Submits Info Re Possible Deficiency in Calculation of LOCA Peaking Factor Shape Limits by the Axial Power Distribution Monitoring Sys
ML20064C646
Person / Time
Site: North Anna Dominion icon.png
Issue date: 10/11/1978
From: Brown S
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 7810230264
Download: ML20064C646 (2)


Text

.

VIRGIN $ A ELECTRIC AND POWER COMP ANY, RICHMOND, VIRGINI A 23268 1

October 11, 1978 Mr. James P. O'Reilly, Director Serial No. 575 Office of Inspection L Enforcement PSE&C/LCK/bep/mc U. S. Nuclear Regulatory Commission

.T Region II Docket No. 50-339 101 Marietta Street, Suite 3100 Atlanta. Georgia 30303

Dear Sir:

On October 6,1978, a report was made under the p ovisions of 10CFR50.55(e)

%g-*n%c a,p_ossible deficiency in the calculation of the LOCA peaking factor

'snfMts 15f^t'he -APDMS hardware for North Anna Unit 2.

~

In accordance with the reporting requirements of 10CFR21, the following information is submitted:

A.

Name and address of reporting individual:

Mr. E. A. Baum. Executive Manager Licensing and Quality Assurance Virginia Electric and Power Company P. O. Box 26666 Richmond, Virginia.

23261 B.

Facility, activity, and/or component affected:

a __

North Anna Power Station, Unit 2

-T Z.

AxiaT-Power Distribution Monitoring System (APDMS)

C.

Name of firm constructing the facility or supplying the component,

~

activity or service.

Westinghouse Electric Corporation Water Reactor Divisions P. O. Box 355 Pittsburg, Pennsylvania 15230

~

D.

Description of defect, deficiency, or failure to comoly:

A similar facility utilizing Westingbouse APDMS hardware for cal-culating the LOCA peaking factor shape limits, discovered a non-conservative error in the computer software which determined the alarm setpoint envelope. This error is caused by a calculational round off which could increase the setpoint above the desired value by as much as 1.1%.

77/0NOMY b

\\

m. -

vmomiA ELECTRIC Ano Powen COMPANY TO Mr. James P. O'Reilly SMaar No.

2 E.

Date of determination of reportability:

October 6, 1978 F.

Similar components, activities, or services:

North Anna Power Station, Unit 1 G.

Corrective action which has been, is being or will be taken, the indi- -

vidual responsible and the length of time to complete the action:

The equipment is not yet operational. A pennanent solution is currently being discussed with Westinghouse.

H.

Other information:

None Any information not available at this time will be submitted in a follow-up letter as a 30-day report.

Should you require further information, please contact this office.

er,

uly curs f[Qi i

Sa C. Brow,

Vi e President - Power ta ion E gineering and Constr t'on cc: Director, Office of Inspection andEnforcement(3) e

'~

p