Confirms 780915 Notification That Recirculation Spray Sys Does Not Provide Required Flow for LPCI Operational Mode. Vendor Study Underway.Rept Will Be Submitted
ML20064C139
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 10/12/1978
From: Brown S
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
570, NUDOCS 7810170109
Download: ML20064C139 (1)


Text

_ _ _ _ _

VIRGINI A ELECTRIC AND POWER COMP ANY RICHMONO VIRGINI A 23261 i

October 12, 1978 Mr. James P. O'Reilly, Director Serial No. 570 Office of Inspection & Enforcement PSE&C/MGO:bep/mc U. S. Nuclear Regulatory Comission Region II Docket Nos. 50-404 101 Marietta Street, Suite 3100 50-405 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

l. ~

September 15, 1978 that the present recirculation spray system does not pro-Inaccordancewith10CFR50.55(e),theNRC,RegionII,wasnotifiedon vide the flow, as required in the Babcock and Wilcox system description, for the low pressure core injection mode of operation.

The low pressure core injection requirements and the recirlulation spray /

core injection system capabilities are under study by Stone and Webster and Babcock and Wilcox. This study has not been completed, therefore, you should consider this an interim report. A final report will be forthcoming subse-quent to the completion of the study.

If you require any further information at this time, please contact us.

Very truly yours.

Ortnaf t:Hg

(.,

S, C BROWE JR'.

Sam C. Brown, Jr.

Vice President - Power Station Engineering and Construction cc: Mr. John G. Davis, Acting Director 1

Office of Inspection & Enforcement

=

Mr. Harold R. Denton, Director

~

Office of Nuclear Reactor Regulation 7 P/D/7 D/ d 4 9