ML20063Q092

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Jul 1990 for McGuire Nuclear Station Units 1 & 2
ML20063Q092
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 07/31/1990
From: Moser S, Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20063Q091 List:
References
NUDOCS 9008170230
Download: ML20063Q092 (10)


Text

.,, o 1

o/

i i

OPERAllN6DATAREPORT-I DOCKETN0 50 369 LATEAunuit 15, 1990 -

1 OPERATING $1ATUS -

COMPLETEDBY R.A, Wl'11ans-ti TELEPHONE 704 373 59B7 j

l. Unit'hase: McGuire 1...

1 2.Reportingferiod: July 1,19904uly31,'1990 1

3. Licensed Thereal Feuer (Nt):

3411

5. Design Eledrical Rating (Net Me):

!!B0 '

(6 toss Me) calculated as.

]

4.NeeeplateRating'(6ross.Me):

1305'.

Notes eNaseplate Rating.

6. Marious Dependable Capacity (6 toss Me) -

1171 1450.000 M A.90 power-

7. Manteue Dependable Capacity.(Net Me):'

1129

!factorperPagelit,-

B. If Changes Occut'in Captity Ratings littes.Nueber 3 through 7) Since last-

.NURE6-00202

Report. Give Reasons (-

-l n

9. Power Level To Which F.estricted, if Any (Net Me):'

10.-ReasonforRestrictions,ifany

This Month" Yr.-to4 ate Cumulative.

11.HoursinReportingPeriod

. 744.0 -

5087.0 75959.0'

12. Nueber Of Hours Reactor Was Critical 744.0

'1957.3 52B15.5 13.ReactorReserveShutdownHours-

--0--

--0--

14. Hours Senerstor On-Line

. 744.0 ;

1901.2-52200.1-15.UnitReserveShutdownHours

?--0--

--0--

16.GrosstherealEnergy6enerated-(NH)

F494B95 :

5781285 157182018-17.- Bross Electrical Energy Generated (NH) 839016 1928839' 54156516-

19. Net Electrical Energy.Benerated (HH) 807026L

1816265' 51702640;

19. Unit Service Factor
100.0.1
37.4 68.7
20. Unit Avallability Factor f 100.0 -

_37.4 68.7s

21. Unit Capacity Factor (Using MDC Net) 96.1 31.6 58.8-

' 22. Unit Capacity Factor (Using DER Net) 91.9 30.3 57.7

23. Unit forced Outage Rate '

O.0 B.7' 12.2' L E4. Shutdoun Scheduled Over Next 6 Months (Typei Date, and Duretten of Each):

5 None-

- 25. If Shut town At End Of Report Period. Estiented Date of Startup

26. Units in Test Status (Prior to Coseercial Operation) -

Forecast-

, Achieved

'INITIALCRITICAlliY INITIAL ELEtiRIClit COMERCIAL OPERAi!0N 9008170230 900815 PDR ADOCK 05000369 R

PDC g

b

m a-r..

. P ERAi! D M14 REPORT'

,4

,n

.; 9 -

y s'

. 49 1

4 s

<q

.f--

I Q<

,1:

';! =

ti: ' DOCKET NO 50 369 Wii kEuire I MTE ' et 15.1990 COWLEin BY A h lliant

- 1ELEPHONE 7M 373 5987 s

s

- MMiH h1v.1990

-:i 4

'QE AVERAGEDAILYPOWERLEVEL-

< DE-AVER 40E DAILY POWER LEVEL (MWe-Net)-

dMWe-MetI~-

w f '.,>.

i 1093

17.

-1992 m-2~-

1987 "

1B 1079 1

a.,

7u.

.3-1090 19 :

002 -

1 s

y 5 --

1095 21.

1091-4 6

1091-

- 22

-1091' 7

1084

'E3 1009 L

8

-1097

- 24 1082 9

'1092' R5:

1079 10 1091 26 1079\\

-11 1091 E7 1079~

12 '-

1089 EB' 1060 13 1078-29.'

~1081'-

'i - A v

14 1094 30 1084 If IMB 31-1084-1 i

-16 1077 l:

,{'

3 4-

)$

k '.

i i

1:; g, ];,.

'l

~

s

r l

i UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-369

~

UNIT NAME ntbu ixt. 1 DATE oaf 13/ v u REPORT MONTH July 1990 COMPLETED BY s.

w.

nudt,rt l

TELEPHONE t/uej-J/J->/b4 (1) 2)

3 (4)

(5)

E HOD T

A OF LICENSE N

Y S

SHUT EVENT SYS-CAUSE AND CORRECTIVE O

P DURATION O

DOWN REPORT TEM COMPONENT ACTION TO DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S

'(1 (2)

(3)

(4)

Forced Reason:-

Method:

Exhibit G -

nstructions

.S Scheduled A-Equipment Failure (Explain) 1-Manual for Pre rat on of, Data B-Maintenance or test 2-Manual Scram Entry S

_ts For Licensee C-Refueling R9striction 4-Other (Explain)

File (

G-0161))

3-Automatic Scram Event Re rt (LER D-Regulatory E-O rator Training te License Examination F-A ministrative (5

G-Operator Error (Explain) xhibit I - Same Source H-Other (Explain)

, _ ~ _

-.. ~....

i g

j

,. i 1

i L

i-1 4

(1.'

DOCKET NO:

50 369

. UNIT: McGuire.1 DATE:

08/1$/90-i' NARRATIVE SUMMAAY MONTH: July 1990 McGuire. Onit 'l began.the month of July operating at.100% full power.,

The unit operated at or-near 1006_ full power for the-entire month, and 4

ended the month operating at 1004' full power.

i-j r

i i

=

.o Prepared by: -- S; W. Moser Telephone:

.704 373 5762 m-2-

4' 1

i :

l i

4 i

s J

MONTHLY REFUELING INFORMATION RE0 VEST 1.

Facility name: McGuire Unit 1 2.

Scheduled next refueling shutdown: July 1991 3.

Scheduled restart following refueling: September 1991 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? No If yes, what'will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A t

5.

Scheduled date(s) for submitting proposed licensing action and supporting information: N/A 6.

Important licensing considerations (new or different design or supplier, f

unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of fue' asremblies (a) in the core:

193 (b) in the spent fuel pool:

445 8.

Present licensed fuel pool capacity:

1463 Size of requested or planned increase:

[

9.

Projected date of last refueling which can be accommodated by present licensed capacity: March 2006

-5 1

l L

b DUKE-POWER COMPANY DATE:

August 15. 1990 Name of

Contact:

J. A. Reavis Phone:

704-373-7567-i s

v

,n.

w

OPERAll ] CIA REPORT' Y

J g.

L

. - <. = _

jif

/

DOCKET NO 50370 MTEtiumt 15, 1990 DPERATING STATUS COMPLETEDBY R.A. V1111 ass TELEPHONE 704 373 5?t7

1. Unit Names McGuire 2 :
2. Reporting Feriod: July 1,1990 July 31,1990

'3.LitensedthersalPtwer(MWt):

'3411

4. Kaseplate Rating (6 toss Me):

13054..

Notes:eNeetplateRating _

, $. Design Electrical Rating (Net We) -

!!B0 (6 tons Me) caltvlated as, 16.' Marious Dependat,le Capacity ($ross Me):^ 1171 1450.000 MVA :.90 peser,

7. Marious Dependable Capacity thet M e):

!!29 factor per Fate lit, B.-If Changes Occur in Capacity Ratings.(!!ees Nueber 3 Through 7) Since Last NURE6-0020.

Report. Give Reasons:

9. Foner Level is Which Restricted, if Any (Net Mhell

.10. Reason For Restrictions, It anyt r

This Month' Yr.-to4ste -

Cueulative

i
11.HoursInReportingPerted-744.0 5087.0 56255.0
12. Number of Hour: Reactor Was Critical 744.0

'5007.0 43789.8

13. Featter Resene Shu' tdown Hours 44-- -

' 4--

14.HoursBeneratorOnLine 744.0 5087.0-43015.0.

13.UnitReserveShutdownHeurs -

a4-- -

16. Gross Thernal Energy Benerated (MWH).

2492907 16985168.

140246438=

17.GressElettricalEnergyGenerated(MHi 861211.

5948116-49130777

18. Net [lectrical Energy Generated (MWH) 028325 5729017-

-47131914.

19.UnitServiceFattor.

100.0 100.0-

- 76.5.

20.UnitAvailabilityFactor.

-100.0 100.0-

' 76.5 -

21. Unit Capacity Fatter (Usint MDC heti

'. 9E.6 '

.99.8 72.0-

22. Unit Capacity Factor (Using DER Net) 94.3-

'95.4 71.0

23. Unit Forced Dutage Rate c 0.0

,0.0'

.24.ShutdeunScheduledOverNext6fonths(Type,Date,andDurationofEacht:.

^

9.1

.' l Refuelina'- September 13. 1990 - 11 weeks-25.' If Shut Doun At End Of Report Period. Estleated Date of Startup:

26. Units in Test Status (Prior to Consercial Operatienli

-Forecast

.Achttved--

.INITIALCRiflCAllif-INITIALELECTRICITY COMMERCIAL OPERAllDN

..[

n

?

a,q;. 'i '

g g gp

t 3c,u h

g,;

-.1*

n, 2

-c.,

l. ij,:

"T.'

.t-:

H DOCKET NO

-50370' x

'E

, - ll1111 -

kBulte 2 DATEAunust 15. 1990 3.,

. COMPLETED BY - R. A. Willines

~

~

b

- TELEPHOIE 704 373-5987 l Pain ^

hiv.? 1990

i. N

'A R RA6E M ILY F0llER LEVEL.-

Dit AVERAGEDAILYP0llERLEVEL INte+ Net)

. %-liet) t 1124

= 37..

1119 2

+

~ 116

'll '

1119-

'l i

. 2-1

- 3z

-1101 19.

1119

- 4.

1127~

. 20 1120' 3

51 1!27 El-1108

..c.

6-1122

- 22

'1118-i 7

1087-23 1117 8'

til5 24 1110 0

9-1123

. 25 1079-10 1122 26 J 1072' il 1120

' 27 1107--

12' 11P5 29 1110 13 1124 29 1110' 14 1097' 30 1113 15

!!27 31 1114-

[

'16 z-

'l'121 4

i

..?

I

'c Jr

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET'NO.

50-370

~

UNIT NAME nwu1Mt. 2 DATE uuf id/ vu REPORT MONTH July 1990 COMPLETED BY s.

w.

w:> t.M TELEPHONE

( i us j -> e J-> e t>e (1) 2)

3 (4)

(5)

E HOD T

A OF LICENSE N

Y S

SHUT EVENT SYS-CAUSE AND CORRECTIVE O

P DURATION O

DOWN REPORT TEM COMPONENT ACTION TO DATE E~

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S (1) 1 (3)

(4)

F Forced dewson:

Method:

Exhibit G - Instructions A-Equipment FailureB-Maintenance or test (Explain)

S Scheduled 1-Manual for Preparation of, Data 2-Manual Gcram EntW Sheets For Licensee.

C-Refueling 3-Automatic Scram Event Re rt (LER D-Regulatory Restriction 4-Other (Explain)

File (

G-0161))

E-Operator. Training Er License Examination F-Aministrative (5)

G-Operator Error (Explain)

Exhibit'I - Same Source H-Other (Explain)

,4+-.--.-

,m

-..m-

7____-.......

M'

.,i.

i'

~

4 4

r f'

w s,l 3,

j

-y-f i

s c

.j 91 2

,1

- DOCKET No:. 50 370 UNIT:.McGuire 2 DATE: 08/15/90

. i NARRATIVE

SUMMARY

i MONTH: July 1990 '

McGuire Unit 2 b'agan the; month of July operating' at 1004 full power.

~

The unit operated atior near 1004'fuil power for.the' entire month, and ended the month operating at:100% full power.

't m.

i 4

l-H

'i e

i Prepared by:' S. W. Moser Telephone:-

704 373 5762 1

1

+

k p.

i

]

i l

1 MONTHLY REFUELING INFOXMATION REQUEST l

1.

Facility name: McGuire. Unit 2 2.

Scheduled next refueling shutdown:

September 1990-3.

Scheduled restart following refueling:

November 1990 4.

Will refueling or resumption of operation thereafter require a technical-specification change or other license amendment? Noo 1

If yes, what will these be?

4 If no, has reload design and core configuration been reviewed by Safety.

Review Committee regarding unreviewed safety questions? N/A i

5.

Scheduled date(s) for submitting proposed licensing action and supporting information:

N/A 6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant' changes in design or new operating procedures).

l 7.

Number of fuel assemblies (a) in the core:-193 (b) in the. spent fuel pool:

590 8.

Present licensed fuel pool capacity:

1463 l_

Size of requested or planned increase:

L L

9.

Projected date of last refueling which can be accommodated by l

present licensed capacity:

December 2003 i

l l

]

DUKE POWER COMPANY DATE:

. August 15, 1990 Name of

Contact:

J. A. Reavis Phone:

704-373-7567

_