Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217H0201999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217H0321999-08-31031 August 1999 Revised Monthly Operating Rept for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20212B4711999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20210S2891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20212B4871999-07-31031 July 1999 Revised Monthly Operating Rept for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20210S2951999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4501999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4561999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0041999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206R1811999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9521999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206R1931999-03-31031 March 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20204C9111999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9561999-02-28028 February 1999 Revised Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20204C9161999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Catawba Nuclear Station,Units 1 & 2 ML20199E3071998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Catawba Nuclear Station,Units 1 & 2 ML20198E3151998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 ML20199E3221998-11-30030 November 1998 Revised MOR for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 Re Personnel Exposure ML20198E3261998-10-31031 October 1998 Revised Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20195E5521998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20154L6551998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Catawba Nuclear Station,Units 1 & 2 ML20195E5611998-09-30030 September 1998 Revised Monthly Operating Rept for Sept 1998 for Catawba Nuclear Station,Units 1 & 2 ML20154L6661998-08-31031 August 1998 Rev 1 to MOR for Aug 1998 for Catawba Nuclear Station,Unit 2 ML20153B2921998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Catawba Nuclear Station,Units 1 & 2 ML20237B2531998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Catawba Nuclear Station,Units 1 & 2 ML20153B3071998-07-31031 July 1998 Revised Monthly Operating Repts for Jul 1998 for Catawba Nuclear Station,Units 1 & 2 ML20237B2551998-06-30030 June 1998 Revised Monthly Operating Rept for June 1998 for Catawba Nuclear Station,Units 1 & 2 ML20236Q8071998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Catawba Nuclear Station,Units 1 & 2 ML20236F0321998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Catawba Nuclear Station,Units 1 & 2 ML20236Q8091998-05-31031 May 1998 Revised MOR for May 1998 for Catawba Nuclear Station,Units 1 & 2 ML20247M0251998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Catawba Nuclear Station,Units 1 & 2 ML20247K4451998-04-30030 April 1998 Narrative Summary Pages to Apr 1998 MOR for Catawba Nuclear Station ML20247M0361998-03-31031 March 1998 Revised Monthly Operating Rept for Mar 1998 for Catawba Nuclear Station,Units 1 & 2 ML20217B2271998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Catawba Nuclear Station,Units 1 & 2 ML20217B2341998-02-28028 February 1998 Revised Monthly Operating Repts for Feb 1998 for Catawba Nuclear Station,Units 1 & 2 ML20216E2371998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Catawba Nuclear Station ML20202G8641998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Catawba Nuclear Station,Units 1 & 2 ML20216F4301998-01-31031 January 1998 Revised Monthly Operating Repts for Jan 1998 for Catawba Nuclear Station ML20202G8911997-12-31031 December 1997 Revised Monthly Operating Repts for Dec 1997 for Catawba Nuclear Station,Units 1 & 2 ML20198P3261997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Catawba Nuclear Station,Units 1 & 2 ML20203H5721997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Catawba Nuclear Station,Units 1 & 2 ML20198P3431997-11-30030 November 1997 Revised MOR for Nov 1997 for Catawba Nuclear Station,Unit 1 ML20199C7271997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Catawba Nuclear Station ML20203H5801997-10-31031 October 1997 Revised Monthly Operating Repts for Catawba Nuclear Station, Units 1 & 2,for Oct 1997 ML20211P9771997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Catawba Nuclear Station ML20216K1511997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for CNS ML20216K1611997-07-31031 July 1997 Revised MORs for July 1997 for CNS ML20210L0411997-07-31031 July 1997 Monthly Operating Repts for July 1997 for CNS ML20141H2221997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Catawba Nuclear Station,Units 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20212J1891999-10-0101 October 1999 Safety Evaluation Supporting Exemption from 10CFR54.17(c)re Schedule to Apply for Renewed Operating Licenses ML20212A6271999-09-30030 September 1999 Rev 0 to WCAP-15243, Anaylsis of Capsule V & Capsule Y Dosimeters from Duke Energy Catawba Unit 2 Reactor Vessel Radiation Surveillance Program ML20217H0201999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Catawba Nuclear Station,Units 1 & 2 05000414/LER-1999-004-01, :on 980906,error During Tagout Caused de-energization of Vital Bus & Actuation of Ltop.Caused by Inadequate Work Practices.Individuals Involved Were Counseled1999-09-27027 September 1999
- on 980906,error During Tagout Caused de-energization of Vital Bus & Actuation of Ltop.Caused by Inadequate Work Practices.Individuals Involved Were Counseled
05000413/LER-1999-015, :on 990616,discovered That Auxiliary Bldg Filtered Ventilation Exhaust Sys Was Inoperable.Caused by Improperly Positioned Vortex Damper.Damper Was Repositioned Correctly & Sys Was Retested Successfully1999-09-27027 September 1999
- on 990616,discovered That Auxiliary Bldg Filtered Ventilation Exhaust Sys Was Inoperable.Caused by Improperly Positioned Vortex Damper.Damper Was Repositioned Correctly & Sys Was Retested Successfully
ML20212G2511999-09-22022 September 1999 Safety Evaluation Supporting Amends 180 & 172 to Licenses NPF-35 & NPF-52,respectively 05000413/LER-1999-008, :on 990610,operations Prohibited by TS 3.5.2, Was Violated.Caused by Inoperable Centrifugal Charging Pump. Operators Swapped to CCP 1A & Sys Parameters Were Returned to Normal.With1999-09-21021 September 1999
- on 990610,operations Prohibited by TS 3.5.2, Was Violated.Caused by Inoperable Centrifugal Charging Pump. Operators Swapped to CCP 1A & Sys Parameters Were Returned to Normal.With
05000414/LER-1999-005-02, :on 990727,missed Emergency DG TS Surveillance Concerning Verification of Availability of Offsite Power Sources,Was Declared.Caused by Defective Procedure.Revised Affected Procedure1999-09-20020 September 1999
- on 990727,missed Emergency DG TS Surveillance Concerning Verification of Availability of Offsite Power Sources,Was Declared.Caused by Defective Procedure.Revised Affected Procedure
05000413/LER-1999-009, :on 990518,inoperability of Containment Valve Injection Water Sys Valve in Excess of TS Limits Was Noted. Caused by Inadequate Retest Following Surveillance Test Failure.Valve Was Retested & Returned to Service1999-09-15015 September 1999
- on 990518,inoperability of Containment Valve Injection Water Sys Valve in Excess of TS Limits Was Noted. Caused by Inadequate Retest Following Surveillance Test Failure.Valve Was Retested & Returned to Service
ML20216E5401999-09-0707 September 1999 Special Rept:On 990826,discovered That Meteorological Sys Upper Wind Speed Cup Set Broken,Causing Upper Wind Channel to Be Inoperable.Cup Set Replaced & Channel Restored to Operable Status on 990826 05000413/LER-1999-014, :on 990816,missed Surveillances & Operation Prohibited by TS Was Noted.Caused by Defective Procedures or Programs Inappropriate TS Requirements.Affected Procedures/ Programs Were Revised & Testing Was Performed1999-09-0101 September 1999
- on 990816,missed Surveillances & Operation Prohibited by TS Was Noted.Caused by Defective Procedures or Programs Inappropriate TS Requirements.Affected Procedures/ Programs Were Revised & Testing Was Performed
05000414/LER-1999-004, :on 990616,CIV 2NM-221A Was Returned to Svc Without Testing,As Required by TS 3.6.3.Caused by Programmatic Deficiency.Test Procedure Has Been Revised & Subject Valve Was Successfully Tested & Returned to Svc1999-09-0101 September 1999
- on 990616,CIV 2NM-221A Was Returned to Svc Without Testing,As Required by TS 3.6.3.Caused by Programmatic Deficiency.Test Procedure Has Been Revised & Subject Valve Was Successfully Tested & Returned to Svc
ML20212B4711999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 05000414/LER-1999-003, :on 990612,unplanned Actuation of ESFAS Occurred Due to a SG High Level.Caused by Inadequate Procedural Guidance.Msiv 2SM-7 Was Closed & SG 2A Level Was Returned to Normal1999-08-31031 August 1999
- on 990612,unplanned Actuation of ESFAS Occurred Due to a SG High Level.Caused by Inadequate Procedural Guidance.Msiv 2SM-7 Was Closed & SG 2A Level Was Returned to Normal
ML20211B1281999-08-31031 August 1999 Dynamic Rod Worth Measurement Using Casmo/Simulate ML20217H0321999-08-31031 August 1999 Revised Monthly Operating Rept for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 05000413/LER-1999-012, :on 990727,adverse Sys Interaction Between Annulus Ventilation Sys & Auxiliary Building Ventilation Sys Was Discovered.Caused by Inadequate Design.Compensatory Actions Developed & Implemented.With1999-08-26026 August 1999
- on 990727,adverse Sys Interaction Between Annulus Ventilation Sys & Auxiliary Building Ventilation Sys Was Discovered.Caused by Inadequate Design.Compensatory Actions Developed & Implemented.With
ML20211A9791999-08-20020 August 1999 Safety Evaluation Granting Licensee Request for Approval of Proposed Relief from Volumetric Exam Requirements of ASME B&PV Code,Section Xi,For Plant,Unit 2 ML20211C1291999-08-17017 August 1999 ISI Rept Unit 1 Catawba 1999 RFO 11 ML20211F3441999-08-17017 August 1999 Updated non-proprietary Page 2-4 of TR DPC-NE-2009 ML20210U8341999-08-13013 August 1999 Safety Evaluation Supporting Amends 179 & 171 to Licenses NPF-35 & NPF-52,respectively ML20210R1051999-08-0606 August 1999 Special Rept:On 990628,cathodic Protection Sys Was Declared Inoperable After Sys Did Not Pass Acceptance Criteria of Bimonthly Surveillance.Work Request 98085802 Was Initiated & Connections on Well Anode Were Cleaned or Replaced ML20212B4871999-07-31031 July 1999 Revised Monthly Operating Rept for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20210S2891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2 05000413/LER-1999-009, :on 990518,inoperability of Containment Valve Injection Water Sys Valve Was Noted in Excess of TS Limits. Caused by Inadequate Testing Following Surveillance Test Failure.Valve Was Retested & Restored to Service1999-07-19019 July 1999
- on 990518,inoperability of Containment Valve Injection Water Sys Valve Was Noted in Excess of TS Limits. Caused by Inadequate Testing Following Surveillance Test Failure.Valve Was Retested & Restored to Service
05000414/LER-1999-004-02, :on 990610,violation of TS 3.6.3 Was Noted Due to CIV 2NM-221A Being Returned to Service Without Testing. Caused by Procedure Deficiency.Civ 2NM-221A Was Tested & Returned to Operable Status1999-07-15015 July 1999
- on 990610,violation of TS 3.6.3 Was Noted Due to CIV 2NM-221A Being Returned to Service Without Testing. Caused by Procedure Deficiency.Civ 2NM-221A Was Tested & Returned to Operable Status
ML20209E4361999-07-0909 July 1999 SER Agreeing with Licensee General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation 05000414/LER-1999-003-02, :on 990612,unplanned Actuation of Esfa Sys Due to a SG High Level Was Noted.Caused by Inadequate Procedural Guidance.Long Term Corrective Actions to Prevent Recurrence of Event Are Being Developed1999-07-0808 July 1999
- on 990612,unplanned Actuation of Esfa Sys Due to a SG High Level Was Noted.Caused by Inadequate Procedural Guidance.Long Term Corrective Actions to Prevent Recurrence of Event Are Being Developed
ML20196K6631999-07-0707 July 1999 Safety Evaluation Supporting Licensee 990520 Position Re Inoperable Snubbers ML20209H4501999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20210S2951999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Catawba Nuclear Station,Units 1 & 2 05000414/LER-1999-002-03, :on 990504,plant Was Forced to Shutdown as Result of Flow Restriction Caused by Corrosion of Afs Assured Suction Source Piping Due to Inadequate Testing. Affected Piping Was Cleaned & Flow Tested1999-06-0303 June 1999
- on 990504,plant Was Forced to Shutdown as Result of Flow Restriction Caused by Corrosion of Afs Assured Suction Source Piping Due to Inadequate Testing. Affected Piping Was Cleaned & Flow Tested
ML20209H4561999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196L1881999-05-31031 May 1999 Non-proprietary Rev 1 to DPC-NE-3004, Mass & Energy Release & Containment Response Methodology ML20206T4771999-05-31031 May 1999 Rev 3 to UFSAR Chapter 15 Sys Transient Analysis Methodology ML20206P5201999-05-14014 May 1999 Safety Evaluation Accepting GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20206N8391999-05-0404 May 1999 Rev 16 to CNEI-0400-24, Catawba Unit 1 Cycle 12 Colr ML20196A0041999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206R1811999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206N8261999-04-22022 April 1999 Rev 15 to CNEI-0400-24, Catawba Unit 1 Cycle 12 Colr. Page 145 of 270 of Incoming Submittal Not Included ML20205S5551999-04-21021 April 1999 Safety Evaluation Accepting Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions 05000413/LER-1999-004, :on 990310,operation Prohibited by TSs Was Noted.Caused by Incorrect TS Requirements for Cravs & Auxiliary Bldg Filtered Ventilation Exhaust Sys Actuation Instrumentation.Submitted Lar.With1999-04-12012 April 1999
- on 990310,operation Prohibited by TSs Was Noted.Caused by Incorrect TS Requirements for Cravs & Auxiliary Bldg Filtered Ventilation Exhaust Sys Actuation Instrumentation.Submitted Lar.With
ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML20205N3651999-04-12012 April 1999 Safety Evaluation Accepting IPE of External Events Submittal ML20205N2381999-04-0909 April 1999 Safety Evaluation Supporting Amends 178 & 170 to Licenses NPF-35 & NPF-52,respectively ML20205N2121999-04-0808 April 1999 Safety Evaluation Supporting Amends 177 & 169 to Licenses NPF-35 & NPF-52,respectively ML20206R1931999-03-31031 March 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9521999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205B3101999-03-26026 March 1999 Safety Evaluation Supporting Amends 176 & 168 to Licenses NPF-35 & NPF-52,respectively 1999-09-07
[Table view] |
Text
T k,
[
(OPERATibDATAREPORi bk,.,
i
- 7.
s 9'-
6
-DOCKETNO' 413-aDATEAunust 15. 1990 OPERATING STATUS'
- COMPLETED BY R.A. Williaes
~
TELEPHONE' ' 704-373-5987"
~li Unit kase Cata'wba iL
-2.ReportingPeriod: July 1,1990-July 31[1990
- 3. Licensed itersal Power (pt);
3411
- 4. Naseplate Rating (6 toss Me):-
,1305*
Notes llNaseplateRating
- 5. Isesign Electrical Rating (Net M e): '
1145 -
(Gross Me) calculated as1 6..Marisuo Dependable Capacity (Gross Me):. _1192:
1450.000.MVA'.90 power:
1.
' 7._Marlaus Deper.dable Capacity.(Net Me):
1129, _
'NURE6-0020.-
P factor per Page 111, 8.'If.ChangesOccurLinCapacityRatings_(IteesNumber,3Through_7)SinceLast_
. Report. Give Reasonst' a....
- 9.- Power Level To Which Restricted,:lf Any. (Net Me):
10.' Reason For Restrictions, if any:
- This honth- :Yr.-to;-Date1 Cuaulative L11. Hours in Reporting Period..
744.0 5087.0!
=44616.0!
15
- 12. Number Of Hours Reactor Was Critical 744.0 2745.0;
.32413.8-
- 13. Reactor Reserve Shutdown Hours
- --0--
- --0--
l
- 14. Hours 6enerator On-Line 744.0.
22685.5 31571.5 j
- 15. Unit Reserve Shutdown Hours
--0--
--0--
--0--
- 16. Gross Thermal Energy Generated W H)..
12497718
'8826677-~
1101359782 i
- 17. Gross Electrical Energy ~6eneratid thH).
874691 3092964:
355457851 1
- 18. Het Electrical Er,ergy Benerated (HH) 828187
- 2876600:
'33272978 1 3
19.'UnitServiceFactor 100.0 52.8-70.8 -
20._ Unit AYallability Factor
.100.0 52.B'-
'70.0 4
'21. Unit Capacity Factor (Using MDC Net) _
98.6:
" 50.l ~
-65.6 1
- 22. Unit _ Capacity Factor (Using DER Net) 97.2J 49.4 65.1 23.UnitForcedOutageRate 0.0; 16.9-13.7.J
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each) -
l
~Nnno 25.. lf Shut Down At End Of Report Period. Esticated Date of Startups d
- 26. Units in Test Status (Prior to Coesercial Operation)::
- Forecast
_ Achieved-L!
l INiilAL.CRITICAlliY:
INiilALELECTRICITY COMMERCIALOFERATICN I
j 4
4 9008170237 900815 0
N
{DR ADOCK 05000413 I
PDC 1
l1
+'
ao
..m
< - OPERATI ] DATA REPORT) M 4 * :E o
i' 4
.u 4'
, g.7
,7-
,:;J.
s :. ::-
3 -
' DOCKET NO -
50-413' UNii-
= Catasha 1-
- DATE Aunuit 15. 1990
- )
.EOMPLETED BY - R. A. Willians
-TELEPHONE-704-373-5967=-
MONTH-July'1990 e
m-p QA1 cAVERAGE DAILY POWER LEYEly-l QE!
- AVERA6E DAILY POWER LEVEL,:
(MWe-Net)..
'(MWe Net)2 1
1113:'
6 17 !
1118
-2:
1119 18.
~ 1117-3.
1120 19.
1119
.. o)
-4 1116 20
~ 1115 5
1116 21
- 1113 i
L:
i
.- 6 1114 22-
' 1111
- lt 7
1115 23; 1107 8-
'1110 24 1113-9 1110 25
' 1112 3
10
-1109' 26 1115
.It' 1108
. 27 -
- 1116' 9
12-1112
. 28 111PI
-).
a'
- 14 1097' 30 1112-I
?!
15 1114 31 1112
- q
- 16 1115 H
.n 3
4 i;
u DOCKET NO.
50-413 UNIT SHUTDOWNS AND POWER REDUCTIONS' UNIT NAME GTAWBA 1 DATE us/13/vu REPORT MONTH July-1990 COMPLETED BY s. w. Fivst;M TELEPHONE
(/usj-a/J-diez (1) 2)
3 (4)
(5)
E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTI7E O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
-HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE NO
. SHUTDOWNS OR REDUCTION S (1hForced
'(2 (3
(4 ethod:
xhibit G - Instructions eason-A-Equipment Failure.
1-Manual for Preparation of Data.
'B-Maintenance or test (Explain)
S Scheduled 2-Manual Scram Ent W Sneets For Licensee
~ Event Report (LER (NUEG-0161) )
C-Refueling 3-Automatic Scram D-Regulato n R9striction 4-Other (Explain)
File E-Operator Training & License Examination F-Administrative (5)
G-Operator Error (Explain)
Exhibit I - Same Source H-Other (Explain)-
-o
.._s
_. _. _ _ _ ~ _ _ _. _.. - _ _ _, _. - _.....
~
l i
DOCKET NO:
50 413 UNIT:
Catawba 1 DATE:
08/15/90
- NARRATIVE
SUMMARY
i MONTH: July 1990 Catawba Unit 1 bogan the month of July operating at 100% full power.
The unit operated at or near 100% full ) ser for the entire month, and-:
ended the month operating at 100% full power,
'I t
.i Prepared by:
S. W. Moser Telephone:
704-373 5762' i
i 3
L l
l MONTHLY REFUELING INFORMATION REQUEST i
l Catawba. Unit 1
^
- 1. ' Facility name:
2.
Scheduled next refueling shutdown: March 1991 3.
Scheduled restart following refueling: May 1991
- 4. -Will. refueling 4 or: resumption.of operation thereafter require a technical specification change or other-license amendment? No f
If'yes, what will these be?-
If no, has reload design and core configuration'been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A 5.
Scheduled date(s) for submitting proposed licensing action and supporting i
l information: -N/A l
6.
Important licensing considerations (new or different design or supplier, l
unreviewed design or performance analysis methods, significant changes in.
design or now operating procedures).
7.
Number of fuel assemblies (a)- in the core: 193 (b) in the' spent fuel pool: 264 8.. Present licensed fuel pool capacity: 1418-T l
Size of requested or planned increase:
9.
Projected date of last refueling which.can'be accommodated by present licensed capacity: September 2009 i
I i
DUKE POWER COMPANY DATE: August-15, 1990 2
s Name of
Contact:
J. A. Reavis Phone:
704-373-7567
\\
. w yge 3-
+
~DPERA11 3 OATA REPORT
< ' ~
g' s
en q.,
? --
m
+
J
' DOCKET NO' 50-414L q
.. DATE Auoust 15. 1990,.
.}
sOPERATING STATUS.
-COMPLETED BY-R.A.' Williams i
TELEPHONE 704-373-5987-q
--l.. Unit Kane: Catanta2-2.ReportingPeriod' July 1,1990-July 31,=1990 j
3.LicensedTherealPower(MWt):
3411
- )
~
l4.NaseplateRating(6tossMWe):, _
130$e Notes INaseplate Rating i j
' 5. Design Electrical Rating (Net MWe):-
- 1145:
~(Bross MWe) calculated as J.
6.MaxinusDependableCapacity(6tossMWel:
'1192 -
1450.000 MVA z'.90 power.
l
~
factorperPagelilf
'l
^
7.=MarlausDependeleCapacity(NetMWe)-
=ll29f NUREB-0020i
-l
- 8. If Chinges Occur in Capacity Ratings (Itees Nueber 3 Through 7) Since Last.
- Report. Give Reasonst' i
9.-PowerLevelToWhichRestricted,IfAny;(NatftWe)-
- f
! ReasonForRestrictions,if--any' q
ThisMonth=?Yr.-to-Date-
-Cuaulativei 4
- 11. Hours In Reporting Period 1744.0'-
5027.0
- 34632.0'-
- 12. Nusber Of Hours Reactor Was Critical 0.0 3789.4 (25339.9-'
- 13. Reactor Reserve Shutdown Hours
--0--
'--0--
--0--
F L
-.14. Hours Eenerator On-Line 0.0; 3771~.34 24726.2 L
- 15. Unit Reserve Shutdova Hours
- c
. --0--
l--0--l j
' 16. Srcss Theraal Energy Generated (MW4).
- 0 12157069; 76269669.
17..GrossElectriralEnergyGenerated(MWH)-
.- 0 _
4328211'.
'26944377'-
18.NetElectricalEnergySer.erated(MWHT
-4353:
' 4087007 -
25232023 J!9.' Unit Service factor:
0.0 -
L 74.!!
T 71.4 '
-i 20' Unit Availability Factor-m 0.0 -
? 74.'l -
71.4i 4
. 21. Unit Capacity Factor (Using MDC Net) 10.0-1 71.2,
64;2 1
- 22. L' nit Capacity Factor'(Using DER Net).
.0.0 70.2 63.6.
~23. Unit Forced Outage Rate 0.0
- 1.5 --
15.6.
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):-'
}
Currentiv Dafuelinn
- 25. If Shut Coun At End Of Report Period. Estiaated Da.e of Startup September 4, 1990
-f a
- 26. Units in Test Status (Prior to Coseercial Operation):
Forecast' Achieved 3
INITIAL CRITICALITY-N INlt!AL ELECTRICITY ~
j COMERCIAL DPERAi!ON k
f 9y c
(
a
.T
-j
.n 1-
+! i
.j 4
t
~
4
~OPERATIQDATAREPORT?
M,
-1 2
. j;-
M m
- e --
^{
F n
LDOCKEI NO '
50-414 t
, UNIT-
- Catasha 2-
- DATE Aunust 15. 1990'-
..t ilCOMPLETEDBY? R.A; Willians [
j c
JTELEPHONE >704-373-5987' A
..o
- 'l
- (
1'
!j
^
, MONTH July.-1990-R r
.c u
R;
- AVERAGEDAILYF0WERLEVEL, QM.
cAVERA6EDAILYPOWERLEVEL.
~(Me-Netif
- (Me-Net)f q
3-
- lif
-0
,.17,
. 0 --
4 y
- l
'E 0-16; O
o+
y
-l 3 :-
0-
' 19 J
-il "O
g 4 3
. i o
4 0
20
'0-
's
-r t[
4
!5!
' ~ 0 -~
21 0
y
- 6.
0-
= 22 0'
1 7
0 23 '
'0'-
1
^
0
'j
\\
B 0
x 24 q
.f E~
92 0
25 '.,
0 1
.t 0
101
'0' 26' i1 0
27 "0'
i1 12
'O 'O i
13 - 29.
' 0'-
~
m gg -
o--
- 30 -
"0-(
15
~ ~0
.' 31 -
0 1.
i
i
. 16 0
i
}
t h
T i
t
.i
(
. f-r at:
.~
{
UNIT SHUTDOWNS AND POWER REDUCTIONS-DOCKET NO.
50-414 UNIT NAME CATAWBA 2 DATE u s/1:>/ 9 u REPORT MONTH'-
July 1990 COMPLETED BY s.
w.
rivst x TELEPHONE
( / v4 ) -J / J -:> / t>z,
l (1) 2)
(4)
(S)
E HOD
.T A
OF.
. LICENSE
.N Y
S SHUT EVENT SYS-CAUSE AND COFRECTIVE-r C
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE 2
90 1 S
744.00 C
1 RC FUELXX END OF CYCLE
'3' REFUELING OUTAGE (1)
(2)
(3)
(4)
F Forced Reason
Exhibit G - Instructions S Scheduled A-Equihment Failure'(Explain) 1-Manual for Preparation of. Data B-Maintenance or. test 2-Manual Scram-Ent W Sneets For Licensee C-Refueling 3-Automatic Scram Event Report (LER File (NUREG-Ol61))
D-Regulatory Restriction 4-Other (Explain)-
E-Operator Training.& License Examination F-Administrative.
(S)
G-Cperator Err 9r (Explain)
Exhibit I - Same Source H-Other (Explain)
..+.q.-
y.
--w.
y s
g s
,.w.y.r
u c-se
, td l
. }i:.
^;- h
,a
(
)
.2 ?
=. i
.; 9 1
n
(
C
.'t*
! DOCKET N0i-50 414-
[
l UNIT:_ Catawba-2'
^
.'DATE:. 08/15/90',
't 1
i NARRATIVE'
SUMMARY
~
.f 1-i 1!
y;
MONTH:- July 1990 Catawba Unit 2: began' thel month of. July' shut.down for its-- End Of-Cycle, i
"3" refueling. outage. The unit remainediin(tS-outage for theJentire..
month.
t i
.f
. j.
t
'i s
a
.- [
t I
t
+
_.b
_.I C
.d
/r i
2 Jj i
\\
, a l
1 1-1 L
=f
.i y
t i-t A
- .{
j-o.
g i
.I e
. Prepared"by: = S.'W. Moser j
Telephone:
.704.-373-5762
't i
i,.
I-r 4
,.m o.
,.4.
,~c a
1 J
l MONTHLY REFUELING INFORMATION RE0 VEST 1.
Facility name: Catawba. Unit 2 l
2.
Scheduled next refueling shutdown: Currently Refueling 1
3.
Scheduled: restart following refueling:
September 1990
-4.
Will refueling or. resumption of operation thereafter require a technical; specification change or other license amendment? No If yes, what will these be?
If no.:has reload. design and core configuration been reviewed by Safety l
Review Committee regarding unreviewed safety questions? N/A 5.
Scheduled date(s) for submitting proposed licensing: action and supporting information:
N/A.
~
6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
Number of fuel assemblies.(a) in the core:
193 (b) in the spent fuel pool:
204-j i
8.
Present. licensed. fuel. pool capacity:
1418
~
Size of requested or' planned increase:
i 9.
Projected date of last refueling which can be_ accommodated by present licensed capacity:
September 2011 i
i DUKE POWER COMPANY DATE:
August 15, 1990 Name of
Contact:
J. A. Reavis Phone:
704-373-7567 J
.