oparating Reactors Branch No. 3 Division of Operating Reactors

Subject:

Jamas A. FitzPatrick Nuclear Powar Plant Responses to hRC Staff Concerns / Staff Positions Ralating tc Firmotaction Program Do 'kat Nokbu-3?.3 'N V

Daar Sir:

Transmittad herewith are recponses to Enclosure No. 4 of your letter dated Captember 23,1978 concerning tha fire protection program at the Jame A. Fitzpatrick Nuclear Power Plant.

'N Rasponses to Enclosure No. 2 were sant to you on October 23, 1978. The Authority will nobinit rasponens to Euclocure No. 3 to tha Commission during the first week in November,1978.

Very truly yours, hur)

Wilbur L. Gronberg Assictant General Manager-Engineering Enc.

@Y 781107oIab he

u JAFNPP RESPONSES TO NRC STAFF CONCERNS /POSITIONC (DELINEATED IN ENCLOSURE 4) RELATING TO FIRE PROTECTION PF-33 Unsealed Pipe Penetrations The staff's position is to install fire rated seals in the pipe penetrations through fire barriers separating safety related areas of the plant from other safety related and non safety related areas.

The Authority will perform a study to determine which pipe penetrations warrant sealing and selection of the method (or methods) of sealing and this will be completed by December 31, 1979.

Installation of the seals is expected to be completed by December 31, 1980.

It may be not be possible to seal certain pipe I

penetrations due to pipe expansion, hydraulic loading and anchoring considerations.

Pipe penetration seal selection will be based on ease of installation, quality of material, maintenance and cost considerations.

PF-34 Electric Bay Heat Detector The Authority has adopted the Staff Position.

The heat detector was replaced on October 19, 1978.

PF-35 Fire Door Modifications The Authority will adopt the Staff Position.

The door between the East and West Electric

(

(SW-1 and SW-2) will be replaced with a Bays labeled door having a rating of 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> with no glass panel.

The August 3, 1978 and April 1977 submittals indicated that the access doors to the Administra-tion Building stairs (Control Room Complex Stairways) were A rated 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> doors.

While the original doors on elevation 286 and 300 were A l

rated 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> doors, these doors were modified l

by installing a non-wired glass panel of less The than 100 square inches for personnel safety.

double doors on elevation 272 were purchased with I

wired glass panels and are B rated 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> doors.

l NFPA 101 (1973) and NFPA 80 (1975) permit the hour Administration Building stairway to be 1 rated structure with B rated lh hour doors that have wire glass panels of not more than 100 square incher.

i y

P

~ ~t

=_

In addition to the Administration Building stairway doors and the Electric Day door, one door to the Control Room o;. elevation 300 has been modified by installing a non-g wired glass panel.

The Authority will re-i place the two stairway doors in question on clovations 206 and 300 with B rated lis hour doors with rated wire glass panels and re-place the Control Room door on elevation 300 with an A rated 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> door with no glass panel.

Selection and ordering of replacement doors will be completed by December 31, 1978 and completion of the modification should be completed by June 30, 1979.

PF-36 Fire Water Piping System The Authority is conducting an engineering study to determine actions required to implement the NRC staff position.

A schedule is being prepared for the development of our answers to your concerns on these issues and will be provided to 1978.

It is expected that you by November 8, implementation of all required modif. cations can be completed by December 31, 1980.

PF-37 Oil Room Drain Systems.

The Authority has adopted the Staff Position.

Turbine Lube Oil System and several other drains that could-allow drainage of combustible fluids if improperly positioned, have been checked in In addition, the proper position and locked shut.

the valves have been added to Operations Surveillance Test F-ST-40G titled Locked Valve Surveillance (performed monthly) to provide continuing adminis-trative control.

e

~

~~~w.

,,, _.