First Interim Deficiency Rept Re Failure to Provide Seismically Qualified Path for Makeup to Spent Fuel Storage Facility.Proposal Under Review to Install Qualified Lines & Necessary Valves from Common Discharge Pumps
ML20064C409
Person / Time
Site: Sequoyah  
Issue date: 09/14/1978
From: Gilleland J
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 7810190164
Download: ML20064C409 (2)


Text

'

,$C/327/78-023 N

S /225/78-020 TENNESSEE VALLEY AUTHORITY CH ATTANOCC A. TENN ESSCE 374o1 830 Power Building Septe=ber II.,1078 4

g

,e il

~

4 Mr. Ja=es P. O'Reilly, Director

~~

Office of Inspection and Enforcenest H

U.S. Nuclear Regulatory Co==ission Region II - Suite 3100 r

101 Marietta Street Atlanta, Georgia 30303 De.ar Mr. O'Reilly:

,fifQUOTAE NUCLEAR PIANT UNITS 1 AND 2 - SEISMICALLT QUAI.IFID PA2 FOR MAKICP TO SPENT FUI' STOPA:;E FACILITI NOT PROVIDD - NCR ME3 1010 -

[

FIRST INTERL'i REPORT The subject deficiency was initially reported to NRC-CIE Regian II Inspector Bruce Cochran on August 16, 1978.

Enclosed is our first We vill submit our next report by November 3, 1978.

interi= report.

If you have any questions concerning this matter, please get in touch with M. R. Visenburg at FTS 854-2581.

Very truly yours, s

J. E. G111 eland Assistant Manager of Pcver Enclosure Mr. John G. Davis, Acting Director (Enclosure) cc:

Office of Inspection and Enforcement U.S. Nuclear Regulatory Co==ission Washington, DC 20555 PbR Aucy 5 cc327 3 7glo RotG1 5~O - 3 2 5 S.

x i

i

~[

INCLOSURE I

-j 1-

~

SEQUOYAH NUCLEAP PLANT UNITS 1 AND 2 SEISMICALLY QUA1.IFIED PATH FOR MAKEL? TO SPEh"r FUEL STORACE FACILITY NOT PROVIDED NCR ME3 1010 FIRST IhTEFlM REPORT Description of De'ficiency In contradiction to TVA cob.itments in the response to Sequoyah Nuclear Plant FSAR Question 9.31, a per=anent Seis=1 Category I makeup piping syste= f rom the RWST to the spent fuel storage pool was not provided.

t Corrective Action A proposal is under study to install a qualified line and necessary valves from the co= mon discharge of the refueling water purification pumps (RWFP) to the seis ically qualified spent fuel pool eccling loop. Also, all piping, valves, and pu=ps from the RWST to,the common discharge of the RWPP will be qualified.

Upon decision of a final corrective action, a final report will be sub=itted.